MASTER SITE PLAN (MSP) NARRATIVE
RC#2
BLACKWOOD GROVES
MSP Application – RC#2
March 2021
Page 2 of 25
Table of Contents
NARRATIVE
I. Project Overview
II. Entitlement Period
III. Phasing Timelines
IV. Draft Design Guidelines
V. Deviations
VI. Response to Master Site Plan Checklist Item #4
APPENDICES
Appendix A: Phasing Plan
Appendix B: Block Frontage Plan
Appendix C: Vicinity Map
Appendix D: Proposed Street Cross Sections
Appendix E: Parks Master Plan & CIL Information
Appendix F: Stormwater Design Report
Appendix G: Sanitary Sewer Design Report
Appendix H: Water Design Report
Appendix I: Draft Design Guidelines, Bylaws, & CCRs
Appendix J: Building Envelope Diagram
Appendix K: Land Use Map
Appendix L: Noxious Weed Management
Appendix M: Traffic Impact Study Addendum
Appendix N: Geotechnical Report
Appendix O: Wetland Review Information
Appendix P: MSP Tracking Table
BLACKWOOD GROVES
MSP Application – RC#2
March 2021
Page 3 of 25
PLANS:
CIVIL
Sheet C.1.0 - Existing Site Conditions
Sheet C.2.0 - Zoning Map
Sheet C.3.0 - Existing Surface Water & Wetlands
Sheet C.4.0 - Construction Management Plan
Sheet C.5.0 - Water Utility Plan
Sheet C.6.0 - Sanitary Sewer Utility Plan
Sheet C.7.0 - Lot Layout
Sheet C.8.0 - Street Layout
Phasing Exhibit (Preliminary Plat Exhibits)
Street Exhibit (Preliminary Plat Exhibits)
Utility Exhibit (Preliminary Plat Exhibits)
LANDSCAPE (As submitted with the Preliminary Plat)
L000 - Overall Site Plan
L001 - Notes & Legends
L002 - Notes & Legends
L300 - South 19th Avenue Planting
L301 - South 19th Avenue Planting
L302 - Blackwood Road Median Planting
L303 - Blackwood Road Median Planting
L304 - South 11th Avenue, Park 4, & Open Space A Planting
L305 - Open Space Planting
L306 - Open Space Planting
L307 - Park 1 Boulevard Planting
L308 - Park 1 Boulevard Planting
L309 - Park 2 Boulevard Planting
L310 - Park 3 Boulevard Planting
L311 - Park 6 & 7 Boulevard Planting
L312 - Park 8, 9, & 10 Boulevard Planting
BLACKWOOD GROVES
MSP Application – RC#2
March 2021
Page 4 of 25
L313 - Park 5 & 11 Boulevard Planting
L314 - Park 12 & 13 Boulevard Planting
L315 - Park 14, 15, & 16 Boulevard Planting
L316 - Block 28 Watercourse Planting
L500 - Landscape Details
L501 - Landscape Details
L600 - Overall Irrigation Plan
L601 - Well 1 & 2 Irrigation
L602 - Well 3 West Irrigation
L603 - Well 3 East Irrigation
L604 - Well 4 South Irrigation
L605 - Well 4 West Irrigation
L606 - Well 4 East Irrigation
L607 - Well 5 North/Central Irrigation
L608 - Well 5 South Irrigation
L609 - OS Areas
L700 - Irrigation Details
L701 - Irrigation Detail
LIGHTING
Lighting Plan
BLACKWOOD GROVES
MSP Application – RC#2
March 2021
Page 5 of 25
Artist rendering looking northeast along a linear park corridor (Park 14)
I. Project Overview
Blackwood Groves (“Blackwood Groves”, the “Neighborhood”, or the “Property”) is a
119.45-acre property that is located to the south and west of the current terminus of South
11th Avenue and sits directly south of Alder Creek Subdivision (See Appendix C). Sacajawea
Middle School comprises most of the eastern boundary, whereas South 19th Ave acts as the
Property’s western boundary. Blackwood Groves is envisioned as a walkable, lifestyle-
oriented, mixed-use community, which consists of a diverse set of residents with a range of
income and demographics, that also provides amenities and services to all surrounding
neighborhoods.
Blackwood Groves, approximately 2.5 miles south of Downtown Bozeman, is situated with
panoramic views to the Bridger Range to the north, Gallatin Range to the east, Spanish
Peaks and Madison Range to the south, and Tobacco Root Mountains to the west. The
community is specifically planned to embrace the Property’s proximity, natural features,
and stunning vistas to create a public realm that is seamlessly connected to greater
Bozeman but distinct in its inherent walkability and sense of place.
The neighborhood will coalesce around a dynamic center that is planned to serve as a hub
of community-oriented amenities; amenities such as restaurants, retail and commercial
services, entertainment, and recreational activities. This mixed-use hub of features and
BLACKWOOD GROVES
MSP Application – RC#2
March 2021
Page 6 of 25
services will be surrounded by a variety of housing types and price points, specifically
intended to encourage a diverse and dynamic mix of residents with a range of
demographics and income levels. This is of particular importance, given the proximity of
significant education centers to the property – namely Sacajawea Middle School, Morning
Star Elementary, and Montana State University.
The residential and mixed-use town center neighborhoods within the Property are
envisioned to be interconnected by a series of parks, plazas, natural open spaces and
biking/hiking trails that celebrate the connection to the outdoors and encourage vehicles to
be used as a last resort – instead of the first (or more often, the only) option. This series of
multi-modal connections throughout the Property, along with well-planned and activated
streetscapes, are intended to encourage a social atmosphere within the community.
In June 2020, the Property was annexed into the City of Bozeman and underwent a Growth
Policy Amendment and Zone Map Amendment Review. Following those approvals, the
property is now classified as Residential Emphasis Mixed Use zoning and future land use.
This proposal shows conformance with the UDC standards for development within this zone
or clarifies when such necessary information is to be provided (see below for additional
Land Use Analysis). A Preliminary Plat RC was filed March 24, 2021, and that application is
currently under review (File No. 20-447).
If possible, the applicant requests that any unresolved minor code corrections or other
development concerns be addressed through conditional approval of this MSP. This
option would allow for concurrent review and approval of this submittal with the
Preliminary Plat. It is the applicant’s expectation that any necessary conditions can be
resolved prior to a future approval horizon, such as the approval and City sign off on the
Final Plat.
Land Use Analysis
The Blackwood Groves neighborhood is to be developed under the UDC required standards
for the Residential Emphasis Mixed Use (REMU) zoning district. The site is larger than the
five (5) acres minimum and is located adjacent to existing residential neighborhoods, which
will help sustain Blackwood Groves proposed commercial uses. The property is designated
Residential Mixed Use on the current Future Land Use Map, and the attributes of that
designation further encourage neighborhoods sustainability and community
interconnectivity.
BLACKWOOD GROVES
MSP Application – RC#2
March 2021
Page 7 of 25
REMU zoning confers an expectation on future site development that the area will be
mixed-use in character and provide options for a variety of housing, employment, retail,
and neighborhood services. The neighborhood design of Blackwood Groves embodies this
expectation. From the variety of housing options proposed to the Town Center area
envisioned in the heart of the community providing employment and retail opportunities,
this neighborhood strives to exceed the REMU intent expectations established in the UDC
(Appendix K).
While the walkable and compact neighborhood will emphasize residential as the primary
use, the inclusion of community scale retail and services supports the overall neighborhood
design and experience. A diverse array of community scale commercial uses is envisioned
for the Town Center area of the site, including retail, restaurants, offices, maker spaces,
grocery, small-format cinemas, and fitness (not to exceed 30% of the total gross building
square footage allowed within the REMU zoning standards). Residential uses will also be
integrated into the upper floors of the Town Center.
At this time, it is difficult to project the exact non-residential building square footage, but a
preliminary land use analysis is included as Table 1. The Project Team understands the
requirements of the Residential Emphasis Mixed Use (REMU) zoning district and all
applicable UDC standards will apply for all individual phases. Whereas a Site Plan
application has not been submitted concurrently with this Master Site Plan submittal, the
applicant intends to ensure future development is proposed consistent with UDC REMU
required limits on non-residential land uses and REMU special standards during future Site
Plan applications. A proposed REMU Tracking Table, one that will be submitted with the
initial phase of development and amended with each future phase, has been included as
Appendix P.
The community has been designed to be complimented by vibrant, urban, and pedestrian-
oriented complete streets. The street sections (Appendix D) proposed provide for safe and
broad connections across and through the neighborhood, while the linkages enhance
neighborhood's sense of place and park experiences (Appendix E). The proposed off- and
on-streets connections encourage pedestrian and bicycle travel, transit, on-street parking,
and include the required physical elements of complete streets. Natural spaces have been
incorporated throughout the development to serve the community needs for both
neighborhood residents and visitors alike.
BLACKWOOD GROVES
MSP Application – RC#2
March 2021
Page 8 of 25
The streets of Blackwood Groves incorporate natural drainage technologies. On-street
parking is planned throughout the site, with back-in angled parking proposed adjacent to
the Town Center area. Shared access drives and alleys are proposed throughout the
development to create a more vibrant public realm as well as reduce the need for
additional curb cuts. Buildings are to be oriented to the streets and public spaces as is
allowed in the BMC, and the proposed building envelopes have also been analyzed for BMC
compliance (Appendix J).
The neighborhood seamlessly integrates complete streets to accommodate pedestrians,
bicycles, buses, automobiles and wintertime snow storage, and work in concert with
internal property accesses and adjacent development to create a connected and vibrant
public realm. These streets are designed to be community-oriented and pedestrian-friendly
multimodal transportation routes. The neighborhood also includes significant numbers of
public space that are intended to facilitate distinct types of activities and encourage
consistent human presence and activity. The proposed public parks and recreational areas
are inviting to everyone and are designed to reflect the broad character imagined in the
REMU zoning district.
Design standards that emphasize the sense of place and stipulate maintenance of the
neighborhood facilities have been created and these have been included in this submittal
(Appendix I). The community design intended for this community encourages thoughtful
development while providing for providing flexibility for future phases of the development
to respond to changing market conditions. The design standards and guidelines proposed
for Blackwood Groves also include provisions that promote sustainable development.
Initial land use assumptions for Blackwood Groves have been outlined in Table 1 (below)
and Appendix K. For additional details on the precise parkland assumptions for Blackwood
Groves, including discussion of CILP, please reference Page 11 of the Parks Master Plan
(Appendix E). Condominiums are to be developed within the Blackwood Groves subdivision,
and the location and design of these condo units will be proposed for review under further
Site Plan and Condominium review applications as that development plan is assembled. No
Planned Unit Developments are anticipated at this time, and no manufactured homes, or
RV parks are to be developed within this neighborhood.
BLACKWOOD GROVES
MSP Application – RC#2
March 2021
Page 9 of 25
Artist rendering looking southeast at the intersection of Cambridge Drive and Spring Ridge Drive
Community Design Themes
The vision for the Blackwood Groves master plan is a self-sustaining, mixed-use community
with a focus on active living and a connection to the fabric of the greater Bozeman public
realm. This new neighborhood will respond to and embrace the site’s natural features and
vistas to create a unique sense of place. Central to this concept is the creation of a walkable
town center with various amenities and employment opportunities that are all connected
to a network of parks, plazas, and open spaces.
Table 1: Blackwood Groves Land Use Table
Use Proposed Land Area (square feet)
Single Household 30.02 Acres (1,307,845 sf)
Multi-Household* 17.35 Acres (755,777 sf)
Commercial (Mixed Use)* 16.82 Acres (732,621 sf)
Parkland 18.34 Acres (798,747 sf)
Open Space 3.43 Acres (149,459 sf)
ROW/Easements/Streets 33.49 Acres (1,458,878 sf)
TOTAL 119.45 Acres (5,203,782 sf)
* = Type of structures and number of units to be determined at Site Plan.
BLACKWOOD GROVES
MSP Application – RC#2
March 2021
Page 10 of 25
A snapshot of the proposed green plan is included as Figure 1 (see also Appendix E), and
this diagram best illustrates the location and quality of space that has been designed for the
Blackwood Groves neighborhood. The site plan seeks to preserve the natural quality of
Alder Creek and the existing wetlands on site. The character of the existing Alder Creek Trail
will be extended into the new trail system. This new network will involve a combination of
shared use paths and bike lanes that are comfortable, safe, and walkable to all on-site
amenities and will provide connections to off-site trail networks and open spaces.
The draft Design Guidelines for the project are included as Appendix I.
Sustainability: Public Health, Safety and Welfare
Walkability and Connectivity. Walkability in this area of the City has been largely non-
existent. The Property will prioritize connectivity between its residents and amenities, as
well as to the surrounding neighborhoods – and importantly, to the neighboring schools.
This will allow an area that has been somewhat isolated with regards to services but well
connected with regards to potential street connections – with its proximity to a principal
arterial with 19th Avenue and collector streets with 11th Avenue and Blackwood Road
running through the property – to become conveniently accessible to amenities like
restaurants, fitness, parks and trails, and grocery stores.
The community will emphasize walking and biking. Blackwood Groves is planned to provide
proven pedestrian safety measures that allow residents and guests that are walking to avoid
conflicts with motor vehicles as much as possible (internal trail systems, raised / textured
pedestrian crosswalks, etc.). This is especially critical on those corridors approaching the
schools. While motor vehicles will have easy access to the entire Property, the preferred
form of transportation within the Property will be walking or biking.
Additionally, the master plan establishes a multi-modal hierarchy of transportation options
that emphasizes walking and biking, which is intended to further reduce motor vehicle
usage and congestion throughout the Property. A proposed integrated trail network,
connecting and further extending the Gallagator Trail itself, will connect to the existing trail
system along Alder Creek and link with trails that link this development to Main Street.
Preserve & Integrate Natural Amenities. This community will have an important focus on
its environment, open spaces, waterways, trails, and view corridors. The proposed master
plan purposely shifts roads in response to natural features (rather than solely relying on a
BLACKWOOD GROVES
MSP Application – RC#2
March 2021
Page 11 of 25
grid at any cost to natural features) to take advantage of specific view corridors and to limit
the impact on existing wetlands and waterways. Sustainability has played a large part in the
planning as well, with a system of trails and natural open spaces that are connected for
pedestrians and bikers. Not only does this preserve natural elements but it will also
encourage residents and the public to enjoy the outdoor areas. Preservation of existing
wetlands is especially paramount to this project, and it is the intention of the project team
to protect and enhance this important onsite community feature. Community gardens and
farms are also to be incorporated throughout the project to promote sustainability and
farm to table principles.
Regarding mountain vistas, the most notable views to the Bridger and Gallatin Ranges as
well as Spanish Peaks will be reinforced through project design to highlight their importance
as an ever-present backdrop to Bozeman. These elements preserve not just the character of
the district, but the distinct character of Bozeman itself. The 2020 Community Plan notes
that the physical landscape provides residents with variety, which the Property seeks to
preserve while enhancing the housing and commercial options and combining the
important open spaces and recreational activities just minutes from more dense urban
centers.
The REMU zoning district seeks to “preserve and integrate the natural amenities into the
development.” Two significant features of the site play a key role in the approach to site
development: the designated drainage corridors and the vistas to the surrounding mountain
ranges. Alder Creek and the Figgins watercourse along the eastern edge of the site are
significant natural assets to the Property and surrounding community. Blackwood Groves
master plan allows it to preserve the natural quality of these wetlands as a key feature of
the Property while also extending the continuity and design character of the Alder Creek
Trail and string of associated open spaces connecting to Downtown Bozeman.
Neighborhood Focal Point. The size of the Property and scope of the proposed offerings
and amenities allow for the creation of a diverse and dynamic master planned community
that services not just residents within the development but also the greater area and
neighboring communities that are underserved by commercial services and recreational
activities. Blackwood Groves aims to introduce amenities, commercial services and
recreational activities to an area that has been largely overlooked, while providing diverse
employment and housing opportunities as well.
BLACKWOOD GROVES
MSP Application – RC#2
March 2021
Page 12 of 25
Figure 1: Project Green Plan
PROJECT HISTORY
The project team submitted an Informal application on March 3, 2020, receiving comments
from the City Planning and Engineering Divisions approximately one month later. While the
comments were largely focused on a possible subdivision application, the project team is
aware of the application requirements stipulated in these comments, which speak to the
necessity of a Traffic Impact Study and on the existence of the Meadow Creek Subdivision
payback district. Future applications will further address these components, and the
additional items discussed in the Informal comments.
The City Commission adopted a Growth Policy Amendment on June 8, 2020 (Resolution
5176) of Residential-Emphasis Mixed-Use for the Property. Further, the City Commission
adopted an initial zoning designation of Residential-Emphasis Mixed-Use (REMU) and
approved the annexation of the Property on June 15, 2020 (Resolution 5177). A Preliminary
Plat was submitted for the project in early January 2021, with an RC filed March 24, 2021,
and that application is currently under review (File No. 20-447).
BLACKWOOD GROVES
MSP Application – RC#2
March 2021
Page 13 of 25
II. Entitlement Period
The project is to be constructed over a period of three (3) to five (5) years. Extensions to the
Master Site Plan may be sought, as necessary.
III. Project Phasing
The proposed Phasing Plan (Appendix A) for Blackwood Groves is based on current and
future infrastructure requirements and the constructability of each phase. The applicant
understands there is a requirement for parkland and open space, neighborhood centers,
and affordable housing with each phase, and these requirements will be confirmed during
future Site Plan reviews. Parkland phasing is described in Appendix E. Financial guarantees
will be provided as necessary to ensure the development is constructed according the
proposed Phasing Plan.
The projected entitlement period for this Master Site Plan is five (5) years; however, based
on the size and scale of this project, extensions may be requested. The applicant intends to
follow the Phasing Plan included herein, however, should the phasing need to follow a
different order, the applicant is willing to provide contingencies described in modifications
or extensions requested for the MSP. Should modification of the proposed phasing become
necessary, the applicant will ensure any modified phasing sequencing will line up with City
standards and requirements and make sure that all road and infrastructure networks are
properly connected.
Relevant utility and transportation phasing information, including details on proposed
project sewer allocation, have been included in this submittal as Appendices F, G, H, M, and
within the enclosed Civil Plans.
IV. Draft Design Guidelines
The Design Guidelines, as submitted with the Preliminary Plat application, have been
included herein as Appendix I.
The infrastructure design reports have been included as Appendices F, G, and H.
V. Deviations
At this time, no deviations are requested.
BLACKWOOD GROVES
MSP Application – RC#2
March 2021
Page 14 of 25
VI. Response to Master Site Plan Checklist Item #4
Following approval of a master site plan, the applicant intends to shall sequential individual
site plans for specific areas within the Master Site Plan. Each subsequent application for a
site plan shall be consistent with the approved master site plan and subject to the review
criteria of Section 38.230.100.A BMC.
BLACKWOOD GROVES
MSP Application – RC#2
March 2021
Page 15 of 25
RESPONSE TO CITY COMMENTS
Replying to the DRC provided by City Staff on February 2021, the following responses are included in this
RC submittal. The Table of Contents also provides additional direction to relevant response materials.
No. Comment Review Entity Response/Comments
1 The applicant is advised that unmet code provisions,
or code provisions that are not specifically listed as
conditions of approval, does not, in any way, create
a waiver or other relaxation of the lawful
requirements of the Bozeman Municipal Code or
state law.
Planning Understood.
2 BMC 38.310.060.A.4. With every subsequent site
plan submittal, include the MSP Tracking Table that
was provided with this application filled out
accordingly for purposes of calculating the
percentage of a use.
Planning Understood.
1 BMC 38.510.030.C. Landscape block frontage
standards applies to residential based streets. The
following street frontages should have landscape
block frontage since they are considered residential
based streets:
a. Lots 10-21 along 11th
b. Lots 3-9 along Cambridge
c. Lot 1 and 11 along S 15th
d. Lot 10 and 20 along Spring Ridge Drive
e. Lot 1-7 along Blackwood Road
Planning The Block Frontage Exhibit has
been updated, please see
Appendix B.
2 Further clarification is needed on the classification of
waterways. Provide a determination from the
conservation district and correspondence from ditch
companies. It is unclear what waterway is a
waterway and what is a ditch. Ditches do not require
a watercourse buffer.
Planning The applicant has coordinated
with the City Engineering
Department to determine
watercourse setbacks. Please
refer to Appendix O
Watercourse Summary Memo
for a summary of the
waterways that are subject to
watercourse setbacks.
3 If it is determined that the waterway along lots 1-6 in
block 28 is an actual waterway and not a ditch,
information is required on how the watercourse
setback will be mitigated for. A landscape plan will
be required for these lots and a restriction will also
be required that the landscaping cannot be mowed
or altered. The building envelope diagram appears to
show that the lot is buildable into the watercourse
setback which is not allowed per 38.410.100. There
should be some sort of delineation of the wetland
boundary on the lot (i.e. fence). The developer will
be required to install the landscaping and barrier.
Planning See Preliminary Plat
Boulevard & Open Space
Landscape Drawings: Sheet
L316 for required watercourse
setback landscaping and
restrictions.
BLACKWOOD GROVES
MSP Application – RC#2
March 2021
Page 16 of 25
This is also a comment in the preliminary plat
application but needs to be addressed with both
applications.
4 BMC 38.410.040 – Provide design sections and
easement widths for mid-block pedestrian crossings.
These crossings require 1 tree for every 50 feet per
39.550.050.D.
Planning See Preliminary Plat
Boulevard & Open Space
Landscape Drawings: Sheets
L306, L310, L313, & L315 for
satisfaction of required
planting at mid-block
pedestrian crossings.
5 Design Manual comments:
a. We discourage requiring the yards that face the
street to be sod to help meet the intent of the
Climate Action Plan to promote using drought
tolerant landscaping. This also would grant some
flexibility to home owners.
b. We also recommend minimizing turf in parks.
c. Promote additional WaterSmart landscaping and
water reuse systems.
Planning a. Understood, the draft
Design Regulations have been
updated to meet this
expectation, see Appendix I.
b. A reduction of sod is being
considered throughout all
park designs. Due to the
nature of the linear parks and
their usage and frontage, sod
has been selected for ease of
maintenance and aesthetic. At
Parks 1, 2, 3, & 4, the majority
will be planted with native
seed, with a few carefully
placed mulched planting beds
and lawn areas. The
percentage allocated within
the Phase 1 parks is
approximately 36% sod and
48% native seed.
c. WaterSmart landscaping is
encouraged and included in
the draft Design Regulations.
6 The following should be changed with the land use
map:
a. Yellow should state “residential” instead of single
family detached. Since multiple types of housing is
allowed in REMU, these lost should also be able to
allow single family attached.
b. Remove condominium from the blue identifier.
Condominium is a form of ownership, not use. The
blue does not identify small lots on the map. Blue
should be labeled small scale residential. Any lot that
is less than 3000 square feet should also be labeled
blue to match BMC 38.320.040.
Planning The Land Use Map has been
updated, please see Appendix
K.
BLACKWOOD GROVES
MSP Application – RC#2
March 2021
Page 17 of 25
Staff recommends approval of the Blackwood Groves
Park Master Plan with code corrections and
conditions of approval. Staff recommends approval
of the watercourse setbacks and stormwater
facilities within the design of the larger park area as
this land will provide valuable trail connections,
unobstructed frontage for the parks, and attractive
trail and park side features; however, the land
cannot be counted toward the required parkland
amount. The stormwater facilities shall remain the
long-term maintenance responsibility of the
Property Owners Association. Inclusion of the above
is not considered a “waiver” and the equivalent area
of land shall be provided as either land or CILP as
recommended by the Recreation and Parks Advisory
Board and finally approved by the City Commission.
Parks Understood. The applicant is
no longer requesting inclusion
of stormwater facilities as
dedicated parkland.
1 The level of detail provided within the Master Plan
Park Landscape drawings has not been
reviewed/approved. Please note that the designs are
preliminary on each drawing with a watermark or
other clearly visible indication that further review is
required at preliminary plat.
Parks – Code
Corrections
Understood. Plans have been
updated accordingly.
2 With the passing of the Parks and Trails District, park
maintenance responsibility will fall to the Parks
Division upon acceptance of parkland dedication
(easement or deed) or park staff acceptance of
improvements, whichever comes later.
Parks – Code
Corrections
Understood.
3 To mitigate for the unconsolidated parkland
configuration, fewer improvements-in-lieu should be
provided above what is required and/or smaller
parks should be changed to open space parcels to
lessen long-term maintenance responsibilities of the
Parks and Recreation Department. Adjust the
proposal/summary of IILP within Master Park Plan
and consider the following adjustments within
individual park plans, to be confirmed at the time of
preliminary plat review:
a. Trail crossings within street section should
be enhanced as part of the Improvements-in-lieu
proposal. Raised trail surface or pavement markings
must be approved by engineering.
b. Add more trees as part of the
Improvements-in-lieu proposal.
c. Move certain proposed improvements into
private open space lots.
d. Increase number of bike racks.
e. Count expenses related to the ADA on-
street parking spaces toward IILP.
Parks – Code
Corrections
See Parks Master Plan RC #1:
Appendix C for an updated
Improvements in Lieu
estimate.
BLACKWOOD GROVES
MSP Application – RC#2
March 2021
Page 18 of 25
f. Add small parking lot or back-in angled
parking areas to larger parks. Anywhere that angled
parking adjoins parkland, an additional 2 feet is
required to sidewalk/trail width to account for
vehicle overhangs.
1 The Master Park Plan Conditions of Approval shall be
added as an addendum to the Park Master Plan.
Parks – Parks
Master Plan
Conditions of
Approval
Understood. See Parks Master
Plan RC #1 document Section
5: City of Bozeman Conditions
of Approval.
2 Upon phased development of the Blackwood Groves
Park Master Plan, the applicant shall submit to the
department, sequential individual site plan for
specific areas within the master site plan. Each
subsequent application for a site plan shall be
consistent with the approved master site plan and
subject to the review criteria of Unified Development
Code (including but not limited to 38.230.100.A,
38.220.060.A.16, 38.420, 38.410.100) PROST Plan,
Park-naming policy, CILP Criteria/IILP proposal and
other relevant requirements.
Parks – Parks
Master Plan
Conditions of
Approval
Understood.
3 Section 38.420.070.A.2. Blackwood Groves Park
Master Plan conceptually approves inclusion of the
stormwater features shown. Further review and
conditions will be determined prior to preliminary
plat approval. Stormwater areas to be removed from
the required land calculation and shall be maintained
by the POA.
Parks – Parks
Master Plan
Conditions of
Approval
Understood, these
stormwater facilities have
been removed from the
required parkland calculation.
4 Although an easement or parkland dedication is
required at the time of initial subdivision, the Parks
and Recreation Department does not assume
maintenance responsibility until improvements
within each phase have been installed and fully
accepted on behalf of the City, or at Final Plat
whichever comes later.
Parks – Parks
Master Plan
Conditions of
Approval
Understood. See Parks Master
Plan Section 1: Maintenance
for the inclusion of this
agreement.
5 Trail Classifications per 38.420.110. shall be
determined at the time of individual park plan
review. Trails in parkland and open space parcels
shall be of a consistent specification.
Parks – Parks
Master Plan
Conditions of
Approval
All trail classifications in
parkland and open space
areas have been identified in
the Parks Master Plan.
6 The City of Bozeman is developing a city-wide
wayfinding program. Wayfinding improvements
shall not be installed as improvements-in-lieu until
completion of a city-wide wayfinding plan or must be
reviewed for compliance with the City’s existing
parks sign specifications.
Parks – Parks
Master Plan
Conditions of
Approval
Understood. All wayfinding
improvements have been
removed from Phase 1 in
order to give the City time to
complete its city-wide
wayfinding plan.
Improvements for Phase 1
wayfinding will be installed
within Phase 2.
7 All trails or pathways within parks that serve as
egress for buildings must be maintained by the POA.
Parks – Parks
Master Plan
Understood.
BLACKWOOD GROVES
MSP Application – RC#2
March 2021
Page 19 of 25
Conditions of
Approval
8 Placeholder: Additional conditions as required by the
Recreation and Parks Advisory Board Subdivision
Review Committee or City Commission.
Parks – Parks
Master Plan
Conditions of
Approval
Understood.
1 Bozeman Municipal Code (BMC) 38.230.100.A.12: As
presented, the phasing plan is difficult to follow
given the complexity and scale of the development.
Please provide a detailed phasing plan accompanied
with exhibits that show how the development
intends to build out. In addition, the phasing plan
should clearly show sanitary sewer, water, storm,
street, buildings, trails, and other critical
infrastructure that is needed to support the specific
phases of the development.
Engineering -
General
A detailed phasing plan is
included in Appendix A and in
the Phasing Exhibits Set
provided in the civil
plans/exhibits. The Phasing
Exhibits Set includes color-
coded plan sheets for each
individual phase.
1 BMC 38.410.060: Provide a standalone existing
survey, which clearly identifies all easements, right-
of-way, property lines, etc. In addition, provide a
separate exhibit clearly identifying all proposed
easements that would be provided with the master
site plan (i.e. utility, public access, public street and
utility, etc).
a. The subdivision exhibits provides some of
this information but is difficult to follow with the
excessive line work.
Engineering -
Legal
Please see C1.0 Existing Site
Conditions in the civil
plans/exhibits folder for the
standalone existing survey
which clearly identifies all
easements/right-of-way/
property lines. The master site
plan will not dedicate any
easements or rights-of-way –
all easements/rights-of-way
will be dedicated with the
subdivision process as the
final plats are filed.
2 BMC 38.410.060: All public easements must be
provided with the master site plan submittal in a
clean draft format for review prior to master site
plan approval. Easements will be deemed
inadequate if they are not in a final draft format
(signatures are not required for the draft review).
Easements must be stamped by a licensed
professional surveyor. Please provide a complete
easy to follow easement package for review. This
includes all existing and proposed easements, this
complete package is helpful for tracking purposes.
In preparing signature blocks on any upcoming
documents, please make the following changes:
Jeff Mihelich, City Manager Mike Maas, City Clerk
If a new member is established, the easement
documents must be updated.
Engineering -
Legal
The master site plan will not
dedicate any easements or
rights-of-way – all
easements/rights-of-way will
be dedicated with the
subdivision process as the
final plats are filed (please see
the certificate of dedication
language on sheet 1 of the
preliminary plat). Public street
and utility easements were
filed for Blackwood Road,
South 19th Avenue and South
11th Avenue during the
annexation process. These
easements are shown on C1.0
with the corresponding filed
document numbers.
BLACKWOOD GROVES
MSP Application – RC#2
March 2021
Page 20 of 25
3 BMC 38.410.080.E: A pubic drainage easement(s)
must be provided for the stormwater facilitates
supporting drainage from public roadways. The
property owner(s) are responsible for the
maintenance of these facilities.
a. The proposed pond #2, #3, #4, #5, #7 do not
meet this requirement.
Engineering -
Legal
All stormwater facilities are
located within Open Space
parcels with drainage and
maintenance easements as
shown on the preliminary plat
or within Park parcels which
will be owned by the City of
Bozeman. Ponds #2, 3, 4, 5,
and 7 are all within Park
parcels which will be owned
by the City of Bozeman.
4 BMC 38.400.110 Transportation Pathways – A 25
feet wide public access easement is required for all
class I trails. A smaller easement section could be
acceptable if approved by the City’s Parks
department in writing.
Engineering -
Legal
There are no class I trails
outside of the right-of-way of
Blackwood Road and 11th
Avenue.
5 BMC 38.410.060 Easements - A minimum easement
width of ten feet is required on each side of irrigation
canals and ditches. All portions of the irrigation canal
and proposed culverts must be contained within a
minimum 20 feet wide ditch maintenance easement.
Engineering -
Legal
Per an email from the Karl
Johnson (City Engineer) on
3/15/2021, a 10’ wide ditch
maintenance (as shown on the
plat) easement is acceptable
so long as an appropriate
written maintenance
agreement with the ditch
company is secured. The
formal maintenance
agreement will be executed
and filed with the Phase 1 final
plat. A preliminary agreement
letter from the Middle Creek
Ditch Company is provided in
Appendix X of the preliminary
plat application.
1 BMC 38.210.060.A.12: A traffic impact study (TIS) will
be required for the proposed development which
will need to discuss how much daily traffic will be
generated on existing local and neighborhood
streets, roads, and alleys when the subdivision is fully
developed.
a. The TIS does not discuss existing or future
traffic impacts associated with the interaction of
Goldenstein Lane and South 3rd Avenue. This
intersection must be analyzed with an updated TIS.
b. The provided TIS only analyzes Phase 1 and
full buildout traffic impacts. However, the applicant
is showing various infrastructure upgrades (i.e. South
19th Widening, the extension of South 11th, etc.)
with the various proposed phases of the
development. The TIS must clearly discuss the
impacts of the different phases with respect to the
timing of these improvements.
Engineering -
TIS
An addendum to the traffic
impact study is included in
Appendix M of this application
which includes an analysis of
the intersection of
Goldenstein Lane and South
3rd Avenue as well as
additional analysis of the
individual phases of the
subdivision.
BLACKWOOD GROVES
MSP Application – RC#2
March 2021
Page 21 of 25
1 BMC 38.410.070. and 38.230.100.A.12: Each phase
of development must connect to the water
distribution system at a minimum of two points to
allow a redundant feed (per City of Bozeman
Engineering DSSP Section V.A. 5).
Engineering –
Water &
Wastewater
Each phase of the
development connects to the
water distribution system at a
minimum of two points.
2 BMC 38.410.070 (A) (1) Municipal water, sanitary
sewer and storm sewer systems: 2015 Wastewater
Facility Plan – The following improvements are
required.
a. (Name: Cattail Creek Basin – S 3rd Ave
(Goldenstein Ln to S 19th St) requires the extension
of 12 inch sanitary sewer main through the project
site.
b. (Name: Cattail Creek Basin – S 19th Ave
(Driftwood Dr to Goldenstein Ln) requires the
extension of 12 inch sanitary sewer main adjacent to
the project site.
c. It appears the applicant is combining these
improvements into a single 18” sanitary sewer main
running south to north along Avenue A. The city is
receptive to this alternative. The applicant must
provide a narrative and an analysis of the future
conditions on this main prior to acceptance of this
alternative.
Engineering –
Water &
Wastewater
The applicant discussed the
sanitary sewer alternatives
with the City of Bozeman and
came to an agreement on the
sewer layout. An additional 8”
sewer main stub has been
added along Blackwood to
South 19th to provide for a
potential connection from the
northeast corner of the
adjacent property (southwest
of Blackwood/19th
intersection).
3 DSSP V.B.12 Access Roads - A 12'-wide all-weather
gravel access road, with turnarounds if needed, shall
be constructed to provide access to all sanitary
sewer manholes not located within a paved public or
private street or parking lot.
a. It appears the termination of the 18 inch
sewer main will be located outside of the 19th
Avenue pavement. The sewer extension must be
relocated to be within 19th Ave pavement and
greater than 2 feet from the curb and gutter.
Engineering –
Water &
Wastewater
The termination of the 18”
sewer main will be located
within the 19th Avenue
pavement.
4 DSSP V.A.5 Main Extensions – All main extensions
must be looped.
a. It appears water mains will extend into
blocks 10, 11, 19, and 21 without looping. This
configuration proves a single point of failure for
multiple lots. This system must be designed to allow
looping.
Engineering –
Water &
Wastewater
All main extensions will be
looped in accordance with the
City of Bozeman design
standards and specifications.
The applicant will work with
the City on appropriate water
main configurations with
future site plan applications.
5 DSSP V.D.5.a Easements – All Public Utility
easements must be a minimum of 30 feet wide for
one or two utility mains.
Engineering –
Water &
Wastewater
All public utility easements are
a minimum of 30 feet wide.
6 BMC 38.410.070 (A) (1) Municipal water, sanitary
sewer and storm sewer systems: 2016 Water Facility
Plan Recommendation – (CIP Number: FP_2033)
requires the extension of a new 12 inch water main
from the existing 16 inch water main in Blackwood
Engineering –
Water &
Wastewater
A 12” water main is now
included in 11th Avenue to the
south property boundary. The
new water main running in
Blackwood to the east
BLACKWOOD GROVES
MSP Application – RC#2
March 2021
Page 22 of 25
Road to the southern boundary along South 11th
Avenue alignment of the parcel.
a. The proposed water main extension from
the existing 16 inch water main to the east border of
the parcel along Blackwood Road is not required to
be upsized to 12 inches.
property boundary is now
shown as 8”.
1 The applicant must provide and file with the County
Clerk and Recorder's office executed Waivers of
Right to Protest Creation of Special Improvement
Districts (SID’s) or special districts for the following,
if not already filed:
a. Street improvements to S. 19th Avenue
including lighting, signalization, paving, curb/gutter,
sidewalk, and storm drainage.
b. Street improvements to S. 11th Avenue
including lighting, signalization, paving, curb/gutter,
sidewalk, and storm drainage.
c. Street improvements to Blackwood Road
including lighting, signalization, paving, curb/gutter,
sidewalk, and storm drainage.
d. Intersection improvements at Blackwood
Road and S. 11th Avenue including lighting,
signalization, paving, curb/gutter, sidewalk, and
storm drainage.
e. Intersection improvements at Blackwood
Road and S. 19th Avenue including lighting,
signalization, paving, curb/gutter, sidewalk, and
storm drainage.
f. Intersection improvements at Blackwood
Road and S. 3rd Avenue including lighting,
signalization, paving, curb/gutter, sidewalk, and
storm drainage.
g. Intersection improvements at Goldenstein
Lane and S. 3rd Avenue including lighting,
signalization, paving, curb/gutter, sidewalk, and
storm drainage.
h. Intersection improvements at Goldenstein
Lane and S. 19th Avenue including lighting,
signalization, paving, curb/gutter, sidewalk, and
storm drainage.
The document filed must specify that in the event an
SID is not utilized for the completion of these
improvements, the developer agrees to participate
in an alternate financing method for the completion
of said improvements on a fair share, proportionate
basis as determined by square footage of property,
taxable valuation of the property, traffic contribution
from the development, or a combination thereof.
Engineering –
Conditions of
Approval
Understood.
BLACKWOOD GROVES
MSP Application – RC#2
March 2021
Page 23 of 25
The applicant must provide a copy of the filed SID
waiver prior to master site plan approval.
1 DSSP Section XVIII Submittal Requirements - The
applicant is advised that the lighting improvements
will need to be reviewed as a separate infrastructure
submittal. The site plan can be approved prior to
infrastructure review, however, the following
requirements must be satisfied with the
infrastructure submittal. DSSP Section XVIII
Submittal Requirements
a. For Street Lighting submittals, provide
luminaire cut sheets showing compliance with Table
B. New Construction Lighting Design Guidance and
Section XIII. Streetlight Luminaires.
b. For Pedestrian Lighting submittals, provide
a Photometric Plan for new installations showing
compliance with Table C. Pedestrian Lighting
Guidance. Also provide luminaire cut sheets showing
compliance with Section XIV. Pedestrian Luminaires.
c. Lighting calculations showing roadway
luminance (comply with Table B), intersection
illuminance (comply with Table A), sidewalk
illuminance (Section XII
– D), and light trespass (Section XII – D).
d. The applicant is advised a Roadway
Luminaire Submittal Form (contained within the
DSSP) will be required with infrastructure review.
Engineering -
Lighting
Understood. These advisory
comments are noted and will
be addressed during
infrastructure review. A SILD
will be created prior to final
plat approval.
1 BMC 38.400.010: South 11th and Blackwood Road
must be constructed to a collector standard
according to the City’s Transportation Master Plan
(TMP). The applicant is encouraged to continue to
coordinate with the Engineering Department on the
following items.
a. Blackwood Road will serve as a bicycle
connection to and from Sacajawea Middle School.
Accommodation of through bicyclists needs to be
incorporated into street cross section and overall
plan. The applicant is encouraged to continue
coordination with the Engineering Department.
b. South 11th Avenue and Blackwood Road
should be designed with separated bike/pedestrian
facilities. For South 11th Ave, this matches the typical
section to the north and is in line with a general trend
away from on street bike lanes for higher volume
streets. Likewise, with Blackwood Road providing
direct access to Sacajawea Middle School, separated
facilities provide a greater level of comfort for a
wider range of users.
Engineering -
Transportation
The applicant has worked
continuously with the City
Engineering Department to
determine appropriate street
cross sections for Blackwood
and 11th. The agreed-upon
street sections are included in
the preliminary plat and in the
street section exhibits in
Appendix D of the master site
plan submittal.
BLACKWOOD GROVES
MSP Application – RC#2
March 2021
Page 24 of 25
c. Blackwood Road will likely require a two-
way left turn lane or center median to accommodate
the addition of left turn lanes. This issue must be
addressed as part of the traffic impact study
requirements.
d. The desire for on street parking on South
11th Ave and Blackwood Road warrants further
discussion with the engineering department.
2 BMC 38.400.010: South 19th Avenue must be
upgraded to a principal arterial standard along the
western edge of the property according to the City’s
Transportation Master Plan (TMP).
Engineering -
Transportation
South 19th will be upgraded to
a principal arterial, please
refer to the phasing plan in
Appendix A.
3 BMC 38.400.110. and 38.410.120: A trail network
must be constructed through the property as defined
in the City Parks, Recreation, Open Space, and Trails
(PROST) Plan and TMP. The design of all trails
identified in the TMP must be included on the
infrastructure plan submittal for the corresponding
phase. In addition, the applicant is encouraged to
coordinate with the Bozeman public transit service
(Streamline) to incorporate service into the
development.
Engineering -
Transportation
See Parks Master Plan: Section
1 - Trail Network for
information on trail
connections, design, and
adherence to the PROST Plan
and TMP. As each phase of
development comes online,
additional information on trail
construction and layout will
be provided.
4 The applicant is advised that access for Street B at
South 19th Avenue will be subject to intersection
spacing requirements and will be reviewed by MDT
with respect to potential access control and spacing
with other intersections along South 19th Ave which
is an Urban Route on MDT’s system. The applicant
will need to provide the City and MDT with access
approvals for any street connecting to South 19th.
Engineering -
Transportation
Understood.
5 A southbound left turn lane from South 19th
Avenue into the subject property will not be
granted until South 19th Avenue has been widened
to the City’s arterial standard and approved by the
Montana Department of Transportation.
Engineering -
Transportation
Understood.
6 The applicant must provide safe intersections with all
phases of the development.
Engineering -
Transportation
Understood.
7 BMC 38.330.020: Angled parking will be permitted
for the development, however, the following
requirements must be satisfied.
a. The applicant must file a maintenance
agreement with the County Clerk and Recorder in
addition to the plat note identifying the maintenance
requirements and responsibilities of the back-in
angled parking spaces prior to final plat approval.
b. The radii on the transitions to the angled
parking spaces need to be 25’ minimum to allow the
plows to navigate the street edges. Also, vertical
delineators need to be posted on the edges.
Engineering -
Transportation
This item is noted – the
applicant will file a
maintenance agreement prior
to final plat approval and
address final design
considerations during
infrastructure plan review
prior to construction.
BLACKWOOD GROVES
MSP Application – RC#2
March 2021
Page 25 of 25
c. The applicant’s snow storage plan must
identify areas in the subdivision where the snow will
be hauled and there must be sufficient volume in the
snow storage areas for the volume that would have
otherwise been stored in the boulevards.
1 The project falls in the “Meadow Creek signal,
water, and sewer Payback” area. The applicant
must pay all of the payback fees prior phase 1 site
plan approval.
Engineering –
Paybacks
The payback fees will be paid
prior to phase 1 final plat
approval.
1 BMC 38.410.130: Water rights and/or payment of
cash-in-lieu of water right is required prior to
development for the demand on the City’s potable
water system. The applicant must contact Griffin
Neilson with the City Engineering Department to
obtain a determination of cash-in-lieu of water
rights (CILWR) for respective site plan applications.
Engineering –
Water Rights
Water rights and/or payment
of cash-in-lieu of water rights
will be provided prior to final
plat of all applicable phases.
1 BMC 38.410.070. and 38.230.100.A.12: Each phase
of development must connect to the water
distribution system at a minimum of two points to
allow a redundant feed (per City of Bozeman
Engineering DSSP Section V.A. 5).
Engineering –
Utilities
Each phase of the
development connects to the
water distribution system at a
minimum of two points.
2 The subject property is located in an area with high
groundwater with potentially corrosive soils, which
can increase the likelihood of water main failure over
the lifespan of the asset. The applicant must perform
a corrosivity analysis to determine if cathodic
protection is required for the proposed distribution
mains.
Engineering –
Utilities
Understood.
1 BMC 40.04.700 – The applicant must provide
detailed stormwater conveyance sizing and storage
dimensions and elevations with respective site plan
applications.
Engineering –
Stormwater
Understood.
1 BMC 38.600: The applicant is advised that a
floodplain permit must be obtained for any work
proposed in the FEMA floodplain. The floodplain
administrator must issue an approved floodplain
permit prior to Master Site Plan approval. The
applicant is advised that the floodplain permit
cannot be issued until all other required stream
permits have been obtained, and if applicable, a
CLOMR is approved by FEMA.
Engineering –
Natural
Resources
The delineated floodplain is
included on the Preliminary
Plat and within the various
civil plan sheets. The no-rise
certification is included in the
preliminary plat application.
The proposed development
will not affect the delineated
floodplains/floodways. All
permits will be acquired prior
to construction and should
not be required prior to
Master Site Plan approval.
2 The applicant must obtain a floodplain permit and
stream permits for piping the ditch prior to
infrastructure approval.
Engineering –
Natural
Resources
Understood.