Loading...
HomeMy WebLinkAboutC202_Erosion_Sediment_Control_Ph-03 12-18-2020WALTON STREAM-DITCHEXISTING WETLAND (TYP) WETLANDS WITHIN PROPERTY BOUNDARY TO BE FILLED UNDER SECTION 404 CLEAN WATER ACT PERMIT USACE NO. NWO-2013-02110-MTB AUTHORIZED SEPT 6, 2016SFSFSFSFSF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFINSTALL SILT FENCE ALONG NORTHERNPHASE BOUNDARY SEE DETAIL 1 C020 INSTALL SILT FENCE ALONG NORTHERNPHASE BOUNDARY SEE DETAIL 1 C020 EXISTING STORM WATER DETENTION BASIN TO BE ENLARGED GROUNDWATER MONITORING WELL LOCATION (TYP) 50' WETLAND SETBACK 4 C020 TEMPORARY CONCRETE WASHOUT FACILITYSEE DETAIL JOB SITE OFFICETEMPORARY JOB SITE DUMPSTER TEMPORARY SANITARY FACILITY MATERIALS & EQUIP. STORAGE / STAGING AREA SF SF SF SF SF SF SF SFSFSFSFSFSFINSTALL SILT FENCEALONG NORTHERN PHASE BOUNDARYSEE DETAIL1 C020 2 C020 TEMPORARY GRAVEL CONSTRUCTIONENTRANCE WITH WASH RACK SEE DETAIL 2 C020 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE WITH WASH RACK SEE DETAIL S2°21'23"W 493.32'N87°39'57"W 152.02' N88°30'36"W 189.83' N4 3 ° 3 0 ' 2 0 " W 3 5 5 . 8 8 'N1°29'24"E 551.27'S87°55'12"E 799.23' EXISTING 100' FLOOD PLAIN LIMITS (APPROXIMATE)//////////////////////////////////////////////////////P 4723 SDSDSDSDSDSDSDSDSD SD SD 4723 SDSDSDSD SD4722 4724 4 7 2 1 4730WWW WWW 4721 47214725 4723 47234722 4725 4724 SDSDWSD4726 PPSDSD SDSDSDSDSDSD4727 4724 4722 4720 4725 4722 4725 4724 4723 4720 4725 472 5 472247204720 4732 47314729 4727 P4730 4728 4726 WV WV 4724 4721 4723 4720 DYH WV WV P PDYH DYH PPDYH WV WV WV WV WV WV WV WV WV WV WV PPW W W W W W W W W W W W W W WSS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSNGNGNGNGNGNGBPBPBPBPBPBPBPBFBFBFBFBTBTBTBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTV BCTVSD SD4726 4727 4725 47244724 47264727 47 2 9 47 2 8 47274 7 2 5 47244723 4722 PROPOSED 100' FLOOD PLAIN LIMITS (APPROXIMATE) 47 2 2 4718 EXISTING ASPHALT EXISTING CONCRETE LEGEND EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR 4725 4724.00 DELINEATED WETLANDS 11x17 HORIZONTAL SCALE: 1" = 80' GRAPHIC SCALE 0 (IN FEET) 20 402040 1 INCH = 40 FT Know what's below. before you dig.Call R 1 EROSION & SEDIMENT CONTROL NOTES: 1.ALL IMPROVEMENTS ON THIS PROJECT SHALL BE COMPLETED IN ACCORDANCE WITH THE MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS, 6TH EDITION DATED APRIL 2010 (MPWSS); THE CITY OF BOZEMAN MODIFICATIONS TO THE MPWSS; AND THE PROJECT SPECIFICATIONS. 2.ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL OTHER REQUIRED EROSION CONTROL MEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND STORMWATER MANAGEMENT PLAN. 3.AT ALL TIMES DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING AND CONTROLLING ON-SITE EROSION INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TO MINIMIZE WIND BLOWN SEDIMENT. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN HEREIN. 4.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA(S) REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 5.CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT IS SHOWN ON THESE PLANS. THE CONTRACTOR SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY TO CONTROL ON-SITE EROSION. 6.ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY APPROPRIATE EROSION CONTROL METHODS. ANY SOIL STOCKPILE THAT WILL BE DORMANT FOR OVER THIRTY (30) DAYS SHALL BE SEEDED. 7.THE CONTRACTOR SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. 8.THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTION MATERIALS INADVERTENTLY DEPOSITED ON EXISTING STREETS OR OTHER PUBLIC RIGHTS OF WAY, AND MAKE SURE STREETS ARE CLEANED AT THE END OF EACH WORKING DAY. NOTES BY SYMBOL: PROTECT EXISTING 48" Ø SANITARY DURING CONSTRUTION1 2 3 PROTECT EXISTING CITY OF BOZEMAN 36" STANDARD STORM DRAIN INLET PROTECT EXISTING FIRE HYDRANT AND GATE VALVE DURING CONSTRUCTION LOT 6A PT LAN D P H 2 SUBDIVISION MONTANA KEYS T O N E V E N T U R E S , LLC 17 LOCKWOOD D R . CHARLESTON, SC 2 9 4 0 1 - 1 1 9 0 ZONING: B-2 BRIDGER PEAK S TOWN CENTE R S U B . PH 1 & 2 BRIDGER PEAKS T O W N C E N T E R C/O REEF REAL ES T A T E SERVICES LLC SAN DIEGO, CA 9 2 1 0 1 - 2 7 8 6 LOT 3A MINOR SUB N O . 4 0 7 A CHRISTIAN CENT E R F I R S T ASSEMBLY OF GO D 921 W. MENDEN H A L S T BOZEMAN, MT 597 1 5 - 2 2 3 9 ZONING: B-2ZONING: B-2ZONING: B-2 TRACT 2B1 COS 1215HLOWES HOME CE N T E R S I N C . MOORESVILLE, N C 2 8 1 1 7 BRIDGER PEAKS T O W N C E N T E R C/O REEF REAL E S T A T E SERVICES LLC SAN DIEGO, CA 9 2 1 0 1 - 2 7 8 6 BRIDGER PEAKS T O W N C E N T E R C/O REEF REAL E S T A T E SERVICES LLC SAN DIEGO, CA 9 2 1 0 1 - 2 7 8 6 BRIDGER PEAKS T O W N C E N T E R C / O REEF REAL ESTATE S E R V I C E S L L C SAN DIEGO, CA 9 2 1 0 1 - 2 7 8 6 ZONING: B-2 ZONING: B-2 ZONING: B-2 ZONING: B-2 BRIDGER PEAK S TOWN CENT E R S U B . PH 1 & 2 BRIDGER PEA K S TOWN CENTER S U B . PH 1 & 2 LOT 4 BRIDGER PEAKS VILLAG E SUBDIVISION COMMON AREA M S T R GEN. DELIVERY BOZEMAN, MT 5 9 7 1 8 LOT 4 WALTO N HOMESTEAD P H 1 SUBDIVISION MANHATTAN BANK PO BOX 690 MANHATTAN, MT 5 9 7 4 1 ZONING: B-2 ZONING: B-2 11 1 1 2 2 2 2 2 2 2 3 3 3 4 INSTALL TYPE D INLET PROTECTION BMP FOLLOWING COMPLETION OF NEW STORM DRAIN INLET INSTALLATION REFER TO DETAIL 3 ON SHEET C020 *ALL TOPSOIL WILL BE HAULED OFF-SITE AND LATER INSTALLED AS NEEDED AROUND THE SITE.REVIEWSUBMITTALDEVELOPMENTAPARTMENT UNITS IN BOZEMAN, MONTANAFARRAN REALTY PARTNERSBOZEMAN EAST MIXED-USE4202 BELTWAY DRIVE ADDISON, TX 75001hedk.com214.520.8878Engineering1800 RIVER DR. NO. • GREAT FALLS, MONTANA 59401406.761.3010 • tdhengineering.com