Loading...
HomeMy WebLinkAboutRC- SP1 COTTONWOOD AND IDA 3-1-21RCREVISION AND CORRECTION SUBMITTAL FORM REVISION AND CORRECTION FORM PROCEDURE This form is for changes or corrections to an existing application. Additional or revised plans or documents will not be accepted unless accompanied by this completed form. Fees are required for third and subsequent revisions. SUBMITTAL REQUIREMENTS 1.A completed RC revision/correction submittal form. It must be the first item in the resubmitted set. 2.Ensure all original and updated plans and documents are included in the file and meet digital naming protocol. Each individual document or plan sheet must have a proper name and date. Ensure that each file name isn’t too long, doesn’t have any spaces (use capital letters to delimit words), and includes the name of the item. Digital version of all materials as a JPEG or PDF. No individual files will be accepted that are larger than 20 MB. Files that are larger must be broken down into smaller files. Ensure the layers are flattened. 3.Revised drawings must be updated with a new current date on each revised sheet. Title sheet table of the contents/plan schedule must be updated with new dates for each sheet modified. Retain the original date on sheets that have not been updated or revised and include them with the submittal. 4.A written narrative that shows an itemized summary of your submittal and description of each change or revision in detail. Changes to plan sheets must include sheet and detail numbers. 5.All changes must be clouded or highlighted on each plan set. 6.Legal documents, studies, letter or other documentation must have a clear date of revision on the front page. 7.Re-submittal of plans must be complete plan sets. No individual sheets will be accepted. Community Development APPLICATION FEE Fee (after third and subsequent submittal) 1/4 of the total original application fee SUBMITTAL INFORMATION Application File No: Application Type: Project Name: Contact Name: Phone: Email: SUBMITTAL TYPE NEW CHANGE: A revision or change that the applicant has made to a plan that is currently under review that is new and has not been reviewed before. CORRECTION: A correction to the plans that is an applicant response to a correction letter written by the City to the applicant. If both types are being submitted, the written narrative must clearly differentiate between changes and corrections. If there are changes to preliminary approved plans or approved plans, please use the modification application process (MOD application). Revisions and Corrections Submittal Form Page 1 of 2 Revision Date: January 2021 REVISION AND CORRECTION SUBMITTAL FORM CONTACT US Alfred M. Stiff Professional Building 20 East Olive Street Bozeman, MT 59715 phone 406-582-2260 fax 406-582-2263 planning@bozeman.net www.bozeman.net/planning Revisions and Corrections Submittal Form Page 2 of 2 Revision Date: January 2021 memo To: Susana Montana-Senior Planner | City of Bozeman From: Erik Nelson – Owner- Architect -Representative Cottonwood and Ida CC: Date: 1-29-2021 Re: SP1 Cottonwood and Ida: Revisions and Corrections (RC) Plan File #20234 Narrative: We received comments from your department on September 10, 2020. After much coordination with your office, our consultants, ownership, and other city departments, we are providing our response to the comments and associated corrections. Many of the comments translated across multiple sheets or pages; however, we have provided reference to pages where information can be found updated either on the plan sheets or in the document sets. We have updated all sheets and sets with current names and title sheets, along with a full set of the submittal documents for your review and approval. Thank you for your time in reviewing these corrections, and please let us know if you have any questions that may be easily and quickly responded to so as not to delay the approval timing of this project. We look forward to completing this project and would like to begin construction as early as May of 2021. Sincerely, Erik Nelson RESPONSE TO FIRST REVIEW COMMENTS SP1, January 29, 2021. P a g e | 2 August 25, 2020 Erik Nelson Thinktank Design Group, Bangtail Partners LLC and Imperial Development LLC erik@thinktankarchitecture.com RE: Cottonwood and Ida (“Tinworks”) Phase 1 Site Plan, Application No. 20234 for the property located at 615 East Cottonwood Street, Bozeman, MT. Dear Erik: Your July 1, 2020 Phase 1 Site Plan applications for the above-referenced property has been reviewed by the City’s Development Review Committee (DRC) at their August 19, 2020 meeting; their comments are attached. If you have any questions about the following comments, please contact the agency reviewer directly. Please note that Engineering Department comments will follow in a separate message by the end of the week. Please feel free to contact me directly at 406-582-2285 or smontana@bozeman.net. Thank you. Sincerely, Susana Montana, Senior Planner, Department of Community Development 20234; Cottonwood and Ida Phase 1 Site Plan 1st review comments— Susana Montana, Senior Planner, Community Development Department; 406-582-2285, smontana@bozeman.net 1. The project has been renamed “Tinworks”. I expect we will rename the PUD the same name so, in the future, staff can find the PUD regulations when use or building applications are submitted. Please rename the project on subsequent submittals and rename the footer on all documents with the new name and date of submittal. Please use the acronym “FPUD” rather than “PUDF”. • All sheet names have been changes to match COTTONWOOD AND IDA FPUD “TINWORKS” • The one exception is our CCR’s are going to be titled Tinworks – see notes from legal referencing page 19 of the CCR’s RESPONSE TO FIRST REVIEW COMMENTS SP1, January 29, 2021. P a g e | 3 2. 38.300.020. Land Uses. a. Building A: apartments and commercial uses are principal permitted uses in the PUD. b. Building B: apartments are a principal permitted use in the PUD. c. Buildings C, D and E: Rowhouses are a principal permitted use in the Northeast Historic Mixed-use (NEHMU) District and the PUD. d. Building F: Office and restaurant use are principal permitted uses in the NEHMU District and PUD. In the NEHMU District, restaurants are limited to 1,500 square feet (sf). However, the PUD allows restaurants up to 2,200 sf without outdoor seating and allows up to 3,000 sf with outdoor seating. The proposed restaurant of this site plan is 2,282 sf— does it have outdoor seating? I don’t want to be picky about 82 sf. • The restaurant plan has been update to reflect 2,200 sf, the outdoor seating is also indicated as 775 SF and both items are indicated on AS.11 – building F e. Page 16 of the Appendix L CC7Rs, states that the following uses are not permitted: “a. No automobile fuel sales or repair shall be allowed. b. No tattoo parlors, marijuana dispensaries (medical or otherwise), vape shops, and laundromats.” Note that auto gas stations and service establishments are principal permitted uses in the NEHMU District and staff cannot be reviewing CC&Rs for compliance with a site plan or building permit. Only the Owners Association can enforce this restriction and via a civil process. As for the uses of subsection b above, retail, general service uses are principal permitted uses in the NEHMU District, and personal and convenience service uses are Administrative uses therein. Medical marijuana uses are limited by 38.360.170. City staff cannot and will not enforce CC&R restrictions. You should have those limitations in any commercial lease agreement for non-residential space within the Site. • Acknowledged f. The application is labeled “Phase 1” but the narrative states that the development will be built in one phase. Why is it entitled Phase 1? • The project is indeed planned for one phase – the title is incorrect. g. If this is a phased development, describe how the public infrastructure will be completed with the first phase. • See f. above – all of the infrastructure will be completed in the one and only phase. 3. Lot assembly. The Preliminary PUD conditional-approval requires the existing 24 lots and 16-foot wide alley to be assembled into developable lots. Your subdivision application no. 20191 seeks to combine those lots and the alley into three new Lots A, B and C. The new lots will show and label the appropriate easements and will show General Notes regarding the affordable housing RESPONSE TO FIRST REVIEW COMMENTS SP1, January 29, 2021. P a g e | 4 requirement for 7 dwelling units in Building B, Lot A, as well as for public accessible open space areas including the Mill Yard plaza. • An Amended Plat has been filed along with all of the associated easements referenced above and a copy provided in Appendix U. 4. 38.220.080. Site Plan. Please label the width of the “emergency vehicle access” travel lane on both the north and south portions. Some sheets label it as a 20-feet wide access easement and other sheets label it as 15.66 ft (Sheet L2.01), 14.23 ft (L2.00), 16.23 ft or 17-ft. Please be consistent with the widths of this emergency vehicle access lane on all sheets and, in particular, on Sheet AS.01—the overall site plan sheet. Also, please be sure that the lane has 20-feet width of pavement per the Fire Department requirements. • The width of the EVA has been noted on Sheet C2.0, L2.01 & AS.11 with the South access as 16.35’ (16’4”) and 20’0” for the North access [as approved by BFD – see comment from Scott Mueller below] 5. 38.220.080. Sheet AS.01 also has an image of the off-site leased parking lot. That development requires a separate building permit and sketch plan. I counted 82 parking spaces rather than the noted 83 spaces. Please also provide the required number of ADA-compliant spaces. Lastly, the parking lot lease found in Appendix J, page 1, is a 25-year lease for 62 parking spaces on lot 801 and 803 N. Wallace Avenue. Is there another lot to be leased for the remaining 21 required parking spaces? • Acknowledged, that the off site parking will require a separate building permit and site plan – one has been submitted (plan file # 191197), though we are expecting revisions to this, in either event a total of 83 spaces minimum will be provided. The current plan on AS.01 does show 83 spaces. 6. 38.220.080. Sheet AS.03, Site Usage Information Plan. Please label widths of the required rowhouse open space areas per 38.360.240.E.1 which should be 12-feet wide on all sides of the rowhouses. • Rowhouse open space areas have been dimensioned and indicated on Sheet AS.11 (showing the interface with actual level 1 of the rowhouses) this is also noted on AS.03 Site Usage 7. 38.220.080. On the Site Plan, please show the location of the existing well that is proposed to remain and be used for irrigation purposes. I see it on Sheet L1.01 but it should also be shown on the site plan sheet. • The existing well that is proposed to remain is indicated on AS.02 8. 38.220.080. Please show and label the stormwater wells on the site plan. Please add a note identifying what entity maintains them to City standards. There are 4 project-related dry wells on City property: #1 and 2 on the City park; #3 in the Aspen ROW; and #4 in the Ida ROW. We will need an executed encroachment permit recorded for those facilities with clarification therein as RESPONSE TO FIRST REVIEW COMMENTS SP1, January 29, 2021. P a g e | 5 to what entity maintains them to City standards. This general note should also be shown on the plat. • All chamber systems have been labeled on Sheets C2.0, C2.1, and C2.2. A note has been provided stating that all chamber systems are to be maintained by the Property Owners Association. 9. 38.220.080. On Sheets AS.10 and 11, there is a legend for the red line showing a “setback”. What is that setback referring to? It is not showing the 8-foot front setback because the line abuts the building footprint. Please clarify. • The FPUD provided for an 8’ setback along Ida and sheet AS.10 and AS.11 has removed the red- 10’ line 10. Please label the width of the driveway width on both sides of the woonerf. • The woonerf has been dimensioned on both ends. It is 20’ noted on AS.02, however at all points behind the garages there is a backing distance of 26’ noted on AS.11 11. On a separate detail sheet, please show the turning movement for a truck accessing the garage from the woonerf—indicate how many turns to enter the garage is needed. • Per discussion with COB and Planner this item is not required, however of note a min 26’ backing distance for all garages has been provided from the woonerf. 12. 38.220.100, Landscape Plans. Subsection C identifies the content requirements of landscape plans. Subsection C.7 asks for the quantity of each specie to be planted and number 17 asks for the size of each specie at planting and at maturity. Please amend the Planting Legends on the landscape plan sheets to add a column for the number of each specie to be planted and add a column of the size of each specie at maturity. Subsection C.20 also asks for a sheet showing front and side elevations of buildings, fences and walls with the landscaping next to it shown; please provide those exhibits. It appears that there is a privacy wall on the west side of Building A that has no vegetative screening; please clarify. • The Number of Species and Site at Maturity pvided on the Master Plan Schedul, See Sheet L3.00. Conceptual design for Utility Screening Fence provided on detail 4/ L6.03 13. 38.220.100. Please be cognizant of the City’s Street Tree Guide for appropriate species of street trees and planting guides. • The City’s Street Tree Guide was reviewed, all proposed street trees species are within the City’s Street Tree Guide. 14. 38.320.020 and PUD relaxation number 6. On Sheet L1.01, please label the square footage and percent of the total site that is landscaped and has pervious surface materials and label the total lot coverage of the Site. Relaxation 6 allows a maximum lot coverage of 45%. a. Sheet L3.03, please be sure trees are not located within utility easements. RESPONSE TO FIRST REVIEW COMMENTS SP1, January 29, 2021. P a g e | 6 • The 10-foot circles from the trunk has been added to the plans to show the 10-foot off set. b. On Sheet L1.01, and elsewhere, please label the width of the “Concrete courtesy access path” along the Site frontages. Please also label the width of the sidewalks within the ROW. Do they meet City standards? • The Concrete Courtesy Path widths are provided on sheet L2.00 & L2.01 and meet the City Standards c. Please show the snow storage areas on the landscape plan sheets. • Snow storage areas are added to the landscape plans, much of the snow is planned to be hauled from the site. Se note added to Sheet L5.00 regarding the amount of snow permitted to be stored on the landscape areas. d. Please label the dimensions of landscaped setback areas and sidewalks. • The setbacks shown on both layout plans L2.00 & L2.01 as well as L3.01 & L3.02 15. 38.320.050, PUD relaxation number 3, the PUD requires an 8-foot “front” setback from the property line for all buildings; please label those dimensions. • The setbacks have been indicated on Sheet AS.02 and is only located on Ida frontage, all other front setbacks are dimensioned as 10’ and shown on the plans. 16. 38.360.240. F.1, Architecture. On Sheets AS 22 through 24, building elevations of the rowhouse buildings, please list and label the three articulation features per façade at intervals no greater than 15-feet per 38.360.240.F.1. • Sheet AS.21 indicates the rowhouse articulation features per façade. a. Please label the transparency elements of Building B’s west façade and Building F’s west façade. On Sheet AS22, it refers to AS 21-24 for transparency calculations. Please do not show requirements that do not apply to the PUD and Site Plan; list what elements of the project meets applicable standards. • Transparency elements of Building B are the windows indicated on the plan. • Building F West façade does not require any block frontage standards- transparency calculations have been removed for the west side • Requirements for all block frontages have been updated to the specific buildings and provided on sheets AS.04, AS.21-AS.24. and items have been listed. b. Please describe which facades are “storefront” Block Front facades and which are “landscape” Block Front facades. I believe Buildings A, B and C along the Aspen frontage RESPONSE TO FIRST REVIEW COMMENTS SP1, January 29, 2021. P a g e | 7 are Landscape Block Front facades; Buildings C, D and E along Ida are Landscape Block Frontage facades; and Building F and G along Cottonwood are Storefront Block Front facades; please clarify. • The Block frontage facades have been updated on sheets AS.04 & AS.21-As.24 17. 38.420.020. A, Parkland. It is noted on Sheet AS.03, Public Park Land Dedication Tracking Table that you are requesting to pay an in-lieu fee for the 0.73-acres of required parkland. Please coordinate your request and application with Ms. Addi Jadin, Parks Planner with the City’s Recreation and Parks Department. • Acknowledged and understood. 18. 38.550.070. B, Screening of service areas. I do not see a loading parking space. With 73 dwelling units, many of them rentals, there is a need for a moving van-size parking space. The commercial tenants are likely to also have service trucks and vans deliver goods. Please show where a loading zone will be located and how it would be screened per 38.520.070.B. Please also screen meters, electrical panels and other mechanical equipment per Subsection B. • Per discussions with COB Planning this was an advisory comment and not a requirement. Tanya Andreasen, City Affordable Housing Manager, tandreasen@bozeman.net • See all updated information addressing these concerns and other edits requested by the City Affordable Housing Manager in Appendix Q On page 5 of Appendix Q., the Notice of Restricted Use of Lot A, the Restriction section defines Affordable Housing and how much income is required for an affordable home. Please take a look at the sentence, “Further, affordable housing does not require greater than 33 percent of the household gross annual median income for housing”. The last word, “housing” is sometimes further defined as housing costs, and includes rent, and basic utilities such as water, electricity, and gas. Housing costs calculations can also include HOA fees, ground lease fees, etc. This is not necessarily a correction, but just a suggestion that when discussing housing costs – or formalizing agreements – to define your intended meaning: rent, or housing costs to include rent and basic utilities. Whatever the Applicant’s intention is for a rental rate, it must be apparent in the deed restriction language from the get-go. This will alleviate confusion later, or give the impression of being misleading. Scott Mueller, Deputy Chief Fire Marshal, Bozeman Fire Department Office (406) 582-2353 Mobile (406) 589-6271; smueller@bozeman.net RESPONSE TO FIRST REVIEW COMMENTS SP1, January 29, 2021. P a g e | 8 I have given the Applicant approval in previous reviews for a diminished width on the West access in the South portion. Down to 16 feet, also having collapsible bollards. Please see C2.2. The landscape plan L2.01 shows 15.68 feet. Extensively, I have spoken with them and feel confident they will have a minimum 16 foot drivable surface on the West access. The East access appears to be consistent with 20 feet width in asphalt. Necking to the 20 feet at planters in between garage entrances. • All comments here have been addressed. Alex Nordquest, Bozeman Forestry Division Manager, (o) 406-582-3225, (c) 406-579-1721, anordquest@bozeman.net There is concern regarding the overhead power lines at this site. For the proposed landscape plan, none of the boulevard trees would be compliant with existing overhead lines. Power-line compliant species are indicated in our Street Tree Guide (attached). • All comments here have been addressed. Tom Stewart, Northwest Energy District Engineer – Bozeman Division; O 406-582-4602, C 406-223-0573 thomas.stewart@northwestern.com; New Construction (1-833-672-9453) Apply Online at www.northwesternenergy.com/construction 24-Hour Service 888-467-2669 121 East Griffin Drive I P.O. Box 490 I Bozeman, MT 59771-0490 20234 Cottonwood & Ida SP- • Utility site plan shows proposed electric plans but does not show gas. Will the new buildings need gas? There is an existing gas main along Cottonwood Street and a portion of Ida Ave. • Proposed gas routing is now shown on Sheet C1.2 • Utility plans show the proposal of relocating the existing three phase overhead lines to underground three phase along the perimeter of the development. If this is the plan this will require a great deal of utility work to accomplish this which will be very expensive and possibly won’t be able to be achieved. The applicant needs to submit an application to NWE and get the NWE engineer involved to look at the possibilities and to provide a rough estimate on the cost to do the relocate. Relocates are an expense the owner will have to pay 100% of construction costs. RESPONSE TO FIRST REVIEW COMMENTS SP1, January 29, 2021. P a g e | 9 • Construction applications have been submitted for both New Services for the on-site improvements as well as the Relocation of the overhead power along the perimeter of the development. Coordination is on-going with Northwestern Energy Engineer, Kroy Graham. • Buildings requiring 3 phase power a transformer pad site should be planned. Typical 3- phase pad is going to be a 7’x7’ pad. For oil filled transformers a 2-foot clearance is required to non-combustible walls and surfaces that do not have any openings such as doors, windows, air intake, and fire escapes routes. For transformers 750kVA & larger a 3-foot 6-inch clearance is required. For any combustible surface a minimum of a 10-foot clearance is required. Minimum Working Space for a Pad-Mounted Transformer is 2- feet on the sides and back portion of the concrete pad and 10-feet of clearance on the front side of the pad where the transformer doors are located. Note, all distances are referenced to the edge of the pad. The NWE engineer will help to determine the appropriate location. • Locations of the electrical facilities have been coordinated and approved through conversations with Northwestern Energy Engineer, Kory Graham. Notes have been provided to instruct the contractor to coordinate with Northwestern Energy, during construction to ensure facilities are placed in appropriate locations as shown on the site plan. Sheet C1.2 • Need to show 10 foot utility easements for all dry utilities. Any extensions into any lots for any additional new gas mains and electric primary underground or overhead extensions will require a minimum of a 10-foot easement to be shown on the plat. i.e. Extensions from poles, junction cans to transformers or loop feed transformers to other electric equipment needing primary. • To avoid clutter on our site plan sheets, Sheet C1.1- Proposed Lot Boundary Alignment has been include in the site plan submittal showing the 10’ easements both public and private, as well as other required easements. We encourage the reviewer to also reference the Subdivision Exemption amended plat application that is associated with this project. • Meter locations will need to be approved by NWE. NWE policy is to maintain a minimum 30-inches wide by 3-feet clear zone between the front of the meter and landscape screening and allow easy access to the meters for operation and maintenance. This can be determined through the design process after an application is submitted through NWE and the area engineer will work through allowable shrubs and plants for screening and to determine adequate clearances for access to our meters. • Meter locations have been coordinated and discussed with Northwestern Energy. Meter locations are shown as a hatch on Sheet C5.0- Utility Plan. It is our understanding that these locations have been approved. • If requesting gas services the following applies to all buildings in regards to the gas regulator. The gas regulator cannot be placed under a window or within 3’ of the operable portion of the window. It can be placed under a window/deck on the second story, provided the “open/operable” portion has at least 6’ of clearance from the regulator. Ensure that there is 10’ of separation from any mechanical air intake, including air conditioning units. The regulator will need to be 3’ from the closest corner of any portion of the electric meter base. The gas regulator is generally located on the RESPONSE TO FIRST REVIEW COMMENTS SP1, January 29, 2021. P a g e | 10 left side of the meters. Submitting an application to NWE will get the NWE engineer involved and can help with this process. • Please refer to the M.E.P. and Architectural sheets. The locations of the meter bases have been coordinated based on Northwestern Energy’s standards described above. • No landscape plans were provided. Only comments is as follows; o No large deep rooted trees or bushes will be allowed within the 10-foot utility easement. • Please refer to the Landscape sheets. This comment has been coordinated with landscape design and no large, deep-rooted trees or bushes will be planted within the 10’ utility easement. • If the applicant has not done so, recommend that the applicant submit a service application to NWE as soon as possible to get the NWE engineer working with the engineers and architects to help correct any issues and provide direction and feedback as the process continues through design. • Submit an application online to have the area engineer work with the applicant. Go to www.northwesternenergy.com/construction to apply online Montana Construction Application, and access Montana New Service Guide to provide information on electric and gas service requirements. • Construction applications have been previously submitted for New Services as well as the off-site relocation of the overhead power along the perimeter of the site. Power and gas layouts have been coordinated and approved through conversations with Northwestern Energy, and further coordination on Northwestern Energy’s design efforts is on-going. RESPONSE TO FIRST REVIEW COMMENTS SP1, January 29, 2021. P a g e | 11 Following is information to applying on line for construction services. You may provide this to your applicants to help them get started. Please feel free to share this information with anyone who is beginning to plan for development of commercial or residential construction. It will be needed and the sooner they get Northwestern Energy involved the better it will proceed. Following is a link to the New Construction application. Press Ctrl key and left mouse click on this link. https://www.northwesternenergy.com/account-services/new-construction/new-construction-form- v2?State=MT If the link does not work, please go to the Northwester Energy web page. www.northwesternenergy.com here you will see at the top left Account Services button. Click on this button and it will take you to the Account Services page. Here you will need to click on the New Construction button. This will take you to the Construction page. Under the Montana heading select Montana Construction Application. ENGINEERING COMMENTS: February 26, 2021 Ms. Susana Montana Mr. Griffin Nielsen, PE City of Bozeman – Planning & Engineering Departments 20 East Olive Street Bozeman, MT 59715 Reference: Tinworks (Cottonwood & Ida) – Narrative & Comment Resolution for… Site Plan Application #20234 Dear Bozeman Planning & Engineering Departments: We have previously worked through comments for the Subdivision Exemption process. The plat is now recorded with supporting documents. We have worked through the Infrastructure Plans and that is currently under review in the Engineering Department. PUDF re-submittal is in the possession of City Planning Staff and is either approved or in its final review. We now provide this comment resolution letter pertaining to Site Plan review comments. The original review comments are included in “screenshots,” below with an explanation of how we resolved those comments, below. SITE PLAN COMMENTS (from Engineering) RESPONSE TO FIRST REVIEW COMMENTS SP1, January 29, 2021. P a g e | 12 Response to #1: Onsite and offsite drainage systems were separated so there is no shared storm drain infrastructure between onsite and offsite. See Sheet OC3.0 of the Infrastructure Plans and Sheet C4.0 of the On-Site Plans. Per our phone call with Griffin on Jan. 6th, 2021, this should resolve the comment. Response to #2: Based on our phone call with Griffin Nielsen on Jan. 6th, 2021, the proposed utilities within Ida Avenue public right-of-way are necessary to maintain connectivity to the alley east of Ida Avenue approximately mid-block. Per direction on that phone call, we have placed the gas utility under the roadway pavement section. Utilities along the north side of the project (along Aspen Street right-of-way) have been moved into the 10-foot private utility easement to the extent possible but may encroach into the City right-of-way only to move around transformers. Based on the intent of the previously-approved Ida Street section through the PUD process (where we showed power/gas under the Ida Street sidewalk), we hope that this minimal encroachment under the sidewalk to go around transformers is acceptable for this project. Response to #3: Coordination with Brian Heaston is on-going and will be resolved prior to site plan approval. We ask that this be made a condition of approval (if it is not approved prior to the Engineering Department’s completion of this final review). Response to #4: It is the intent of this project for the POA to assume maintenance responsibilities of the stormwater facilities built in connection with this project. A legal instrument will be recorded stating the responsibility of the maintenance of these facilities shall be the responsibility of the POA. We recommend that this be made a condition of approval (if it is not completed prior to the Engineering Department’s completion of this final review). RESPONSE TO FIRST REVIEW COMMENTS SP1, January 29, 2021. P a g e | 13 Response to #1: The Planning Department has verbally indicated to the Developer that concurrent construction will be allowed per these conditions and had indicated to the Developer that full resolution of this comment shall occur during Site Plan review/Infrastructure Plans review (as the improvements are more fully shown in the Infrastructure Plans.) Our understanding is this comment is resolved pending Engineering Department approval of the concurrent construction. Response to #2: Noted. The public street lights (located at the southwest corner of the Aspen & Ida intersection and the northwest corner of the Cottonwood & Ida intersection) will be included in an SILD per City of Bozeman standards prior to occupancy of Phase 1. Street light design and photometrics was provided within the last Infrastructure submittal to the Engineering Department. Please do not hesitate to contact me if you have any questions or need any additional information for these submittal materials. Sincerely, Mike Russell, PE, MBA Senior Engineer MTR Enc. Site Plan Comments from Griffin Nielsen, dated 12/9/2020