HomeMy WebLinkAboutL2.08-IRRIGATION PLAN_11-13-20SLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSL
D
S
L
D SLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLDSLD SLD SLD SLD SLD SLD SLD SLD SLD SLD SLD SLD SLDSLD SLD SLD SLD SLD SLD SLD SLD SLDSLD SLD SLD SLD
SDSDSDSDSDSDSDSDSDSDSDB1(a)1st FloorB1(e)1st FloorB1(a)1st FloorA1(g)2nd FloorB1(a)1st FloorB1(e)1st FloorB1(a)1st FloorB1(e)1st FloorB1(a)1st FloorA1(a)1st FloorB1(e)1st FloorA1(a)1st FloorA1(g)2nd FloorA1(a)1st FloorBOTTOM LEVELD17D20D19 IRRIGATION PLAN SHEET L2.08 MATCH LINE L2.09MATCH LINE L2.13MATCH LINE L2.07MATCH LINE L2.06MATCH LINE L2.05MATCH LINE L2.06MATCH LINE L2.12MATCH LINE L2.07PIPE SIZECHARTIRRIGATION SCHEDULE114XDXREVIEW
SUBMITTAL
DEVELOPMENT
APARTMENT UNITS IN BOZEMAN, MONTANAFARRAN REALTY PARTNERS
BOZEMAN EAST MIXED-USE
4202 BELTWAY DRIVE ADDISON, TX 75001hedk.com214.520.8878
Engineering
1800 RIVER DR. NO. • GREAT FALLS, MONTANA 59401
406.761.3010 • tdhengineering.comIRR HEAD SCHEDULELEGEND J:\2016\16-268 Farran Boz East Tschache Ln\CADD\LANDSCAPE\16-268 L2.X.dwg, 12/10/2020 1:06:38 PM, RLT