HomeMy WebLinkAboutEX-6 MASTER SITE PLAN_11-13-20EE
EE E
E
SD SDSDSDSDSDSDSD
SD
SD SD
SD
SD
SD
SD
SDS
D
S
D
S
D
S
D
S
DSDSDSDSDSD SD SD SD SD SD SD SD
SD
SD SD SD SD SD SDSD
SD SDSDSDSDSDSDSDSDSDSD
SDSDSDSDSDSDSD S2°21'23"W 493.32'N87°39'57"W 152.02'
N88°30'36"W 189.83'
N
4
3
°
3
0
'
2
0
"W
3
5
5
.
8
8
'N1°29'24"E 551.27'S87°55'12"E 799.23'
E
E
EE E
E
////////////////////////
//////////////////////////////PSDSDSDSDSDSDSDSDSD SD SD
SDSDS
D
S
D
S
DWWWW
W
WSDSD WSDPPSDSD SDSDSDSDSDSDPWV
WV DYH
WV
WV
P
PDYH
DYH
PPDYH
WV
WV
WV
WV
WV
WV
WV
WV
WV
WV
WV PPW W W W W W W W W W W W W W
WSS SS SS SS
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSNGNGNGNGN
G
NG
BPBPBPBPBPB
P
B
PBFBFBFBFBTB
T
B
T
BCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTV
BCTVSD
SDBCTVBCTVBCTV BCT
V
BCT
V
BCT
V
BCT
V
B
P
B
PBPBPBP
BPBPBP
BPBPB
PBCTVBTBTBTBTBTBTBTBT BT BT BT BT BT
BTBTBP BP BP
BP BP BP
BPBPBP
BP
BP
BP
BP
BP
BTBTBT BT
BT
BT
BT
BT
GASGASGASGAS
GAS
GAS
GASGASGASGASGASGASGASGASGASGASB
P
BP BP BP BP BP BP BP BP BP BP BP BP
BPBPBCTV BCTV BCTV BCTV BCTV BCTV BCTV BCTV BCTV BCTV
BCTVBCTVBCTVBCTVBTBTBTBTBC
T
V
B
C
T
V
B
T
B
T
B
T
BP BP BP BP
BP BP BPGASGASGASGASGASGAS GAS GAS GAS GAS GAS GAS
GAS8W 8W 8W 8W 8W 8W 8W 8W 8W8W8WH YDWS
H YDHYD
HYDHYDHYD 8W8W
8W
8W
8W
8W
8W
8W
8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W 8W 8W8W8W8W8W8W6FIRE6WS8S8S8S8S 8S 8S 8S 8S
8
S
8
S
8
S
8
S
8
S
8
S
8
S
8
S
8
S
TSCHACHE LANE
BUILDING 1/A
BUILDING 2/B
BUILDING 3/C
H
H
H
H
H
BUILDING 4/D
H
3
LEGEND
T
c COMPACT PARKING SPACE
5 PARKING COUNT
M MAINTENANCE BUILDING
PARKING FOR BUILDING 1/A - PHASE 2
PARKING LEGEND
PARKING FOR BUILDING 2/B - PHASE 2
PARKING FOR BUILDING 3/C - PHASE 1
PARKING FOR BUILDING 4/D - PHASE 1
H FIRE HYDRANT - PHASE 1
MASTER SITE PLAN DESCRIPTION
1. PROPOSED ENTITLEMENT PERIOD: 5 YEARS
2. DETAILED PHASING INFORMATION : REFER TO NARRATIVE.
a. PROPOSED PHASING LINES: SEE MASTER SITE PLAN THIS SHEET.
b. PROPOSED LIMITS OF CONSTRUCTION FOR EACH PHASE: SEE MASTER SITE PLAN THIS SHEET.
c. PROPOSED PLAN FOR STAGING AND PHASING OF CONSTRUCTION INCLUDING STORAGE OF TOPSOIL,
SPOILS AND CONSTRUCTIONS MATERIALS AND EQUIPMENT: SEE MASTER SITE PLAN THIS SHEET;
CONSTRUCTION STORAGE WILL BE GENERALLY LOCATED ON THE EAST SIDE OF THE SITE, FOR BOTH
PHASES I & II. CONSTRUCTION DEBRIS WILL BE STORED IN A/MULTIPLE LARGE TRASH CONTAINERS
ON THE WEST SIDE OF THE SITE.
d. ANY INFRASTRUCTURE OR SITE PLAN ELEMENTS PROPOSED FOR FINANCIAL GUARANTEE: NONE.
e. PHASING CONTINGENCIES: ONLY TWO PHASES DO NOT ANTICIPATE VARIATION IN PROPOSED
PHASING.
3. DESIGN GUIDELINES TO DIRECT DESIGN OF DEVELOPMENT OVER THE ENTITLEMENT PERIOD: N/A
BUILDINGS ARE FULLY DESIGNED AND WILL BE CONSISTENT WITH DEVELOPMENT REVIEW SUBMITTAL.
4. FOLLOWING THE APPROVAL OF A MASTER SITE PLAN THE APPLICANT SHALL SUBMIT TO THE
DEPARTMENT, SEQUENTIAL INDIVIDUAL SITE PLAN FOR SPECIFIC AREAS WITHIN THE MASTER SITE PLAN.
EACH SUBSEQUENT APPLICATION FOR A SITE PLAN SHALL BE CONSISTENT WITH THE APPROVED MASTER
SITE PLAN AND SUBJECT TO THE REVIEW CRITERIA OF SECTION 38.19.100.A BMC.OOO
PHASE 1 BOUNDARY & CONSTRUCTION LIMITS
PHASE 1 INCLUDES ALL SANITARY SEWER MAINS
PHASE 1 INCLUDES ALL SANITARY WATER MAINS
PHASE 2 BOUNDARY & CONSTRUCTION LIMITS
CONSTRUCTION STAGING & STORAGE PHASE I & II
MIXED-USE BUILDING
PEDESTRIAN CORRIDOR
SNOW STORAGE AREAS
TRASH ENCLOSURE
PROPERTY LINE
BUILDING SETBACK
PARKING SETBACK
SITE INFORMATION
CODE REQUIREMENT PROVIDED/REQUESTED
ZONING B-2 COMMUNITY BUSINESS DISTRICT B-2 WITH CONDITIONAL USE PERMIT FOR
RESIDENTIAL ON FIRST FLOOR
COMMUNITY PLAN REGIONAL COMMERCIAL & SERVICES --
LOT AREA ±11.85 ACRES / ±516,186 SQ. FT.
RESIDENTIAL UNITS 305
EFFICIENCY/STUDIO UNITS 60
ONE BEDROOM 139
TWO BEDROOM 106
DENSITY 25.7 DU/AC
COMMERCIAL SPACE ±18,043 SQ. FT.
SETBACKS - BUILDING
FRONTYARD
BASED ON BLOCK FRONTAGE - STOREFRONT -
BUILDING REQUIRED AT FRONT PROPERTY
LINE/BACK EDGE OF SIDEWALK. ADDITIONAL
SETBACKS ARE ALLOWED FOR WIDENED SIDEWALK
OR PEDESTRIAN-ORIENTED SPACE (38.520.060.D).
BUILDING LOCATED APP 20 FEET FROM
PROPERTY LINE DUE TO EXISTING
STORM DRAIN EASEMENT - WIDENED
SIDEWALK / PEDESTRIAN ORIENTED
SPACE PROVIDED.
SIDEYARD 5-FEET (EXCEPT ZERO LOT LINES)5-FEET PROVIDED, SEE PLAN
REARYARD 10-FEET 10-FEET PROVIDED, SEE PLAN
SETBACK - PARKING & LOADING
FRONTYARD
FRONT SETBACK PROVISIONS ARE SET FORTH IN
THE BLOCK FRONTAGE STANDARDS IN DIVISION
38.510 AND IN 38.350.070.
25-FEET PROVIDED, INCLUDING
LANDSCAPE SCREENING, SEE PLAN
SIDEYARD 8-FEET 8-FEET PROVIDED, SEE PLAN
REARYARD 10-FEET 10-FEET PROVIDED, SEE PLAN
SETBACK - PUBLIC ACCESS EASEMENT
PUBLIC ACCESS EASEMENT
SETBACK - SPECIAL RESIDENTIAL
1. SEE MASTER SITE PLAN FOR PHASING BOUNDARIES
2. SEWER MAIN TO BE CONSTRUCTED IN PHASE 1
3. WATER MAIN TO BE CONSTRUCTED IN PHASE 1
4. STORMWATER TO BE CONSTRUCTED IN TWO SEPARATE PHASES SEE MASTER SITE PLAN FOR DETAILS. PHASE 1 WILL
DISCHARGE TO THE EXISTING STORMWATER DITCH UNTIL PHASE 2 IS CONSTRUCTED. STORMWATER POND TO BE
EXPANDED IN PHASE 1.
5. MIDBLOCK CROSSING BETWEEN BUILDING 2 & 3 TO BE CONSTRUCTED IN PHASE 2.
PHASING NOTES:OOOOOOO
OOO
O O
OOOOOOOOOOREVIEWSUBMITTALDEVELOPMENTAPARTMENT UNITS IN BOZEMAN, MONTANAFARRAN REALTY PARTNERSBOZEMAN EAST MIXED-USE4202 BELTWAY DRIVE ADDISON, TX 75001hedk.com214.520.8878Engineering1800 RIVER DR. NO. • GREAT FALLS, MONTANA 59401406.761.3010 • tdhengineering.com