Loading...
HomeMy WebLinkAboutE1.00 - ELECTRICAL SITE PLAN (11X17)_11-13-20ZONE 1WATERCOURSESETBACK, TYP.ZONE 2WATERCOURSESETBACK, TYP.ZONE 1WATERCOURSESETBACK, TYP.ZONE 2WATERCOURSESETBACK, TYP.ZONE 1WATERCOURSESETBACK, TYP.ZONE 2WATERCOURSESETBACK, TYP.ccccTTSCHACHE LANETccccccccccc810117799111111997786111010111199977811569119835688101010289101011101058859cc7465ccc474Tcccc10cccccccccccccccccccPL2PL2PL2PL2PL2PL1PL1PL1PL2PL2PL1PL1PL2PL1PL1PL1PL1PL1PL1PL1PL1PL1'MMCA''MMCC1''MMCC2''MMCC3''MMCD'333333344444442222PL1PL1PL1PL1PL1PL1PL1PL1PL1PL1PL1PL1PL1PL1PL1PL1PL1PL1PL1PL1PL1PL1PL1PL1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1B1'MMCB1''MMCB2'SL25(TYP.)SL25(TYP.)SL25(TYP.)SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL25(TYP.)SL2SL2SL2SL2SL2SL2SL2SL25(TYP.)SL2SL2SL2SL2SL2SL25(TYP.)SL2SL2SL2SL2SL25(TYP.)SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL25(TYP.)5(TYP.)SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL25(TYP.)5(TYP.)5(TYP.)SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL2SL25(TYP.)5(TYP.)5(TYP.)10' Clearence (typical)SL2SL2SL2SL2SL2SL2SL2SL2SL203030303030303SL603REVIEW SUBMITTAL DEVELOPMENTDATE05-29-1916206SHEET NUMBERAPARTMENT UNITS IN BOZEMAN, MONTANA FARRAN REALTY PARTNERSPROJECTBOZEMAN EAST MIXED-USE 4202 BELTWAY DRIVE ADDISON, TX 75001 hedk.com214.520.8878 Engineering 1800 RIVER DR. NO. • GREAT FALLS, MONTANA 59401 406.761.3010 • tdhengineering.com TD&H PROJECT NO: 16-268 REV DATE 02.14.20 REVISION CITY COMMENTS01 07.31.20 CITY COMMENTS02 11.13.20 CITY COMMENTS03PLANE1.00ELECTRICAL SITESCALE: 1"=40'-0"ELECTRICAL SITE PLAN118"~2"#4 BARE COPPER BOND FROM BOLT TOREBAR WITH EXOTHERMIC WELD ORCOMPRESSION FITTINGBASE COVER TO MATCH POLE WITH STAINLESSSCREWSSCHEDULE 40PVC (1") TOHANDHOLE OR NEXTFIXTURE AS SHOWN.NUMBER OF FIXTURE HEADSVARY WITH TYPE OF FIXTURESEE FIXTURE SCHEDULECONCEALED WELDED STEEL TENONWITH STAINLESS STEEL BOLTS (ALLWITH POLE)POLE PER SCHEDULENON-SHRINK GROUT UNDER BASEPLATE PACKED TIGHT AFTERLEVELING30" MINCURBLENGTH OF ANCHOR BOLTS PERMANUFACTURERS RECOMMENDATIONS. INSTALLPER FACTORY TEMPLATE. DOUBLE LUGS WITHFLAT WASHERS AT BASE PLATE. CLEAN BOLTTHREADS AND SURFACES TO PROVIDEGROUNDING CONTINUITY TO POLE.#4 REBAR CAGE AT 6"O.C. EACH WAY TOP TO BOTTOM.INSTALL (3)#4 HORIZONTAL TIES WITHIN TOP 6" OF BASE.CONTRACTOR MAY USE PRE-CAST POLEBASE. SUBMIT PRE-CAST DRAWING TOENGINEER FOR APPROVAL.HANDHOLE WITH GROUNDING LUGRUBBED BASE TO 12" BELOW GRADE. RUBCORNERS ROUND AND SIDES SMOOTHLANDSCAPED SURFACE FINALGRADE6'-0" MINIMUM24" ROUND FORMEDSITE LIGHTING POLE BASE DETAILNTSDETAIL GENERAL NOTES:1.INCREASE THE SPECIFIED HEIGHT OF THE POLE BY 2'-0" TO ENSURE UNIFORM FIXTUREMAINTAIN HEIGHT WHERE THE 6" BASE IS USED.2.PROTECTED AREA IMPLIES THE POLE IS INSTALLED AT LEAST 30" FROM PARKING ORDRIVE AREAS.POLE: 20'BASE: 6"NON-SHRINK GROUT: ~2"TOTAL HEIGHT: 20'-8"A.CONTRACTOR SHALL COORDINATE WITH AN UNDERGROUND LOCATING SERVICE PRIORTO COMMENCING WORK. COORDINATE WITH OTHER SITE DISCIPLINES.B.ROUTE CONDUITS IN COMMON TRENCH WHERE POSSIBLE REFER TO TRENCHINGDETAIL. RE:TRENCHING DETAIL.C.SEE ARCHITECTURAL AND CIVIL DRAWINGS FOR ADDITIONAL INFORMATION.D.SITE LIGHTING AND UTILITY EQUIPMENT SHOWN IN APPROXIMATE LOCATION.COORDINATE EXACT LOCATION WITH CIVIL DRAWINGS, PROPERTY LINES, AND UTILITYCOMPANIES PRIOR TO ROUGH-IN.E.PROVIDE PULL-LINE IN ALL EMPTY CONDUITS.GENERAL NOTES:SYMBOL USED FOR NOTE CALLOUT.KEYED NOTES:1.ROUTE CIRCUIT THROUGH LIGHTING CONTROL PANEL. RE:LIGHTING CONTROL PANELDETAIL.2.(1)4" CONDUIT FOR PHONE SERVICE, (1)2" CONDUIT FOR CATV SERVICE AND (1)4"CONDUIT FOR FIBER OPTIC CABLE SERVICE. COORDINATE INSTALLATIONSREQUIREMENTS WITH UTILITIES. STUB CONDUITS 12" ABOVE FLOOR AT 'TTB' AND STUBCONDUITS TO NEAREST TELEPHONE UTILITY PEDESTAL. COORDINATE UTILITYLOCATION PRIOR TO ROUGH-IN. PROVIDE CONDUIT AS REQUIRED. MARK LOCATIONWITH MONUMENT MARKER. PROVIDE PULL-LINE WITH EACH CONDUIT.3.PAD MOUNTED TRANSFORMER AND PAD BY UTILITY.4.UNDERGROUND SECONDARY. RE:ONE-LINE DIAGRAM.5.CANOPY LIGHTING TO BE AN ADD ALTERNATE. COORDINATE WITH ARCHITECT.6.PROVIDE AND INSTALL 1" CONDUIT FROM FIXTURE/JUNCTION BOX ACROSS THESTREET TO THE ADJACENT DEVELOPMENT FOR CONNECTION TO THE STREETLIGHTING CIRCUITS SERVING THE STREET LIGHTS IN THAT DEVELOPMENT.#030303