HomeMy WebLinkAboutStanding seam roofing_030120211. Underlayment: High Temp Ice & Water
2. Substrate: Plywood substrate material shown
Bridger Steel Inc. | www.BridgerSteel.com | 1-877-STEEL-MT
nail strip
Panel Overlap Detail
32
1
Wall Coverage
Version 3.2, 4/2018* Grade 50
Panel Gauges
Fastener Options
Panel Length
Rib Heights
Roof Slope
11-16”
Roof Coverage 11-16”
Concealed Fastener
3’ to 30’+
1” or 1.5”
Impact Rating UL 2218
Wind Uplift Rating UL 580
Warranty Based on Paint System
For more information 1.877.783.3568
24*, 26
Minimum 3:12 or Greater
Enlarged Fastener Assembly
Panel One Panel Two
11” - 16” Coverage
Striations Recommended
*1” Nail Strip shown
1”
Vented/Non-Vented Ridge Cap Hip Ridge W Valley Transition - Low to HighTransition -High to Low
Open Prow Gable Closed Prow Gable 4” Mini Gable 6” Gable Snowbreak
4” Eave 6” Eave Style D Eave - 2” & 4”4” Mini Top Cap 6” Top Cap
J Trim Double J Trim F & J Trim Head Trim Side Wall
End Wall Outside Corner Inside Corner Door Cap Double Base Drip
Base Drip Broom Base Wainscot Fascia
Additional Trim
Profiles Available
By Request