Loading...
HomeMy WebLinkAbout00_Table of Contents_03-19-21 MONTANA | WASHINGTON | IDAHO | NORTH DAKOTA | PENNSYLVANIA 406.761.3010 tdhengineering.com 1800 River Drive North Great Falls, MT 59401 March 19, 2021 Note: Underlined Items have been updated for 03/19/21 resubmittal. BOZEMAN EAST MIXED-USE SITE PLAN TABLE OF CONTENTS PART I: APPLICATIONS & CHECKLISTS 1.0 Revisions & Corrections Submittal Form 1.1 A1: Development Review Application 1.2 PLS: Plans & Specifications 1.3 SP: Site Plan Required Materials 1.4 SP1: Site Plan Checklist Clean 1.5 SP1: Site Plan Checklist Response 02/14/2020 1.6 N1: Noticing Materials 1.7 Stamped unsealed plain #10 envelopes (previously provided) 1.8 COVID-19 Acknowledgement PART II: NARRATIVES, RESPONSES & PHOTOGRAPHS 2.1 Copy of Check 2.2 Fee Calculations 2.3 Adjacent Owners List 2.4 Response to City Comments from Informal Review App No. 18510 2.5 Project Narrative 11/13/2020 2.6 Response to DRC Comments 07/31/2020 2.7 Response to Engineering Comments 07/31/2020 2.7.1 Eng #6 Response 2.7.2 Eng #10 Response 2.8 Response to Wetland Comments 07/31/2020 2.8.1 Wetland#1 Response 2.9 Departure Request Narrative 07/31/2020 2.9.1 Departure Exhibit 2.10Itemized List of Changes 07/31/2020 2.11Response 19230 Bozeman East Mixed-Use ADR 11/13/2020 2.12Response 19230 Bozeman East Mixed-Use DRC 11/13/2020 2.13Response 19230 Bozeman East Mixed-Use Engineering 11/13/2020 2.14Response 19203 Bozeman East Mixed-Use Park & Rec 11/13/2020 2.15Response to 19230/19231 Bozeman East Mixed-Use Engineering Comments 03/19/2021 2.16Itemized List of Changes 03/19/2021 March 19, 2021 PAGE NO. 2 tdhengineering.com PART III: LEGAL DOCUMENTS 3.1 North 15th Avenue Road Construction Agreement 3.2 Storm Water Drainage Easement Agreement 06/09/1999 3.3 DRAFT Public Access Easement for Multi-use path 03/12/2021 3.4 Notification of Acceptance of Liability for Mitigation Requirement USACE 3.5 Concurrent Construction Payment Agreement DRAFT 02/14/2020 3.6 Public Street & Utility Easement 07/03/2018 (Duplicate Moved to 3.13 Easements) 3.7 Temporary Construction Access Easement 07/03/2018 3.8 Release and Reconveyance Easement 02/14/2020 (Duplicate Moved to 3.13 Easements) 3.9 Emergency Access Agreement 05/09/2017 3.10Proposed Storm Easement 02/14/2020 3.11Waiver of Right to Protest SID 12/18/2020 3.12Irrevocable Offer of Dedication 12/18/2020 3.13Easements, see files 03/19/2021 PART IV: PLANS T1.0: Title Sheet Exhibits Civil Plan Sheets Architectural Plan Sheets MEP Plan Sheets Landscape & Irrigation Plan Sheets Parkland Plan Sheets PART V: APENDICES A. Engineering: Water Report 12/18/2020 B. Engineering: Sewer Report 12/18/20200 C. Engineering: Storm Sewer Report 03/19/2021 D. Flood Hazard Report 12/18/2020 E. Geotechnical Report F. Snow Storage Report G. Wetland Delineation Report USACE H. Wetland Determination USACE I. Traffic Impact Study J. Limited Grading Approval Email K. Concurrent Construction Plan 12/18/2020 L. Bridger Peaks Town Center Drainage Design Report, October 1998 M. Bozeman East Mixed Use Drainage Report 2020.02.14 (Duplicate – note used) N. Flood Plain Firmette O. Phased Revegetation Plan 02/14/2020 P. Balcony Review Request 01/10/2020 Q. Specification 092411 Portland Cement Plaster 07/31/2020 R. Cash-In-Lieu Correspondence 12/18/2020 S. Stormwater Maintenance Plan 12/18/2020 T. Fire Correspondence 12/18/2020 J:\2016\16-268 Farran Boz East Tschache Ln\DOCUMENTS\DEVELOPMENT REVIEW\05_RE RESUBMITTAL-4\SITE PLAN\00_COVERSHEET\00_TABLE OF CONTENTS.DOC