HomeMy WebLinkAboutExhibit D - Form of Price Proposal1
EXHIBIT E
FORM OF PRICE PROPOSAL
2
A. The base lump sum bid is:
$ .
B. Related Work (only) included in the base bid above Item “C” quotation:
Electrical: $_____________________________ Electrical Sub-Contractor: ______________________________ Fire / Life Safety: $_____________________________ Fire/ Life Safety Sub-Contractor: ______________________________ Other Trades: $_____________________________ Sub-Contractor ______________________________
C. Proposed Guaranteed Scheduling for Project Implementation:
1. Lead time after contract award and selection item confirmations before start of work: (weeks)
2. PE1 out-of-service time: (weeks) D. Long-term monthly maintenance price for after final completion of modernization project (not included in the Base lump sum): $ (one [1] Hydraulic Passenger Elevator). E. Costs for Performance, Labor and Material Payment Bond specified in Division 01: $ . F. Alternate Price Quotations
Note: The following price quotes are submitted as plus or minus (+ or -) the base price proposals indicated. Duplicated procedures, materials and/or equipment must be adjusted to specify
the variance in cost only. Contractor’s Value Engineering Options:
a. $ .
3
b.
$ .
c. $ .