HomeMy WebLinkAboutSECTION 4 COTTONWOOD AND IDA PHASING 3-1-21COTTONWOOD + IDA SP1 SUMITTAL || JANUARY 2021 page 73 PHASING DEVELOPMENT & PHASING SCHEUDLE CONCURRENT CONSTRUCTION PLAN SECTION 4 4.00 4.01 COTTONWOOD + IDA SP1 SUMITTAL || JANUARY 2021 page 74 FINAL DEVELOPMENT AND PHASING SCHEUDLE The development schedule for the project is contemplated to be competed in one phase over the course of two years. Pending the final approval of the plan it is expected for construction to start on botht the off-site infrastructure and the on-site construction in May of 2021. See detail of scheudle below. FINAL PHASING PLAN COTTONWOOD + IDA SP1 SUMITTAL || JANUARY 2021 page 75 CONCURRENT CONSTRUCTION PLAN The Cottonwood & Ida project includes the construction of five new buildings and renovation of one existing building with mixed use of commercial, multi-family residential and office/retail. Two of the proposed buildings of which will be built on top of a podium above a parking garage. A courtyard/plaza, interior to the site, will be a publicly-accessible space. These buildings will be constructed in a single phase. Off-site infrastructure improvements will be necessary in conjunction with the aforementioned site improvements. The Developer proposes concurrent construction of off-site infrastructure improvements in order to satisfy the infrastructure needs of the project (water, sewer, storm drain and transportation) while progressing the construction of the on- site parking structure, buildings and appurtenances. The full concurrent construciton application is provided in Appendix R.