Loading...
HomeMy WebLinkAboutExhibit D - Form of Price Proposal1 EXHIBIT E FORM OF PRICE PROPOSAL 2 A. The base lump sum bid is: $ . B. Related Work (only) included in the base bid above Item “C” quotation: Electrical: $_____________________________ Electrical Sub-Contractor: ______________________________ Fire / Life Safety: $_____________________________ Fire/ Life Safety Sub-Contractor: ______________________________ Other Trades: $_____________________________ Sub-Contractor ______________________________ C. Proposed Guaranteed Scheduling for Project Implementation: 1. Lead time after contract award and selection item confirmations before start of work: (weeks) 2. PE1 out-of-service time: (weeks) D. Long-term monthly maintenance price for after final completion of modernization project (not included in the Base lump sum): $ (one [1] Hydraulic Passenger Elevator). E. Costs for Performance, Labor and Material Payment Bond specified in Division 01: $ . F. Alternate Price Quotations Note: The following price quotes are submitted as plus or minus (+ or -) the base price proposals indicated. Duplicated procedures, materials and/or equipment must be adjusted to specify the variance in cost only. Contractor’s Value Engineering Options: a. $ . 3 b. $ . c. $ .