Loading...
HomeMy WebLinkAbout2021-03-30_ A2-02 - ELEVATIONS - BUILDING BLevel 2 4844' -7 13/16" Building B -Bottom of Truss 4853' -6 3/4" BBBCBDBEBF W1'W1' W1'W1'W1' WD4 WD4 BA Ground Level Building B 4833' -3" ELECTRIC PANELCT CABINET UTILITY METER GAS METER RF1 RF1 WD4' WD4 WD5 B1011 8' - 11"11' - 4 7/8"20' - 3 3/4"WD4 WD4 WD4' WD4 7' - 0"EX2EX2 WD4 WD4' WD4 WD4'WD4'WD4 WD4 WD4'WD4' WD4' WD4'17' - 4 3/4"2' - 0"WINDOW R.O.6' - 0 1/2"2' - 0"WINDOW R.O.6' - 0 1/2"HP 4863' - 10" 4862' - 1"10' - 3 1/4"8' - 6 1/4"WD4 M1 M1 M1 M1 CC CC CC CC CC CC W4' G2 G2 G2 G2T WW10 CC CC CCCC CC CC CC CONDENSER 58dB CONDENSER 54dB Level 2 4844' -7 13/16" Building B -Bottom of Truss 4853' -6 3/4" B1B2B5B7 W1'W1' W1'W1'WD4 B6 Ground Level Building B 4833' -3" WD4' W1'W1'W1' W2 W2 W1'W1' W1'11' - 4 3/4" 8' - 11" W1' B3B4 WD5 WD5 RS1 RS1 RF1 RF1 RF1 RS1 G2T B1004A G2T GUTTER WD4' WD4 RS1 4862' - 1" HP 4863' - 10" 4861' - 10" WD4' WD4 WD4 WD4' M2 WD5 WD4 WD4 WD4'WD4' WD5 WD4 WD4'7' - 0"EX2 EX2 WD4' WD4 WD4 WD4' WD4WD4 WD4 WD4 WD4'WD4' WD4 WD4'WD4'WD4'WD4' G2 WINDOW R.O.4' - 6 1/2"3' - 6"2' - 0"WINDOW R.O.6' - 0 1/2"2' - 0"WINDOW R.O.6' - 0 1/2"8' - 11"7' - 8 1/2"19' - 5 1/4"DRYER VENTS EXHAUST GRILLEEXHAUST GRILLE EXHAUST GRILLE EXHAUST GRILLE W2 EXHAUST GRILLE EXHAUST GRILLE RG1RF1 8' - 11"W4'28' - 10"DOWNSPOUT G2 G2 G2 W4' M1M1M1M1 8' - 3 1/4"10' - 3 1/4"RF1 CC CC CC CC WD4 CC CC CCCC CC CC CC WW11 WW13 G2 G2 G2 G2 G2 17' - 4 3/4"19' - 5 1/4"WW12 G2 CC CC CC CCCC CC CC CCCC CC CONDENSER CONDENSERM1M1M1 Level 2 4844' -7 13/16" Building B -Bottom of Truss 4853' -6 3/4" BBBA Ground Level Building B 4833' -3" B1013 WD4' RF1 8' - 11"11' - 4 3/4"WD4 8' - 0"GRILLE M1 M1 CC Level 2 4844' -7 13/16" Building B -Bottom of Truss 4853' -6 3/4" BB BA Ground Level Building B 4833' -3" W1'W1' W1' RG1 WD4' WD4 7' - 0"EX2 8' - 11"11' - 4 3/4"WD4 WD4 WD4 WD4 WD4' WD4 WD4' WD4'2' - 0"WINDOW R.O.6' - 0 1/2"WINDOW R.O.6' - 0 1/2"2' - 0"RF1 M1 CC CC CC CC CC CC CC Level 2 4844' -7 13/16" Building B -Bottom of Truss 4853' -6 3/4" BB Ground Level Building B 4833' -3" EX2 WD5 WD5 RG1 CC 8' - 11"11' - 4 3/4"7' - 0"DOWNSPOUT RD1 4' - 0"3' - 6"ADA DOOR PUSH PLATE REVISIONS NOTES REVISIONS NOTES STAMP + SIGNATURE KEY PLAN Building A Building B SP1 03/30/2021 3/16" = 1'-0"ELEVATIONS -BUILDING B A2.02Haven132 Pond Row Lot 3A, Van Horn Subdivision Bozeman, MT 59715 MASS Design Group P.O. Box 212 Bozeman, MT 59771 3/16" = 1'-0"1 BUILDING B - EAST ELEVATION 1 5 2 1 33/16" = 1'-0"2 BUILDING B - NORTH ELEVATION 1 3/16" = 1'-0"3 BUILDING B - SECTION ELEVATION 3 3/16" = 1'-0"5 BUILDING B - SECTION ELEVATION 5 4 3/16" = 1'-0"4 BUILDING B - SECTION ELEVATION 4 1. CC - C CHANNEL RUNS VERTICALLY FROM SOFFIT TO FLASHING ALONG WINDOW JAMBS. 2. CC - C CHANNEL RUNS HORIZONTALLY BETWEEN LEVELS 3. SEE LANDSCAPE FOR MECH. EQUIP. SCREENING No. Description Date