HomeMy WebLinkAbout2.9_EX-6 MASTER SITE PLAN_11-13-20EE
EE E
E
SD SDSDSDSDSDSD
SD
SD
SD
SD
SD
SD
SD
SD
SDS
D
S
D
SD
S
D
SDSDSDSDSDSD SD SD SD SD SD SD SD
SD
SD SD SD SD SD SDSD
SD SDSDSDSDSDSDSDSDSDSD
SDSDSDSDSDSDSD S2°21'23"W 493.32'N87°39'57"W 152.02'
N88°30'36"W 189.83'
N4
3
°
3
0
'
2
0
"
W
3
5
5
.
8
8
'N1°29'24"E 551.27'S87°55'12"E 799.23'
E
E
EE E
E
//////////////////
////////////////////////////////////PSDSDSDSDSDSDSDSDSD SD SD
SDSDS
D
SD
S
DWWWW
W
WSDSD WSDPPSDSD SDSDSDSDSDSDPWV
WV
DYH
WV
WV
P
PDYH
DYH
PPDYH
WV
WV
WV
WV
WV
WV
WV
WV
WV
WV
WV PPW W W W W W W W W W W W W W
WSS SS SS SS
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSNGNGNGNGN
G
NGBPBPBPBPBPBP
B
PBFBFBFBFBTBT
BT
BCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTV
BCTVSD
SDBCTVBCTVBCTV BCTV
BCTV
BCT
V
BCT
V
B
P
B
PBPBPBP
BPBPBP
BPBPB
PBCTVBTBTBTBTBTBTBTBTBT BT BT BT BT
BTBTBP BP BP
BP BP BP
BPBPBP
BP
BP
BP
BP
BP
BTBTBTBT
BT
BT
BT
BT
GASGASGASGAS
GAS
GAS
GASGASGASGASGASGASGASGASGASGASB
P
BP BP BP BP BP BP BP BP BP BP BP BP
BPBPBCTV BCTV BCTV BCTV BCTV BCTV BCTV BCTV BCTV BCTV
BCTVBCTVBCTVBCTVBTBTBTBTB
C
T
V
B
C
T
V
BT
B
T
B
T
BP BP BP BP BP BP BPGASGASGASGASGASGAS GAS GAS GAS GAS GAS GAS
GAS8W 8W 8W 8W 8W 8W 8W 8W 8W8W8WH YDWS
H YDHYD
HYDHYDHYD 8W8W
8W
8
W
8
W
8
W
8W
8W
8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W 8W 8W8W8W8W8W8W6FIRE6WS8S8S8S8S 8S 8S 8S 8S
8S
8
S
8
S
8
S
8
S
8S
8S
8S
8S
TSCHACHE LANE
BUILDING 1/A
BUILDING 2/B
BUILDING 3/C
H
H
H
H
H
BUILDING 4/D
H
3
LEGEND
T
c COMPACT PARKING SPACE
5 PARKING COUNT
M MAINTENANCE BUILDING
PARKING FOR BUILDING 1/A - PHASE 2
PARKING LEGEND
PARKING FOR BUILDING 2/B - PHASE 2
PARKING FOR BUILDING 3/C - PHASE 1
PARKING FOR BUILDING 4/D - PHASE 1
H FIRE HYDRANT - PHASE 1
MASTER SITE PLAN DESCRIPTION
1. PROPOSED ENTITLEMENT PERIOD: 5 YEARS2. DETAILED PHASING INFORMATION : REFER TO NARRATIVE.a. PROPOSED PHASING LINES: SEE MASTER SITE PLAN THIS SHEET.b. PROPOSED LIMITS OF CONSTRUCTION FOR EACH PHASE: SEE MASTER SITE PLAN THIS SHEET.c. PROPOSED PLAN FOR STAGING AND PHASING OF CONSTRUCTION INCLUDING STORAGE OF TOPSOIL,SPOILS AND CONSTRUCTIONS MATERIALS AND EQUIPMENT: SEE MASTER SITE PLAN THIS SHEET;CONSTRUCTION STORAGE WILL BE GENERALLY LOCATED ON THE EAST SIDE OF THE SITE, FOR BOTHPHASES I & II. CONSTRUCTION DEBRIS WILL BE STORED IN A/MULTIPLE LARGE TRASH CONTAINERSON THE WEST SIDE OF THE SITE.d. ANY INFRASTRUCTURE OR SITE PLAN ELEMENTS PROPOSED FOR FINANCIAL GUARANTEE: NONE.e. PHASING CONTINGENCIES: ONLY TWO PHASES DO NOT ANTICIPATE VARIATION IN PROPOSEDPHASING.3. DESIGN GUIDELINES TO DIRECT DESIGN OF DEVELOPMENT OVER THE ENTITLEMENT PERIOD: N/ABUILDINGS ARE FULLY DESIGNED AND WILL BE CONSISTENT WITH DEVELOPMENT REVIEW SUBMITTAL.4. FOLLOWING THE APPROVAL OF A MASTER SITE PLAN THE APPLICANT SHALL SUBMIT TO THEDEPARTMENT, SEQUENTIAL INDIVIDUAL SITE PLAN FOR SPECIFIC AREAS WITHIN THE MASTER SITE PLAN.EACH SUBSEQUENT APPLICATION FOR A SITE PLAN SHALL BE CONSISTENT WITH THE APPROVED MASTERSITE PLAN AND SUBJECT TO THE REVIEW CRITERIA OF SECTION 38.19.100.A BMC.OOO
PHASE 1 BOUNDARY & CONSTRUCTION LIMITSPHASE 1 INCLUDES ALL SANITARY SEWER MAINSPHASE 1 INCLUDES ALL SANITARY WATER MAINS
PHASE 2 BOUNDARY & CONSTRUCTION LIMITS
CONSTRUCTION STAGING & STORAGE PHASE I & II
MIXED-USE BUILDING
PEDESTRIAN CORRIDOR
SNOW STORAGE AREAS
TRASH ENCLOSURE
PROPERTY LINE
BUILDING SETBACK
PARKING SETBACK
SITE INFORMATION
CODE REQUIREMENT PROVIDED/REQUESTED
ZONING B-2 COMMUNITY BUSINESS DISTRICT B-2 WITH CONDITIONAL USE PERMIT FOR
RESIDENTIAL ON FIRST FLOOR
COMMUNITY PLAN REGIONAL COMMERCIAL & SERVICES --
LOT AREA ±11.85 ACRES / ±516,186 SQ. FT.
RESIDENTIAL UNITS 305
EFFICIENCY/STUDIO UNITS 60
ONE BEDROOM 139
TWO BEDROOM 106
DENSITY 25.7 DU/AC
COMMERCIAL SPACE ±18,043 SQ. FT.
SETBACKS - BUILDING
FRONTYARD
BASED ON BLOCK FRONTAGE - STOREFRONT -
BUILDING REQUIRED AT FRONT PROPERTY
LINE/BACK EDGE OF SIDEWALK. ADDITIONAL
SETBACKS ARE ALLOWED FOR WIDENED SIDEWALK
OR PEDESTRIAN-ORIENTED SPACE (38.520.060.D).
BUILDING LOCATED APP 20 FEET FROM
PROPERTY LINE DUE TO EXISTING
STORM DRAIN EASEMENT - WIDENED
SIDEWALK / PEDESTRIAN ORIENTED
SPACE PROVIDED.
SIDEYARD 5-FEET (EXCEPT ZERO LOT LINES)5-FEET PROVIDED, SEE PLAN
REARYARD 10-FEET 10-FEET PROVIDED, SEE PLAN
SETBACK - PARKING & LOADING
FRONTYARD
FRONT SETBACK PROVISIONS ARE SET FORTH IN
THE BLOCK FRONTAGE STANDARDS IN DIVISION
38.510 AND IN 38.350.070.
25-FEET PROVIDED, INCLUDING
LANDSCAPE SCREENING, SEE PLAN
SIDEYARD 8-FEET 8-FEET PROVIDED, SEE PLAN
REARYARD 10-FEET 10-FEET PROVIDED, SEE PLAN
SETBACK - PUBLIC ACCESS EASEMENT
PUBLIC ACCESS EASEMENT
SETBACK - SPECIAL RESIDENTIAL
1. SEE MASTER SITE PLAN FOR PHASING BOUNDARIES
2. SEWER MAIN TO BE CONSTRUCTED IN PHASE 1
3. WATER MAIN TO BE CONSTRUCTED IN PHASE 1
4. STORMWATER TO BE CONSTRUCTED IN TWO SEPARATE PHASES SEE MASTER SITE PLAN FOR DETAILS. PHASE 1 WILL
DISCHARGE TO THE EXISTING STORMWATER DITCH UNTIL PHASE 2 IS CONSTRUCTED. STORMWATER POND TO BE
EXPANDED IN PHASE 1.
5. MIDBLOCK CROSSING BETWEEN BUILDING 2 & 3 TO BE CONSTRUCTED IN PHASE 2.
PHASING NOTES:OOOOOO O
OOO
O O
OOOOOOOOOOREVIEWSUBMITTALDEVELOPMENTAPARTMENT UNITS IN BOZEMAN, MONTANAFARRAN REALTY PARTNERSBOZEMAN EAST MIXED-USE4202 BELTWAY DRIVE ADDISON, TX 75001hedk.com214.520.8878Engineering1800 RIVER DR. NO. • GREAT FALLS, MONTANA 59401406.761.3010 • tdhengineering.com