HomeMy WebLinkAboutC202_Erosion_Sediment_Control_Ph-03 12-18-2020WALTON STREAM-DITCHEXISTING WETLAND (TYP)
WETLANDS WITHIN PROPERTY
BOUNDARY TO BE FILLED
UNDER SECTION 404 CLEAN
WATER ACT PERMIT USACE
NO. NWO-2013-02110-MTB
AUTHORIZED SEPT 6, 2016SFSFSFSFSF
SF
SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFINSTALL SILT FENCE
ALONG NORTHERNPHASE BOUNDARY
SEE DETAIL
1
C020
INSTALL SILT FENCE
ALONG NORTHERNPHASE BOUNDARY
SEE DETAIL
1
C020
EXISTING
STORM WATER
DETENTION BASIN
TO BE ENLARGED
GROUNDWATER
MONITORING WELL
LOCATION (TYP)
50' WETLAND
SETBACK
4
C020
TEMPORARY CONCRETE
WASHOUT FACILITYSEE DETAIL
JOB SITE OFFICETEMPORARY JOB
SITE DUMPSTER
TEMPORARY
SANITARY FACILITY
MATERIALS & EQUIP.
STORAGE / STAGING
AREA
SF SF SF SF SF SF SF SFSFSFSFSFSFINSTALL SILT FENCEALONG NORTHERN
PHASE BOUNDARYSEE DETAIL1
C020
2
C020
TEMPORARY GRAVEL CONSTRUCTIONENTRANCE WITH WASH RACK
SEE DETAIL
2
C020
TEMPORARY GRAVEL CONSTRUCTION
ENTRANCE WITH WASH RACK
SEE DETAIL
S2°21'23"W 493.32'N87°39'57"W 152.02'
N88°30'36"W 189.83'
N4
3
°
3
0
'
2
0
"
W
3
5
5
.
8
8
'N1°29'24"E 551.27'S87°55'12"E 799.23'
EXISTING 100'
FLOOD PLAIN LIMITS
(APPROXIMATE)//////////////////////////////////////////////////////P
4723
SDSDSDSDSDSDSDSDSD SD SD
4723
SDSDSDSD
SD4722
4724
4
7
2
1
4730WWW
WWW
4721
47214725
4723
47234722
4725 4724
SDSDWSD4726
PPSDSD SDSDSDSDSDSD4727
4724
4722
4720
4725
4722
4725
4724
4723
4720
4725
472
5 472247204720
4732
47314729
4727 P4730
4728
4726
WV
WV 4724
4721
4723
4720
DYH
WV
WV
P
PDYH
DYH
PPDYH
WV
WV
WV
WV
WV
WV
WV
WV
WV
WV
WV PPW W W W W W W W W W W W W W
WSS SS SS SS
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSNGNGNGNGNGNGBPBPBPBPBPBPBPBFBFBFBFBTBTBTBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTV
BCTVSD
SD4726
4727
4725
47244724
47264727
47
2
9
47
2
8
47274
7
2
5 47244723
4722
PROPOSED 100'
FLOOD PLAIN LIMITS
(APPROXIMATE)
47
2
2
4718
EXISTING ASPHALT
EXISTING CONCRETE
LEGEND
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
4725
4724.00
DELINEATED WETLANDS
11x17 HORIZONTAL SCALE: 1" = 80'
GRAPHIC SCALE
0
(IN FEET)
20 402040
1 INCH = 40 FT Know what's below.
before you dig.Call
R
1
EROSION & SEDIMENT CONTROL NOTES:
1.ALL IMPROVEMENTS ON THIS PROJECT SHALL BE COMPLETED IN
ACCORDANCE WITH THE MONTANA PUBLIC WORKS STANDARD
SPECIFICATIONS, 6TH EDITION DATED APRIL 2010 (MPWSS); THE CITY OF
BOZEMAN MODIFICATIONS TO THE MPWSS; AND THE PROJECT
SPECIFICATIONS.
2.ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE
INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING,
STRIPPING, GRADING, ETC). ALL OTHER REQUIRED EROSION CONTROL
MEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THE
CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT
SCHEDULE, CONSTRUCTION PLANS, AND STORMWATER MANAGEMENT PLAN.
3.AT ALL TIMES DURING CONSTRUCTION, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR PREVENTING AND CONTROLLING ON-SITE EROSION
INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TO
MINIMIZE WIND BLOWN SEDIMENT. THE CONTRACTOR SHALL ALSO BE
RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROL
FACILITIES SHOWN HEREIN.
4.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED
WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION
SHALL BE LIMITED TO THE AREA(S) REQUIRED FOR IMMEDIATE CONSTRUCTION
OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME.
5.CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN
ADDITION TO WHAT IS SHOWN ON THESE PLANS. THE CONTRACTOR SHALL
IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY TO
CONTROL ON-SITE EROSION.
6.ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY
APPROPRIATE EROSION CONTROL METHODS. ANY SOIL STOCKPILE THAT WILL
BE DORMANT FOR OVER THIRTY (30) DAYS SHALL BE SEEDED.
7.THE CONTRACTOR SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE
NECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OF
POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLE
LOCAL, STATE, AND FEDERAL REGULATIONS.
8.THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTION
MATERIALS INADVERTENTLY DEPOSITED ON EXISTING STREETS OR OTHER
PUBLIC RIGHTS OF WAY, AND MAKE SURE STREETS ARE CLEANED AT THE END
OF EACH WORKING DAY.
NOTES BY SYMBOL:
PROTECT EXISTING 48" Ø SANITARY
DURING CONSTRUTION1
2
3
PROTECT EXISTING CITY OF BOZEMAN 36"
STANDARD STORM DRAIN INLET
PROTECT EXISTING FIRE HYDRANT AND
GATE VALVE DURING CONSTRUCTION
LOT 6A PT LAN
D
P
H
2 SUBDIVISION
MONTANA KEYS
T
O
N
E
V
E
N
T
U
R
E
S
,
LLC
17 LOCKWOOD D
R
.
CHARLESTON, SC
2
9
4
0
1
-
1
1
9
0
ZONING: B-2
BRIDGER PEAK
S
TOWN CENTE
R
S
U
B
.
PH 1 & 2
BRIDGER PEAKS T
O
W
N
C
E
N
T
E
R
C/O REEF REAL ES
T
A
T
E
SERVICES LLC
SAN DIEGO, CA 9
2
1
0
1
-
2
7
8
6
LOT 3A
MINOR SUB N
O
.
4
0
7
A
CHRISTIAN CENT
E
R
F
I
R
S
T
ASSEMBLY OF GO
D
921 W. MENDEN
H
A
L
S
T
BOZEMAN, MT 597
1
5
-
2
2
3
9
ZONING: B-2ZONING: B-2ZONING: B-2
TRACT 2B1
COS 1215HLOWES HOME CE
N
T
E
R
S
I
N
C
.
MOORESVILLE, N
C
2
8
1
1
7
BRIDGER PEAKS
T
O
W
N
C
E
N
T
E
R
C/O REEF REAL E
S
T
A
T
E
SERVICES LLC
SAN DIEGO, CA
9
2
1
0
1
-
2
7
8
6
BRIDGER PEAKS
T
O
W
N
C
E
N
T
E
R
C/O REEF REAL E
S
T
A
T
E
SERVICES LLC
SAN DIEGO, CA
9
2
1
0
1
-
2
7
8
6
BRIDGER PEAKS T
O
W
N
C
E
N
T
E
R
C
/
O
REEF REAL ESTATE
S
E
R
V
I
C
E
S
L
L
C
SAN DIEGO, CA 9
2
1
0
1
-
2
7
8
6
ZONING: B-2
ZONING: B-2
ZONING: B-2
ZONING: B-2
BRIDGER PEAK
S
TOWN CENT
E
R
S
U
B
.
PH 1 & 2
BRIDGER PEA
K
S
TOWN CENTER
S
U
B
.
PH 1 & 2
LOT 4 BRIDGER
PEAKS VILLAG
E
SUBDIVISION
COMMON AREA M
S
T
R
GEN. DELIVERY
BOZEMAN, MT 5
9
7
1
8
LOT 4 WALTO
N
HOMESTEAD P
H
1
SUBDIVISION
MANHATTAN BANK
PO BOX 690
MANHATTAN, MT
5
9
7
4
1
ZONING: B-2
ZONING: B-2
11
1
1
2
2
2
2
2
2
2
3
3
3
4 INSTALL TYPE D INLET PROTECTION BMP
FOLLOWING COMPLETION OF NEW STORM
DRAIN INLET INSTALLATION
REFER TO DETAIL 3 ON SHEET C020
*ALL TOPSOIL WILL BE HAULED OFF-SITE AND LATER
INSTALLED AS NEEDED AROUND THE SITE.REVIEWSUBMITTALDEVELOPMENTAPARTMENT UNITS IN BOZEMAN, MONTANAFARRAN REALTY PARTNERSBOZEMAN EAST MIXED-USE4202 BELTWAY DRIVE ADDISON, TX 75001hedk.com214.520.8878Engineering1800 RIVER DR. NO. • GREAT FALLS, MONTANA 59401406.761.3010 • tdhengineering.com