Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2021-03-30_ A2-03 - ELEVATIONS - BUILDING B CONT-
Level 2 4844' -7 13/16" Building B -Bottom of Truss 4853' -6 3/4" BB BC BD BE BF W1'W1' W1'W1'W1' BA Ground Level Building B 4833' -3" W1'WD4 RF1RF1 WD5 8' - 11"11' - 4 7/8"20' - 3 3/4"W4' WD4' WD4 WD4' WD4' WD4 WD4 WD4' G2 G2 WD4 WD4' WD4' WD4' WD4' WD4 WD4' WD4' WD4 WD4 WD4'2' - 0"WINDOW R.O.6' - 0 1/2"2' - 0"WINDOW R.O.6' - 0 1/2"5' - 7 3/4"9' - 0"9' - 6"EXHAUST GRILLE EXHAUST GRILLE WD4 WD4 10' - 0"2' - 3"G2 HP 4863' - 10" HP 4861' - 10"8' - 3 1/4"10' - 3 1/4"M1 M1 M1 EXHAUST GRILLE WD4' WD4CCCC CC CC CC CC CC CC CC G2 G2 17' - 4 3/4"WW14 CC CC CCCC CC CC CONDENSER 54dB CONDENSER 58dB Level 2 4844' -7 13/16" Building B -Bottom of Truss 4853' -6 3/4" B1 B2 B5 B7 W1W1 W1 B6 Ground Level Building B 4833' -3" W1W1 W1W1 W1W1W1 W1 B3 B4 B1010B B1001 HP 4861' - 10" HP 4863' - 10" HP 4862' - 1" W4 W1 7' - 0"EX2 EX2 7' - 0"CONDENSER CONDENSER 7' - 0"EX2 8' - 11"11' - 4 3/4"WINDOW R.O.6' - 0 1/2"2' - 0"WINDOW R.O.6' - 0 1/2"2' - 0"8' - 11"EXHAUST GRILLE W1W1 G1 G1T G1T G1 G1 G1 G1 EXHAUST GRILLEEXHAUST GRILLE 8' - 6 1/4"RS1 RF1 RF1 RF1 RF1 RF1 RS1 RS1 WD4'WD4' WD4 WD4 WD4 WD4'WD4' WD4 WD4 WD4WD4 WD4 WD4' WD4'WD4' WD4'WD4' WD4 WD4' WD4 WD5 WD5 WD4 WD4'WD4' WD4 WD4' WD4 WD4 WD4' WD4' WD4 WD4 WD4' WD4 WD4' WD5 WD5 WD4 WD4' WD58' - 3 1/4"10' - 3 1/4"M1 M1 M1 M1 M1 M1 M1 CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC WW15 G1 G1T G1 G1 G1 G1 G1 G1 G1 WW16 17' - 4 3/4"CC CC CC CC CC CC CC CC CC CCCC Level 2 4844' -7 13/16" Building B -Bottom of Truss 4853' -6 3/4" BE BF Ground Level Building B 4833' -3"11' - 4 3/4"8' - 11"W1'20' - 3 3/4"WD4 RF1 WD4' WD4' WD4'2' - 0"WINDOW R.O.6' - 0 1/2"M1 CC CC CC REVISIONS NOTES REVISIONS NOTES STAMP + SIGNATURE KEY PLAN Building A Building B SP1 03/30/2021 3/16" = 1'-0"ELEVATIONS -BUILDING B CONT.A2.03Haven132 Pond Row Lot 3A, Van Horn Subdivision Bozeman, MT 59715 MASS Design Group P.O. Box 212 Bozeman, MT 59771 3/16" = 1'-0"1 BUILDING B - WEST ELEVATION 1 3/16" = 1'-0"2 BUILDING B - SOUTH ELEVATION 1 3/16" = 1'-0"3 SECTION ELEVATION 3 1 3 2 1. CC - C CHANNEL RUNS VERTICALLY FROM SOFFIT TO FLASHING ALONG WINDOW JAMBS. 2. CC - C CHANNEL RUNS HORIZONTALLY BETWEEN LEVELS 3. SEE LANDSCAPE FOR MECH. EQUIP. SCREENING No. Description Date