Loading...
HomeMy WebLinkAboutPhasing Exhibits Set 03-24-2021 BLACKWOOD GROVES SUBDIVISION, PHASE 1 LOCATED IN THE SW 114 OF SEC. 24 AND NW 114 OF SEC. 25, T. 2 S., R. 5 E. OF P.M.M., CITY OF BOZEMAN, GALLATIN COUNTY, MONTANA „ ' I W I ' W W W I W I w I N I W WI W I w - ALDE_R'CREEK DRIVE W (60'R.O.W.) W ss ss ss ss ss 9 ss ss ss ss Mj ss o STORMWATER MAINTENANCE = F_ T_ T_ -T I" F— T _7 -I EASEMENT TO BE GRANTED 0 I IS O I a OVER ENTIRE OPENPSMPCEL EASEM ENT BEBEI GRANTED OVER ENTIRE OPEN SPACE 3 CONNECT TO PARCEL CONNECT TO R EXISTING 8" I Q: I PROPOSED POND WATER MAIN STUB EXISTING 8" Z WATER MAIN STUB PROPOSED POND [ L I R O [S5 0W '00wE] 89-44'57" 0. N 1300.25 09015'00' M) RRIOATION DITCH-NOR 1337. 7 090"15'0 ' M _ I MEDIAN ff I 33'TBC TO TBC �n mb /; 1462'TBC TO TBC/ N qqCC)) OS F 16 ire m` LOT 5 I fSry p pp p E Oa Ow O$ O� Oa O� O$ 07$ O$ OS a O� 6.]005 p^ 1o.mw �5.533 5F �m �N �� �m �m �m �m �m �m �m III o N� J O« pwen� / wy PRO.CULVERT TO CONNECT TO 94'RIGHT OF WAY m e rss e �I S o8 EX.24"CULVERT THAT DRAINS NORTH INTO ALDER CREEK SUBDIVISION 30'WIDE PUBLIC UTILITY --- _ o - 33'TBC TO TBC - .. --- \ 60'RIGHT OF WAY „ ---_ �_ _ - .-_ --=-- - - i,, AND ACCESS EASEMENT / I om I ' 3s'Tec To Tec -0 CAMBRIDQE DRIVE sIDEw 10'WIDE ALK - - - - - - - LOT 6 PROPOSED - r- ,n$ a W F - - - - - ts.o88 5F COINNECT 6.ssa sF a aw STING 1 LL LL 18"SANITARY SEWER MAIN TO BE r mu, m'A 60' RIGHT OF.WAY - n ...EXTENDED DOWN 19TH AVENUE �° o� o� o� oN o� oN o^e' o os _ „ �' .,..'"'t.'^ n� a'A mH mlA nW and o �q // WATER MAIN POND w I � I pp FROM EXISTING SANITARY SEWER < -a Is� S^ of . a o� PROPOSED 4 Q - MANHOLE IN GRAF STREET n . a - ---f__-- vy m ^ -PROPOSED 1" J� SEWER SERVICE(TYP.) om o75 •.moo 08 _�08 0� o� o� __-o� om s�i SF s 55u 5F ROUNDABOUT DOWITH EPH INTERSECTION INSTALLED WITH ---- W WATER SERVICE(TYP.) - - J1O J J'^ - ¢' / * sw 'n N TO BE PHASE 1 \ ; \- 6'WIDE SIDEWALK <W W // Sapp _ ` INFRASTRUCTURE �E 1 .... n'A m H rn b AT PARK FRONTAGE(1YP.)N W + n of m �'" _"�u� - (� LOT 7 \ g < r� FQ F$ Q $ �e LEY 1 ;,20' RIGITF vi OJY � pa ---O� " D oh 'PHASE 1 0$ won 6'PAVEMENT� � 5.00 5F -O, I � �o, 4, L �� WIDTH Q I asap SF „ 35'TBC TO 7BC __"- m m __ STUB 8"WATER MAIN AND 8"SANITARY SEWER q- -w °w _STREET E. m o o 08 _ E � MAIN FOR PHASE 3 CONSTRUCTION )e sF i PHASE 9 — _ sR - � - RIGHT OF WAY- a..� w o- 11 LOT 1 " W / _ . u / TO _ K 12 PAR 13 35'TBC TO TBC l / STORMWATER MAINTENANCE \ .351 SF '---- 1s,1 sF / F 'I EASEMENT TO BE GRANTED 0 8'MEANDERING TRAIL PARK 14 s 0'RIGHT�F WAYS 8'MEANDERING q 11 ' OVER ENTIRE OPEN SPACE ----- STUB PHASE 9 SERVICES " TRAIL „ 1p as,na F � PARCEL WITH PHASE 1 ---E. _ _- - ----- / _"f - LOT 20 �10'WIDE SIDEWALK 1 INFRASTRUCTURE -- (TYP,) - F� / CONSTRUCTION 10'UTILITY EASEMENT > 0.828 „ PROPOSED 8' II O„ 0--��/ I � LO7 19 / PROPOSED A STREET CONNECTION E 19TH WATER MAIN(TYP.) .- J 35'TBC TO TBC hoo /�� AVENUE WILL BE PROVIDED WITH PHASE - CULVERTS' 1 PHASE 2 IS ANTICIPATED TO BE m ---------__ v P z,sae sF CONSTRUCTED CONCURRENTLY WITH -�---- OT ".\ .497 LOT 1 / HAS PHASE 1.IF TIMING ALLOWS,THE .�N LOT 1 LOT 2 LOT 1 LOT 2 SNB� 82.3PARK F 8"WATER MAIN FOR CONNECTION TO AVE9THNUE WILL BE 43,710 SF �3,71g sF N a.497 sF / i 3 CONSTRUCTION LOT 18 SATISFIED BY AVENUE A AND BLACKWOOD ROAD. IF THIS IS NOT I o 60 RIGHT OF WAY COMPLETED IN TIME STREET B WILL BE N PROPOSED 10 - 30'PUBLIC m _ "- E'= ---- PHASE CONSTRUCTED TO CONNECT TO 19TH. r SEWER MAIN(TYP.) \ UTILITY.....----- -_ •..\..\ -�./ (... SEWERSMAIN12" ' EASEMENT. / TUB 8" TER MAIN FOR PRO ED --- S PHASE 9A CONSTRUCTION- WIDE SIDEWALK � / - _� m -"- 3 I �,� ".... e-w aw - w - - - STREET B 60' RIGHT OF WAY �35 rac To TBc_ aw °w / y - - I C. 12 STUB 8"WATER MAIN AND 10"SANITARY '�: __ -,-- \ w \ \•... / p.TSO F / // I� / / / a STUB 8'WATER MAIN AND 12'SANITARY I LOT 12 - STUB 8'WATER MAIN AND 8'SANITARY SEWER SEWER MAIN FOR PHASE 3 CONSTRUCTION SEWER MAIN FOR PHASE 2 CONSTRUCTION MAIN FOR PHASE 2 CONSTRUCTION �- STUBB"WATER MAIN AND 8"SANITARY SEWER m }; MAIN FOR PHASE 2 CONSTRUCTION ttttttttt " 'ss FF _ � PHASE 6LL LOT 1 m N C Scale In Feet 80 0 80 24 0 24 Engineering and Surveying Inc. Scale In Meters 1091 Smnendge Drive•Bozeman.MT 59718 Phone(406)587-1115•Fax(406)5875768 Sheet > of 5 vnvw.cM1engineera.com•info®cM1engineere.com /J190390 BLACKWOOD GROVES SUBDIVISION, PHASE 2 & PHASE 9 LOCATED IN THE SW 114 OF SEC. 24 AND NW 114 OF SEC. 25, T. 2 S., R. 5 E. OF P.M.M., CITY OF BOZEMAN, GALLATIN COUNTY, MONTANA i I I I [S89.45'00"E] L� [69.44.57" — — — _ _ _ — — 1300.25 090'15'00" (M) 1337.07 090115% —.—. — r, s w " 03— — i I wS d mF ^a �w F^ soo4 � M& y o ...I Nw oS o o �� �$ f -- F— � o o _6$ t o ofPHASE 1 N I f e'w � PHASE 9 ^ — - — - - Q LOT 1 3 w w ------2tt,215 5f ---'� a, J, a, a, �✓ K�✓12= W P 1 q- sst sy__ y yz,t .8F w w y y w w w w w w y � R w F c�`� - 136,113 SF " t w , IBC TO TBC h _� m I � I I 182 I � I - m m - LOT 1 LOT 2OT e 4s.7/0 SF 1J.�1a sF - `- N u,ai 4 Lwl2 LOT 1 SOUTH 19TH AVENUE IMPROVEMENTS TO M- ------- - r PHASE 3 LOT 1 BE INSTALLED WITH PHASE 2 m �� INFRASTRUCTURE.DESIGN TO BE FINALIZED DEPARTMcl ENT OF TRANSPORTATION DURING ------ ---�- WITH CITY OF BOZEMAN AND MONTANA PHASE 2 INFRASTRUCTURE DESIGN. - p � 35'TBC TO TBC— —.. ju - - -am— — 80'RIGHT OF WAY— w / i e e ss ew STORMWATER MAINTENANCE CONNECT TO EXISTING 8"WATER MAIN F ---— — EASEMENT TO BE GRANTED STUB INSTALLED IN PHASE 1 — � OVER ENTIRE OPEN SPACE PARCEL 35'TBC TO TBC CONNECT TO EXISTING 8"WATER AND " m CONNECT TO EXISTING 8"WATER AND F^ 8"SANITARY SEWER MAIN STUBS m 8"SANITARY SEWER MAIN STUBS INSTALLED IN PHASE 1 m' ---_ INSTALLED IN PHASE 1 -I-- - I � - PHASE 6 m < INSTALL PHASE 9 SERVICES WITH Z 1W� PHASE 2 INFRASTRUCTURE ~ Lu W 7 >w 10' UTILITY to9�us � W W PROPOSED PONDS W " < EASEMENT(TYP.) I-?� <r. L J INSTALLED WITH PHASE 2 ]o fn — INFRASTRUCTURE H CC LU I�OS G LOT 1 < EASEMENT.E LOOATION TO BE �� <v o _ ( 35'TBC TO TBC J.808 SF tJostz sF FINALIZED WITH FINAL PLAT )�) '" m_- S" 6"SANITARY SERVICE m 60' RIGHT OF WAY _ AND 2"WATER SERVICE EASEMENT TO BE GRANTED STUBS INTO PHASE 6 V W L-— _ OVER ENTIRE OPEN SPACE tq COMMERCIAL LOTS. LOT 189eto (LOCATIO iSF RK s PARCEL ` TO CHAN E)SUBJECT — _ J 0 f " }Lu 60'RIG OF WAY -- / _ _. + — � P _ 22' 40 PHASE 9 = _ — - - - - � IF so, -__PROPOSED POND PHASE2 - 59.2'TBC TO TBC - - \ 7o�iTaolsF 2ANGLED PA0' DRIVE RK NG ON EITHERE WITH 6' CK 6'WIDE SIDEWALK SIDE OS H - W W PARK 10-W --- W W W W t- - PROPOSED 8" " 7//Pl IO.CULVERT W k1•J�F w ." SEWER MAIN(TYP.) 75'RIGHT OF WAY "" "" 7'PLATING STRIP � B SANITARY SEWER DEVELOPMENT �" "49rTO TB wW wBETWEEN BIKE LANE AN FOR oSIDEWALK(TYP.) w EXISTING 16" s - _ 2.5'PLANTING STRIP(TYP.)--- ".� WATER MAIN -......_...�--__.. — + w w W W — --- ---- i MAIN� TBC C W BLAC WOOD ROAD N(451 R.O.W.) - w - _ 90'RIGHT OF 0777; --- BLAC�KWOOD ROAD 90' RIGHT OF WAY nn - m ' �12'MEDIAN �-12'MEDIA1 12' MEDIAN 2'MEDIAN _ ----__ w u — 5'BIKE — — — - - 6'WIDE w LOT 1 8.5 _ LOT 1 SIDEWALK m' 21.967 sF PARKING LANE ,ses " \ s - PARK 9 (TYP.) �" = LANE (TYPO J- ,63J SF w w ✓ 2%—SF ✓ ✓ 1 PHASE 2 AND PHASE 9 STORM SEWER IMPROVEMENTS WILL BE FINALIZED DURING �" �" w �" W w w — INSTALL 8"WATER AND 10"SANITARY _._.µ - m INSTALL 8"WATER AND 8"SANITARY I RESPECTIVE INFRASTRUCTURE DESIGN W W SEWER MAIN STUBS FOR PHASE 4 INSTALL 8"WATER MAIN STUB FOR _ _ SEWER MAIN STUBS FOR PHASE 5 CONSTRUCTION m� -_- 1 CONSTRUCTION m W PHASE 4 CONSTRUCTION NN C 80 Scale Ion Feet 80 w -" j F- $..... � pz�—� oe o o� 24 24 Engineering and Surveying Inc. Scale In Meters 1091 Smnendge Drive•Bozeman.MT 5971 B Phone(406)587-1115•Far(406)5875768 Sheet 2 of 5 www.cM1engineera.com•info®cM1engineere.com /J190390 BLACKWOOD GROVES SUBDIVISION, PHASE 3 LOCATED IN THE SW 114 OF SEC. 24 AND NW 114 OF SEC. 25, T. 2 S., R. 5 E. OF P.M.M., CITY OF BOZEMAN, GALLATIN COUNTY, MONTANA LOT - - - 450,594 \. ' 3 III III � i qq OSq Fqq QQ LOT O� 3 _ � \035 O� Od O�/�On OX p'rym 6,917 SF LOT S e �v 6,884 SF �'�.� O BLOCK8 I `.�' ' / / Low-- LOT 7 \ W ew e e ''3s °" a' e's ss "s e" e'ss m -� `✓ Y LOT 8 0" s,000 si R.O. J BLOC 8 - �LL I� j {,888 SF w Jm Jn Jn Jvi F$ Jvi J J W w Jn / CONNECT TO EXISTING ------ I WATER AND 8 SANITARY w - - SEWER MAIN STUBS LED I PHASE . �J 3 INSTAL N 1 PARK 14� t9.ao 5F 1 3oT/sF J' I PARK 11 m w III w w w � � w W � 20'RIGHT OF WAY -- I zezfi u W CONNECT TO EXISTING 8" I / , � � I ' LOT 19 1, 5 —WATER AND SEWER MAIN 1STUBSANITARY �, �� _16' SPA HF,LT 2.928 9 BLOCK iP CONNECT TO EXISTING 8" =I / _- _ -- ---- --- INSTALLED IN PHASE 1Ilk - l --- ----- WATER MAIN STUB I PARK 3 BLOCK 9 \ m INSTALLED IN PHASE 1 �j LOT 1 '60 RIGHT OF WAY V. �os.�as sF w PHASE 3 CONNECT I I 0 1flIN B F m MA 3s'TBc ro TBc ) I � ,�_ / I LOT 17 59.2'TBC TO TBC / P " `��w\ �✓ / z.92�5F / 37'TBC�TO TBC� -20'DRIVE LANE WITH BACK IN ANGLED PARKING ON EITHER SIDE r W / s i 10'UTILITY (/ �� 5 i ns s EASEMENT(TYP.) w ( { y I- � � w w w W see v / / /�. LOT 4 / / 90' RIGHT OF WAY zR6B - � „ ,z.���;/ ✓/�✓ ✓ / y LOT 13 x\\ / l f / ' I I I I 75'RIGHT OF WAY sF --- — A j I - B i 75'RIGHT OF WAY CK �� N _ - a a LOT 11 INSTALL 8"WATER MAIN _ — -- s/ \ \ z,7ao SF STUB . / 8'PLANTING STRIP ° 10'D/R�IyVpE �. w AISLE, t m PHASE 6 m s, 3989 SF 8.5 LOT ib PARKING LANE 15.5 PLANTING STRIP ) BLOCK 17 P LOT 1 10'WIDE BIK 9 I INSS TALL 8"SANITARY SEWER r - �Q0 1 I �. MAIN THROUGH PHASE 6 PORTION OF PROJECT 197 SF _ 1 J�:gF I I m LOT 1 �� ��. a ✓ / / m e 3 - I � g _ _ _ _ _ _ � w — — — III .WATER w I EXISTING 16" PROPOSED POND 1 m (INSTALL 8"WATER AT RMAINDSNBS / w INSTALL 8"WATER MAIN STUB w i PRO.CULVERT 3 m INSTALL 8"WATER STUB / 7'PLANTING STRIPN r 6'SIDEWALK SEPARATING BIKE LANE .__�- LANE BIKE SIB PACK 1 / �� ✓ INSTALL 8"WATER AND 8" ✓ A w w �./ PROPOSED AND SIDEWALK(TYP) I (TmJ INSTALL 72"WATER AND 12' \.SANITARY SEWER MAIN STUBS \ / I CULVERB PHASE 3 STORM SEWER IMPROVEMENTS -- SANITARY SEWER MAIN STUBS y WILL BE FINALIZED DURING RESPECTIVE - - --- _- _ 8.5 PARKING 10' DRIVE INFRASTRUCTURE DESIGN - — -LANE(TYP.) gISLE(TYp,) - w w „ w 2'MEDIAN 62 2 Scale In Feet en a..° { _ 8.5'PARKING 60 0 60 — — q —49 TBC TO TBC-— — — - �■J —12' MEDIAN- LANE(TYP.) > BLACKWOOD ROAD PHAS 3 5'BIKE LANE(TYP.) 10'DRIVE AISLE(TYP.) = I 18 2' MEDIAN a 12'MEDbVV 18 0 m Engn-,,"g end Surveying Inc. _ t b 12'MEDIAN - - _ Scale In Meters 109151onend,,(.,ve•Bozeman,MT59— '" Phone(40BI 5871115•F.(40BI 5879766 sheet 3 f 5 m",�nhena nears nnm•nm®cnenaneer.3.cem - - rt���Jr'--� ---- x I190390 BLACKWOOD GROVES SUBDIVISION .. PHASE 4 & PHASE 5 LOCATED IN THE SW 114 OF SEC. 24 AND NW 114 OF SEC. 25, T. 2 S., R. 5 E. OF P.M.M., CITY OF BOZEMAN, GALLATIN COUNTY, MONTANA -T -,, BLOCK 16 PHASE 2 LOT 15 70.MO IF �j -7`1f X- ----- PARK 10 41,32Z SF CONNECT TO EXISTING 8" -WATER MAN STUB INSTALLED IN PHASE 2 BLACKWOOD ROAD (45'R.O.W.) BLACKw6oD ROAD --------- �w I NNW I EI 8 CONNECT TO EXISTING 8— — — — — — — — - - -- — — — — — - LOT',I F ).aw IF, WATER MAIN STUB 2,Lo..T IF E 4 CONNECT TO EXISTING 8 INSTALLED IN PHAS 10� WATER AND SANITARY S I PARK IW�K 20 SEWER MAIN STUBS �.O..IF IF BLOCK INSTALLED IN PHASE 2 LEY 4� RIGHT OF WAY ASP ALT -20 --L 16'ASP 2 1 INSTALL PHASE 7 Is'ASPHI -Z IF, WAY A jmm-�-� -e -4-1 COMMERCIAL SANITARY AND WATER MAIN STUBS DURING PHASE 5 7-7 CONSTRUCTION INSTA 8"WATER MAIN STUB 35 TBC TO TBC FOR PHASE 5 DEVELOPMENT:_/ - e C (DURING PHASE 4 CONSTRUCTION) -WATER AND 1."SANITARY' 3L(56K 22 P ASE 4 PORTION OF 35'TBC TO TB SEWER MAIN STUBS PHASE 7 SOUTH 19TH TO BE INSTALLED IN PHASE 2 BLOCK ;?('6'WIDE INSTALLED A R PHASE LOT 1 2 PORTO..TAPER 27.763 IF fH tt- —1— —35'TBC TO TBC 7t L WIDTHS AND TRANSITIONS =I50'RIGHT OF WAY 7 W LL BE COORDINATED 6-WIDE SIDEWALK I 11\ I�-- -- ----.--.--,-.-. ­� �60'RIGHT OF WAY I WITH TY AND MDT IF 60'RIGHT OF WAY C DURING INFRASTRUCTURE REVIEW. STREET C PARK 5' BLOCK 24 54.4�0 IF z PROPOSED POND7 I I I I LOT,1 w .,11 IF BLOCK�19 I I , , - z x z LLI -L. HT IM -------- LOT 2 LOT 4 60 > LOT 1 R'I�,WAY- LOT 6 ��,F WID� 3,M IF — — — — — — — — — — — 1,024 IF 3.671 IF E SIDEWWAL LOT 3 2 0 IF IF 10'UTILITY EASE. to Lu I ENT P.) LOT 12 1 RO OSED 8" LOT 8 PHASE 5 (TY LOT 7 z PEWEPR MAIN(TYP.) I.e.IF I.I.IF Lu IF L-1 `,0.13 IF' L%.1��F S > BLOCK 21 PHASE 4 F--I�OCK 3 41-1 -4 10.172 IF TR ALLEY 5 ZO IGHT*OF WAY- -t -Lu I e ASPI�ALT LOT 6\ LOT 7 -1 LOT a LOT 9 F -1 �--1_020'PUBLIC UTILITY EASEMENT LOT 5 LOT 10 F LOT 1.3 _OT 16 LOT 17 LOT 18 BLOCK 23 5,470 IF 1,1 IF 1,1 IF I IF IF 3.M IF 3,577 IF 3.0 ATER AIN X j (TYP.FOR BLOCK 21) 5,M IF INSTALL 8 W STU.FOR H E INSTALL 8-WATER MAIN S B EVELOPMENT(DURING b, -WATER MAIN STUB III ti (DURING PHASE 5 D CONNECT TO EXISTING 8* FOR PHASE 7 DEVELOPMENT INSTRUCTION) on CONSTRUCTION) PHASE 4 INSTALLED IN PHASE 4 L RT�.LT,,15 LOT 1�3 L T 12 LOT 11 LOT 24 LOT 23 LOT 2Z LOT 21 1-%20 LOT 19 0 �Ro.CULVE �LOT 14 .40 5. IF 3,M IF F 1,117 IF 3-1 IF 3,111 IF 1,114 IF IF IF TBC TO TBC-- RIGHT'O WAY 25M INSTA 8"WATER MAIN [S89-57-02N STUBLL 10"SANITARY SEWER MAIN SIDEWA SOUTH OF STREEr E STUB FOR FUTURE EXTENSION TO BE INSTALLE BY FUTURE AIT1111­S AN.UTILITIES TO BE EXTENDED DEVELOPMENT OF PROPERTY TO PROPERTY LINE WHERE SHOWN TO THE SOUTH. PHASE 4 AND PHASE 5 STORM SEWER IMPROVEMENTS WILL BE FINALIZED DURING RESPECTIVE INFRASTRUCTURE DESIGN Scale In Feet 60 0 60 CNN EEmAr!%mmommi 18 0 18 Engin—Ing and S—eying Inc. Scale In Meters 1091�­d��D­-13.­­VT 19716 =(406)587 1115-F.(406)587�766 h..g,­­­n-inm Sheet 4 of 5 #190390 BLACKWOOD GROVES SUBDIVISION, PHASE 6 ,w PHA SE 71 & PHA SE 8 LOCATED IN THE SW 114 OF SEC. 24 AND NW 114 OF SEC. 25, T. 2 S., R. 5 E. OF P.M.M., CITY OF BOZEMAN, GALLATIN COUNTY, MONTANA 4�,�;7;F �.Z tF _L T 1 , // I ' ' / � ' -- 11 1 1 --3 L T 18 ------- PHASE 2.9W SF 'LOT 17 LOT 16 — — — — — — — — — — — LOT 1 2.924 SF �j 41,715 SF STALLED IN PHASE 3) EXISTING SANITARY SEWER IN P HASE 6(IN -v III PHASE 6 W.O I., F c?NNECT TO EXIST NG �I? 8 WATER M—blud INSTALLED IN PHASE 3 60'RIGHT OF WAY PRO.13R P CULVERT AND MANHOLES TO E RELOCATED WITH -------- IRRIGATION DITCH AROUND COMMERCIAL TOWN CENTER(TYP PARK LOT 1 6"SANITARY SERVICE '1 4 AND 2"WATER SERVICE /I STUBS IN TO COMMERCI L LOTS. (LO DNS SUBJECT TO'CHANGE) > W-1 d C9 —T I S�F T\\ NNECT TO EXISTING 8"WATER m N STUB INSTALLED IN PHASE 3-1. 2 BLACKWOOD ROAD CONNECT TO EXISTING 8"WATER= PHASE 3 STUBS INSTALLED IN PHASE 3 1 F F RIGHT OF W L"11, 60'RIGHT OF WAY IN 16.�SFj LOT I CONNECT TO E �A PROPOSED 1" WATER AN 2"SANITARY WATER SERVICE(TYP.) 35'TBC To TB MISTING 12" SEWER MAIN STUBS INSTALLED PROPOSED POND -1 —'f 4-+- -4-4 IN PHASE 3 opo 8" PR SED AND 12"SANITARYG R /L.T WATER MAIN OW.) CONNECT TO EXISTIN 12"WATE I I EWER MAIN N PHASE 3 1 LOT 3 MBS INSTALLED IS PHASE 8 - - E--- 7 1..—. - - 13,M�SF .4 PHASE 7 15.5'PLANTING STRIP z LOT 9 PR POSED 4" 31'TEIC TO TEIC �o'o"\�81�-KE s ER SERMCE(�Typ.)3� 3: PARK � I- --Lu 60' RIGHT OF WAY I LANE(TYP.) > 75,1r S -C - T',� LOI,3 LOT 1�3 TIB LOT 111 F� PAR 5 37'TBC 70 TB III'WIDE ASPHALT ko., Lo LOT 1 Lj�ll SF 21'RIGHT Z 84.1 SF 54,416 SF T 1 01 WAY 1 0.1 SF 7 < ET -7Z 8 E D- 60' RIGHT OF TOITBCC --�--PHASE 5 ' - Lu F— 35 TBc ix 10'SIDEWALK 8.0'PLANTIN6G 9 LOT b w F - STRI 1 3..4 P 10 � I , I --- T c' RIGHT OF WAY CONNECT TO EXISTING B''WAT AND SAN INSTALLEDTAINRYPHASER MAIN STU E 7 z CONNECT TO EXISTING 8-WATER IL MAIN STUB INSTALLED IN PHASE 5 Co 0 pi INSTALL 8"WATER AND SAN= S ER MAIN STUBS DURING P E TBC TO T 7 CONSTRUCTION Bc I I. RIGHT OF WAY T IET E �RE 2599.67 269-57'02*-W 8OUTH REErS AND UTILITIES TO BE 8"WATER MAIN W] 11-SANITARY SEWER MAN AND 1�"WATER MAIN CS89-57'02 SIDEWALK SOUTH OF STREET EX p CULVERT E TO BE INSTALLED BY \—STTENDED To PROPERTY LINE RO STUBS FOR FUTURE EXTENSIONS STUB FUTURE DEVELOPMENT OF WHERE SHOWN. PHASE 6,PHASE 7,AND PHASE 8 STORM PROPERTY TO THE SOUTH SEWER IMPROVEMENTS WILL BE FINALIZED DURING RESPECTIVE INFRASTRUCTURE DESIGN Scale In Feet 80 0 80 C EEmAr%mmommi 24 0 24 Engineering and Sui-eying Inc. Scale In Meters 1091 D—-B.--VT�971 8 5.87�1�1'1 5.-F.(406)587�7613 Sheet 5 of 5 #1qo3qj