HomeMy WebLinkAbout2021-03-30_E1-0A - SITE LIGHTING PLAN - AREA AT
E2
E2
E2
E2
E2
E2
PROPERTY LINE
A1- 7
A1- 7
A1- 7
A1- 7
A1- 7
A1- 7
2
E5.2
EX3
A1- 5
E2H
E2H
A1- 7
A1- 7
80FT.80FT.12' - 0"12' - 0"41' - 0"41' - 0"30' - 0"30' - 0"GENERAL ELECTRICAL NOTES:
A. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE WITH EACH
OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS,
DIFFUSERS, BOXES, AND OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL
PLACEMENT OF MATERIALS.
B. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS, WALLS, CEILINGS,
AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED IN THESE DOCUMENTS. THE
CONTRACTOR IS RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF THE
ARCHITECT/ENGINEER.
TRUE NORTH
REVISIONS
NOTES
REVISIONS
NOTES
STAMP + SIGNATURE
KEY PLAN
Building A
Building B
SP1
03/30/2021
Energy 1
2042 Stadium Dr Suite 2
Bozeman, MT 59715
+1 406 587 2917
As indicated SITE LIGHTING PLAN -AREA A E1.0AHAVENPond Row
Lot 3A, Van Horn Subdivision
Bozeman, MT 59715
E1.0A SCALE: 1/16" = 1'-0"
SITE LIGHTING PLAN AREA A1
KEYED NOTES
No. Description Date