Loading...
HomeMy WebLinkAboutEX-6 MASTER SITE PLAN_11-13-20EE EE E E SD SDSDSDSDSDSDSD SD SD SD SD SD SD SD SDS D S D S D S D S DSDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SDSD SD SDSDSDSDSDSDSDSDSDSD SDSDSDSDSDSDSD S2°21'23"W 493.32'N87°39'57"W 152.02' N88°30'36"W 189.83' N 4 3 ° 3 0 ' 2 0 "W 3 5 5 . 8 8 'N1°29'24"E 551.27'S87°55'12"E 799.23' E E EE E E //////////////////////// //////////////////////////////PSDSDSDSDSDSDSDSDSD SD SD SDSDS D S D S DWWWW W WSDSD WSDPPSDSD SDSDSDSDSDSDPWV WV DYH WV WV P PDYH DYH PPDYH WV WV WV WV WV WV WV WV WV WV WV PPW W W W W W W W W W W W W W WSS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSNGNGNGNGN G NG BPBPBPBPBPB P B PBFBFBFBFBTB T B T BCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTV BCTVSD SDBCTVBCTVBCTV BCT V BCT V BCT V BCT V B P B PBPBPBP BPBPBP BPBPB PBCTVBTBTBTBTBTBTBTBT BT BT BT BT BT BTBTBP BP BP BP BP BP BPBPBP BP BP BP BP BP BTBTBT BT BT BT BT BT GASGASGASGAS GAS GAS GASGASGASGASGASGASGASGASGASGASB P BP BP BP BP BP BP BP BP BP BP BP BP BPBPBCTV BCTV BCTV BCTV BCTV BCTV BCTV BCTV BCTV BCTV BCTVBCTVBCTVBCTVBTBTBTBTBC T V B C T V B T B T B T BP BP BP BP BP BP BPGASGASGASGASGASGAS GAS GAS GAS GAS GAS GAS GAS8W 8W 8W 8W 8W 8W 8W 8W 8W8W8WH YDWS H YDHYD HYDHYDHYD 8W8W 8W 8W 8W 8W 8W 8W 8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W 8W 8W8W8W8W8W8W6FIRE6WS8S8S8S8S 8S 8S 8S 8S 8 S 8 S 8 S 8 S 8 S 8 S 8 S 8 S 8 S TSCHACHE LANE BUILDING 1/A BUILDING 2/B BUILDING 3/C H H H H H BUILDING 4/D H 3 LEGEND T c COMPACT PARKING SPACE 5 PARKING COUNT M MAINTENANCE BUILDING PARKING FOR BUILDING 1/A - PHASE 2 PARKING LEGEND PARKING FOR BUILDING 2/B - PHASE 2 PARKING FOR BUILDING 3/C - PHASE 1 PARKING FOR BUILDING 4/D - PHASE 1 H FIRE HYDRANT - PHASE 1 MASTER SITE PLAN DESCRIPTION 1. PROPOSED ENTITLEMENT PERIOD: 5 YEARS 2. DETAILED PHASING INFORMATION : REFER TO NARRATIVE. a. PROPOSED PHASING LINES: SEE MASTER SITE PLAN THIS SHEET. b. PROPOSED LIMITS OF CONSTRUCTION FOR EACH PHASE: SEE MASTER SITE PLAN THIS SHEET. c. PROPOSED PLAN FOR STAGING AND PHASING OF CONSTRUCTION INCLUDING STORAGE OF TOPSOIL, SPOILS AND CONSTRUCTIONS MATERIALS AND EQUIPMENT: SEE MASTER SITE PLAN THIS SHEET; CONSTRUCTION STORAGE WILL BE GENERALLY LOCATED ON THE EAST SIDE OF THE SITE, FOR BOTH PHASES I & II. CONSTRUCTION DEBRIS WILL BE STORED IN A/MULTIPLE LARGE TRASH CONTAINERS ON THE WEST SIDE OF THE SITE. d. ANY INFRASTRUCTURE OR SITE PLAN ELEMENTS PROPOSED FOR FINANCIAL GUARANTEE: NONE. e. PHASING CONTINGENCIES: ONLY TWO PHASES DO NOT ANTICIPATE VARIATION IN PROPOSED PHASING. 3. DESIGN GUIDELINES TO DIRECT DESIGN OF DEVELOPMENT OVER THE ENTITLEMENT PERIOD: N/A BUILDINGS ARE FULLY DESIGNED AND WILL BE CONSISTENT WITH DEVELOPMENT REVIEW SUBMITTAL. 4. FOLLOWING THE APPROVAL OF A MASTER SITE PLAN THE APPLICANT SHALL SUBMIT TO THE DEPARTMENT, SEQUENTIAL INDIVIDUAL SITE PLAN FOR SPECIFIC AREAS WITHIN THE MASTER SITE PLAN. EACH SUBSEQUENT APPLICATION FOR A SITE PLAN SHALL BE CONSISTENT WITH THE APPROVED MASTER SITE PLAN AND SUBJECT TO THE REVIEW CRITERIA OF SECTION 38.19.100.A BMC.OOO PHASE 1 BOUNDARY & CONSTRUCTION LIMITS PHASE 1 INCLUDES ALL SANITARY SEWER MAINS PHASE 1 INCLUDES ALL SANITARY WATER MAINS PHASE 2 BOUNDARY & CONSTRUCTION LIMITS CONSTRUCTION STAGING & STORAGE PHASE I & II MIXED-USE BUILDING PEDESTRIAN CORRIDOR SNOW STORAGE AREAS TRASH ENCLOSURE PROPERTY LINE BUILDING SETBACK PARKING SETBACK SITE INFORMATION CODE REQUIREMENT PROVIDED/REQUESTED ZONING B-2 COMMUNITY BUSINESS DISTRICT B-2 WITH CONDITIONAL USE PERMIT FOR RESIDENTIAL ON FIRST FLOOR COMMUNITY PLAN REGIONAL COMMERCIAL & SERVICES -- LOT AREA ±11.85 ACRES / ±516,186 SQ. FT. RESIDENTIAL UNITS 305 EFFICIENCY/STUDIO UNITS 60 ONE BEDROOM 139 TWO BEDROOM 106 DENSITY 25.7 DU/AC COMMERCIAL SPACE ±18,043 SQ. FT. SETBACKS - BUILDING FRONTYARD BASED ON BLOCK FRONTAGE - STOREFRONT - BUILDING REQUIRED AT FRONT PROPERTY LINE/BACK EDGE OF SIDEWALK. ADDITIONAL SETBACKS ARE ALLOWED FOR WIDENED SIDEWALK OR PEDESTRIAN-ORIENTED SPACE (38.520.060.D). BUILDING LOCATED APP 20 FEET FROM PROPERTY LINE DUE TO EXISTING STORM DRAIN EASEMENT - WIDENED SIDEWALK / PEDESTRIAN ORIENTED SPACE PROVIDED. SIDEYARD 5-FEET (EXCEPT ZERO LOT LINES)5-FEET PROVIDED, SEE PLAN REARYARD 10-FEET 10-FEET PROVIDED, SEE PLAN SETBACK - PARKING & LOADING FRONTYARD FRONT SETBACK PROVISIONS ARE SET FORTH IN THE BLOCK FRONTAGE STANDARDS IN DIVISION 38.510 AND IN 38.350.070. 25-FEET PROVIDED, INCLUDING LANDSCAPE SCREENING, SEE PLAN SIDEYARD 8-FEET 8-FEET PROVIDED, SEE PLAN REARYARD 10-FEET 10-FEET PROVIDED, SEE PLAN SETBACK - PUBLIC ACCESS EASEMENT PUBLIC ACCESS EASEMENT SETBACK - SPECIAL RESIDENTIAL 1. SEE MASTER SITE PLAN FOR PHASING BOUNDARIES 2. SEWER MAIN TO BE CONSTRUCTED IN PHASE 1 3. WATER MAIN TO BE CONSTRUCTED IN PHASE 1 4. STORMWATER TO BE CONSTRUCTED IN TWO SEPARATE PHASES SEE MASTER SITE PLAN FOR DETAILS. PHASE 1 WILL DISCHARGE TO THE EXISTING STORMWATER DITCH UNTIL PHASE 2 IS CONSTRUCTED. STORMWATER POND TO BE EXPANDED IN PHASE 1. 5. MIDBLOCK CROSSING BETWEEN BUILDING 2 & 3 TO BE CONSTRUCTED IN PHASE 2. PHASING NOTES:OOOOOOO OOO O O OOOOOOOOOOREVIEWSUBMITTALDEVELOPMENTAPARTMENT UNITS IN BOZEMAN, MONTANAFARRAN REALTY PARTNERSBOZEMAN EAST MIXED-USE4202 BELTWAY DRIVE ADDISON, TX 75001hedk.com214.520.8878Engineering1800 RIVER DR. NO. • GREAT FALLS, MONTANA 59401406.761.3010 • tdhengineering.com