HomeMy WebLinkAbout2.10_Bozeman East Mixed-Use Itemized Change List
MONTANA | WASHINGTON | IDAHO | NORTH DAKOTA | PENNSYLVANIA
406.761.3010
tdhengineering.com
1800 River Drive North
Great Falls, MT 59401
July 31, 2020 RE: BOZEMAN EAST MIXED USE, MASTER SITE PLAN & SITE PLAN 19230/19231
ITEMIZED LIST OF REVISIONS PART I: APPLICATIONS & CHECKLISTS
1. Updated Table of Contents 2. Revisions and Correction Form 3. COVID-19 Acknowledgement
PART II: NARRATIVES, RESPONSES & PHOTOGRAPHS 1. Updated Project Narrative 2. Response to DRC Comments 3. Response to Engineering Comments 4. Response to Wetland Comments 5. Departure Request Narrative & Exhibit
6. Itemized List of Revisions
PART III: LEGAL DOCUMENTS 1. Waiver of Right to Protest SID 06/30/20 PART IV: PLANS 1. All Plan Sheets have an updated titleblock with submittal date
T1.0 OVERALL TITLE SHEET 07-31-20 – Updated Sheet List, Dates, Tables
EXHIBITS:
T1.1 EXHIBIT TITLE SHEET 07-31-20 – Updated Sheet List, Dates, Tables
EX-1 CONCEPTUAL SITE PLAN 07-31-20 – Updated Tables, Site Plan & Figures
EX-2 PARKING LAYOUT & CLACS 07-31-20 – Updated Tables, Site Plan & Figures
EX-3 BLOCK FRONTAGE & SECTIONS 07-31-20 – Updated Tables, Site Plan & Figures
EX-4 PARKLAND EXHIBIT 07-31-20 – Updated Tables, Site Plan & Figures
EX-5 ADJACENT PROPERTY OWNER EXHIBIT 05-29-19 – No Update
EX-6 MASTER SITE PLAN 07-31-20 – Updated Tables, Site Plan & Figures
EX-7 ARCHITECTURAL RENDERING-BUILDING A 05-29-19 – No Update
CIVIL SHEETS:
T1.2 CIVIL TITLE SHEET 07-31-20 – Updated Tables, Site Plan & Figures
C000 COVER SHEET 07-31-20 – No Update
C010 GENERAL NOTES, LEGEND & ABBREVIATIONS 07-31-20 – No Update
C015 CONSTRUCTION TRAFFIC ROUTE MAP 07-31-20 – No Update
C020 EROSION & SEDIMENT CONTROL DETAILS 07-31-20 – No Update
July 31, 2020 PAGE NO. 2
tdhengineering.com
C030 WATER DETAILS 07-31-20 – No Update
C040 SANITARY SEWER DETAILS 07-31-20 – No Update
C050 CURB, PAVING, APPROACH & DECORATIVE CROSSWALK DETAILS 07-31-20 –No Update
C052 SIGNAGE & PAVEMENT MARKING DETAILS 07-31-20 – No Update
C100 EXISTING SITE FEATURES & TOPOGRAPHY 07-31-20 – Additional wetland information provided
C200 EROSION & SEDIMENT CONTROL - PHASE 1 - PRECONSTRUCTION 07-31-20 – Additional
wetland information provided
C201 EROSION & SEDIMENT CONTROL - PHASE 2 - SITE PREPARATION 07-31-20 – Additional wetland information provided
C202 EROSION & SEDIMENT CONTROL - PHASE 3 - CONSTRUCTION 07-31-20 – Additional wetland information provided, parking lot changes
C300 WET UTILITY PLAN 07-31-20 – Additional wetland information provided, parking lot changes
C301 DRY UTILITY PLAN 07-31-20 – Additional wetland information provided, parking lot changes
C500 OVERALL SITE PLAN & DIMENSIONS PLAN 07-31-20 – Additional wetland information provided, parking lot changes, #8 note change, snow storage area changes
C501 SITE SIGNAGE & PAVEMENT MARKINGS 07-31-20 – Updated ADA parking locations, added compact car signs
C600 OVERALL GRADING & DRAINAGE PLAN 07-31-20 – No Update
C601 GRADING PLAN 07-31-20 – Additional proposed and existing contour labels added
C602 GRADING PLAN 07-31-20 – Additional proposed and existing contour labels added
C603 GRADING PLAN 07-31-20 – Additional proposed and existing contour labels added
C604 GRADING PLAN 07-31-20 – Additional proposed and existing contour labels added
C605 GRADING PLAN 07-31-20 – Additional proposed and existing contour labels added
C606 GRADING PLAN 07-31-20 – Additional proposed and existing contour labels added
C607 GRADING PLAN 07-31-20 – Additional proposed and existing contour labels added
C608 GRADING PLAN 07-31-20 – Additional proposed and existing contour labels added
C609 GRADING PLAN 07-31-20 – Additional proposed and existing contour labels added
C610 GRADING PLAN 07-31-20 – Additional proposed and existing contour labels added
ARCHITECTURAL SHEETS:
T1.3 ARCHITECTURAL TITLE SHEET 07-31-20 – Updated Tables, Site Plan & Figures
A0-00 COVER 07-31-20 - Updated dates
A8-00 SITE PLAN 07-31-20 – Updated plan, notes & figures
A8-01 BUILDING 'A' ELEVATIONS 07-31-20 – Updated transparency calcs & added direction notation
A8-02 BUILDING 'B' ELEVATIONS 07-31-20 – Updated transparency calcs & added direction notation
A8-03 BUILDING 'C' ELEVATIONS 07-31-20 – Updated transparency calcs & added direction notation
A8-04 BUILDING 'C' ELEVATIONS 07-31-20 – Updated transparency calcs & added direction notation
A8-06 BUILDING 'D' ELEVATIONS 07-31-20 – Updated transparency calcs & added direction notation
A8-07 BUILDING AREA ANALYSIS 07-31-20 – Updated based on comments
A8-08 BUILDING AREA ANALYSIS 07-31-20 – Updated based on comments
A8-11 BUILDING 'A' FIRST FLOOR PLAN 07-31-20 – No update
A8-12 BUILDING 'A' SECOND FLOOR PLAN 07-31-20 – No update
A8-13 BUILDING 'A' THIRD FLOOR PLAN 07-31-20 – No update
A8-14 BUILDING 'A' ROOF PLAN 07-31-20 – No update
July 31, 2020 PAGE NO. 3
tdhengineering.com
A8-21 BUILDING 'B' FIRST FLOOR PLAN 07-31-20 – No update
A8-22 BUILDING 'B' SECOND FLOOR PLAN 07-31-20 – No update
A8-23 BUILDING 'B' THIRD FLOOR PLAN 07-31-20 – No update
A8-24 BUILDING 'B' FOURTH FLOOR PLAN 07-31-20 – No update
A8-25 BUILDING 'B' ROOF PLAN 07-31-20 – No update
A8-31 BUILDING 'C' FIRST FLOOR PLAN 07-31-20 – Relocated Maintenance Area into Building
A8-32 BUILDING 'C' SECOND FLOOR PLAN 07-31-20 – No update
A8-33 BUILDING 'C' THIRD FLOOR PLAN 07-31-20 – No update
A8-34 BUILDING 'C' FOURTH FLOOR PLAN 07-31-20 – No update
A8-35 BUILDING 'C' ROOF PLAN 07-31-20 – No update
A8-41 BUILDING 'D' FIRST FLOOR PLAN 07-31-20 – No update
A8-42 BUILDING 'D' SECOND FLOOR PLAN 07-31-20 – No update
A8-43 BUILDING 'D' THIRD FLOOR PLAN 07-31-20 – Enlarged text
A8-44 BUILDING 'D' ROOF PLAN 07-31-20 – No update
A8-45 S1 ANSI UNIT PLAN 07-31-20 – No update
A8-46 A1(a) UNIT PLAN 07-31-20 – No update
A8-47 A1(d) UNIT PLAN 07-31-20 – No update
A8-48 A1(e) UNIT PLAN 07-31-20 – No update
A8-49 A1(g) UNIT PLAN 07-31-20 – No update
A8-50 A2(a) UNIT PLAN 07-31-20 – No update
A8-51 B1(a) UNIT PLAN 07-31-20 – No update
A8-52 B1(d) UNIT PLAN 07-31-20 – No update
A8-53 B1(e) UNIT PLAN 07-31-20 – No update
A8-54 B2(a) UNIT PLAN 07-31-20 – No update
A8-55 LEASING & CLUBROOM FLOOR 1 07-31-20 – No update
A8-56 FITNESS CENTER 07-31-20 – No update
A8-57 BUSINESS CENTER 07-31-20 – No update
A8-58 MAINTENANCE BUILDING 07-31-20 – Removed – no longer used
A8-59 SINGLE TRASH ENCLOSURE 07-31-20 – Updates per comments
A8-60 BUILDING 'A' SECTIONS 07-31-20 – No update
A8-61 BUILDING 'B' SECTIONS 07-31-20 – No update
A8-62 BUILDING 'C' SECTIONS 07-31-20 – No update
A8-63 BUILDING 'C' SECTIONS 07-31-20 – No update
A8-64 BUILDING 'D' SECTIONS 07-31-20 – No update
ELECTRICAL/PLUMBING SHEETS:
T1.4 MEP TITLE SHEET 07-31-20 – Updated Tables, Site Plan & Figures
MEP0-00 MEP NOTES & LEGEND 07-31-20 - No update
E1.00 ELECTRICAL SITE PLAN 07-31-20 – Updates based on comments
E1.01 ELECTRICAL SITE PHOTOMETRIC PLAN 07-31-20 – General Site Plan Updates
E1.02 LIGHT FIXTURE CUT SHEETS 07-31-20 – No update
E1.03 LIGHT FIXTURE CUT SHEETS 07-31-20 – No update P1.00 PLUMBING SITE UTILITY PLAN 07-31-20 - Updates based on comments
July 31, 2020 PAGE NO. 4
tdhengineering.com
LANDSCAPE PLANS
T1.5 LANDSCAPE TITLE SHEET 07-31-20 – Updated Tables, Site Plan & Figures
L1.00 COVER NOTES & LEGEND 07-31-20 – Updated Site Plan & Master Planting Schedule
L1.01 LANDSCAPE PLAN 07-31-20 – Updated Site Plan, Planting Schedule & Legend
L1.02 LANDSCAPE PLAN 07-31-20 – Updated Site Plan, Planting Schedule & Legend
L1.03 LANDSCAPE PLAN 07-31-20 – Updated Site Plan, Planting Schedule & Legend
L1.04 LANDSCAPE PLAN 07-31-20 – Updated Site Plan, Planting Schedule & Legend
L1.05 LANDSCAPE PLAN 07-31-20 – Updated Site Plan, Planting Schedule & Legend
L1.06 LANDSCAPE PLAN 07-31-20 – Updated Site Plan, Planting Schedule & Legend
L1.07 LANDSCAPE PLAN 07-31-20 – Updated Site Plan, Planting Schedule & Legend
L1.08 LANDSCAPE PLAN 07-31-20 – Updated Site Plan, Planting Schedule & Legend
L1.09 LANDSCAPE PLAN 07-31-20 – Updated Site Plan, Planting Schedule & Legend
L1.10 LANDSCAPE PLAN 07-31-20 – Updated Site Plan, Planting Schedule & Legend
L1.11 LANDSCAPE PLAN 07-31-20 – Updated Site Plan, Planting Schedule & Legend
L1.12 LANDSCAPE PLAN 07-31-20 – Updated Site Plan, Planting Schedule & Legend
L1.13 LANDSCAPE PLAN 07-31-20 – Updated Site Plan, Planting Schedule & Legend
L1.14 LANDSCAPE PLAN 07-31-20 – Updated Site Plan, Planting Schedule & Legend
L1.15 LANDSCAPE DETAILS 07-31-20 – Updated Details
L1.16 LANDSCAPE DETAILS 07-31-20 – Updated Details
L1.17 LANDSCAPE DETAILS 07-31-20 – Added Sheet with Details
L2.00 IRRIGATION NOTES & LEGEND 07-31-20 – Updated Site Plan
L2.01 OVERALL IRRIGATION PLAN 07-31-20 – Updated Site Plan & Adjusted Irrigation System
L2.02 IRRIGATION PLAN 07-31-20 – Updated Site Plan & Adjusted Irrigation System
L2.03 IRRIGATION PLAN 07-31-20 – Updated Site Plan & Adjusted Irrigation System
L2.04 IRRIGATION PLAN 07-31-20 – Updated Site Plan & Adjusted Irrigation System
L2.05 IRRIGATION PLAN 07-31-20 – Updated Site Plan & Adjusted Irrigation System
L2.06 IRRIGATION PLAN 07-31-20 – Updated Site Plan & Adjusted Irrigation System
L2.07 IRRIGATION PLAN 07-31-20 – Updated Site Plan & Adjusted Irrigation System
L2.08 IRRIGATION PLAN 07-31-20 – Updated Site Plan & Adjusted Irrigation System
L2.09 IRRIGATION PLAN 07-31-20 – Updated Site Plan & Adjusted Irrigation System
L2.10 IRRIGATION PLAN 07-31-20 – Updated Site Plan & Adjusted Irrigation System
L2.11 IRRIGATION PLAN 07-31-20 – Updated Site Plan & Adjusted Irrigation System
L2.12 IRRIGATION PLAN 07-31-20 – Updated Site Plan & Adjusted Irrigation System
L2.13 IRRIGATION PLAN 07-31-20 – Updated Site Plan & Adjusted Irrigation System
L2.14 IRRIGATION PLAN 07-31-20 – Updated Site Plan & Adjusted Irrigation System
L2.15 IRRIGATION PLAN 07-31-20 – Updated Site Plan & Adjusted Irrigation System
L2.16 IRRIGATION DETAILS 07-31-20 – Updated Titleblock
IMPROVEMENTS IN-LIEU PARKLAND PLANS
T1.6 PARKLAND TITLE SHEET 07-31-20 – Updated Tables, Site Plan & Figures
L1.00 COVER NOTES & LEGEND 07-31-20 – Updated Site Plan & Master Planting Schedule
July 31, 2020 PAGE NO. 5
tdhengineering.com
L1.01 OVERALL PARKLAND PLAN & CALCULATIONS 07-31-20 – Updated Site Plan & Calculations
L1.02 PARKLAND PLAN 07-31-20 – Updated Site Plan, Planting Schedule & Legend
L1.03 PARKLAND PLAN 07-31-20 – Updated Site Plan, Planting Schedule & Legend
L1.04 PARKLAND PLAN 07-31-20 – Updated Site Plan, Planting Schedule & Legend
L1.05 PARKLAND PLAN 07-31-20 – Updated Site Plan, Planting Schedule & Legend
L1.06 PARKLAND PLAN 07-31-20 – Updated Site Plan, Planting Schedule & Legend
L1.07 PARKLAND PLAN 07-31-20 – Updated Site Plan, Planting Schedule & Legend
L1.08 PARKLAND DETAILS 07-31-20 – Updated Details PART V: APENDICES 1. Appendix C: Engineering: Storm Sewer Report 2020.06.30 2. Appendix F: Snow Storage Report 2020.06.30 3. Appendix K: Concurrent Construction Plan 2020.01.07 4. Appendix L: Bridger Peaks Town Center Drainage Design Report, October 1998 5. Appendix Q: Specification 092411 Portland Cement Plaster 2020.07.31
J:\2016\16-268 Farran Boz East Tschache Ln\DOCUMENTS\DEVELOPMENT REVIEW\03_RE RESUBMITTAL-2\SITE PLAN\02_NARRATIVES_RESPONSES-PHOTOGRAPHS\2.10_BOZEMAN EAST MIXED-USE ITEMIZED CHANGE LIST.DOCX