Loading...
HomeMy WebLinkAbout2.9_EX-6 MASTER SITE PLAN_11-13-20EE EE E E SD SDSDSDSDSDSD SD SD SD SD SD SD SD SD SDS D S D SD S D SDSDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SDSD SD SDSDSDSDSDSDSDSDSDSD SDSDSDSDSDSDSD S2°21'23"W 493.32'N87°39'57"W 152.02' N88°30'36"W 189.83' N4 3 ° 3 0 ' 2 0 " W 3 5 5 . 8 8 'N1°29'24"E 551.27'S87°55'12"E 799.23' E E EE E E ////////////////// ////////////////////////////////////PSDSDSDSDSDSDSDSDSD SD SD SDSDS D SD S DWWWW W WSDSD WSDPPSDSD SDSDSDSDSDSDPWV WV DYH WV WV P PDYH DYH PPDYH WV WV WV WV WV WV WV WV WV WV WV PPW W W W W W W W W W W W W W WSS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSNGNGNGNGN G NGBPBPBPBPBPBP B PBFBFBFBFBTBT BT BCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTVBCTV BCTVSD SDBCTVBCTVBCTV BCTV BCTV BCT V BCT V B P B PBPBPBP BPBPBP BPBPB PBCTVBTBTBTBTBTBTBTBTBT BT BT BT BT BTBTBP BP BP BP BP BP BPBPBP BP BP BP BP BP BTBTBTBT BT BT BT BT GASGASGASGAS GAS GAS GASGASGASGASGASGASGASGASGASGASB P BP BP BP BP BP BP BP BP BP BP BP BP BPBPBCTV BCTV BCTV BCTV BCTV BCTV BCTV BCTV BCTV BCTV BCTVBCTVBCTVBCTVBTBTBTBTB C T V B C T V BT B T B T BP BP BP BP BP BP BPGASGASGASGASGASGAS GAS GAS GAS GAS GAS GAS GAS8W 8W 8W 8W 8W 8W 8W 8W 8W8W8WH YDWS H YDHYD HYDHYDHYD 8W8W 8W 8 W 8 W 8 W 8W 8W 8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W 8W 8W8W8W8W8W8W6FIRE6WS8S8S8S8S 8S 8S 8S 8S 8S 8 S 8 S 8 S 8 S 8S 8S 8S 8S TSCHACHE LANE BUILDING 1/A BUILDING 2/B BUILDING 3/C H H H H H BUILDING 4/D H 3 LEGEND T c COMPACT PARKING SPACE 5 PARKING COUNT M MAINTENANCE BUILDING PARKING FOR BUILDING 1/A - PHASE 2 PARKING LEGEND PARKING FOR BUILDING 2/B - PHASE 2 PARKING FOR BUILDING 3/C - PHASE 1 PARKING FOR BUILDING 4/D - PHASE 1 H FIRE HYDRANT - PHASE 1 MASTER SITE PLAN DESCRIPTION 1. PROPOSED ENTITLEMENT PERIOD: 5 YEARS2. DETAILED PHASING INFORMATION : REFER TO NARRATIVE.a. PROPOSED PHASING LINES: SEE MASTER SITE PLAN THIS SHEET.b. PROPOSED LIMITS OF CONSTRUCTION FOR EACH PHASE: SEE MASTER SITE PLAN THIS SHEET.c. PROPOSED PLAN FOR STAGING AND PHASING OF CONSTRUCTION INCLUDING STORAGE OF TOPSOIL,SPOILS AND CONSTRUCTIONS MATERIALS AND EQUIPMENT: SEE MASTER SITE PLAN THIS SHEET;CONSTRUCTION STORAGE WILL BE GENERALLY LOCATED ON THE EAST SIDE OF THE SITE, FOR BOTHPHASES I & II. CONSTRUCTION DEBRIS WILL BE STORED IN A/MULTIPLE LARGE TRASH CONTAINERSON THE WEST SIDE OF THE SITE.d. ANY INFRASTRUCTURE OR SITE PLAN ELEMENTS PROPOSED FOR FINANCIAL GUARANTEE: NONE.e. PHASING CONTINGENCIES: ONLY TWO PHASES DO NOT ANTICIPATE VARIATION IN PROPOSEDPHASING.3. DESIGN GUIDELINES TO DIRECT DESIGN OF DEVELOPMENT OVER THE ENTITLEMENT PERIOD: N/ABUILDINGS ARE FULLY DESIGNED AND WILL BE CONSISTENT WITH DEVELOPMENT REVIEW SUBMITTAL.4. FOLLOWING THE APPROVAL OF A MASTER SITE PLAN THE APPLICANT SHALL SUBMIT TO THEDEPARTMENT, SEQUENTIAL INDIVIDUAL SITE PLAN FOR SPECIFIC AREAS WITHIN THE MASTER SITE PLAN.EACH SUBSEQUENT APPLICATION FOR A SITE PLAN SHALL BE CONSISTENT WITH THE APPROVED MASTERSITE PLAN AND SUBJECT TO THE REVIEW CRITERIA OF SECTION 38.19.100.A BMC.OOO PHASE 1 BOUNDARY & CONSTRUCTION LIMITSPHASE 1 INCLUDES ALL SANITARY SEWER MAINSPHASE 1 INCLUDES ALL SANITARY WATER MAINS PHASE 2 BOUNDARY & CONSTRUCTION LIMITS CONSTRUCTION STAGING & STORAGE PHASE I & II MIXED-USE BUILDING PEDESTRIAN CORRIDOR SNOW STORAGE AREAS TRASH ENCLOSURE PROPERTY LINE BUILDING SETBACK PARKING SETBACK SITE INFORMATION CODE REQUIREMENT PROVIDED/REQUESTED ZONING B-2 COMMUNITY BUSINESS DISTRICT B-2 WITH CONDITIONAL USE PERMIT FOR RESIDENTIAL ON FIRST FLOOR COMMUNITY PLAN REGIONAL COMMERCIAL & SERVICES -- LOT AREA ±11.85 ACRES / ±516,186 SQ. FT. RESIDENTIAL UNITS 305 EFFICIENCY/STUDIO UNITS 60 ONE BEDROOM 139 TWO BEDROOM 106 DENSITY 25.7 DU/AC COMMERCIAL SPACE ±18,043 SQ. FT. SETBACKS - BUILDING FRONTYARD BASED ON BLOCK FRONTAGE - STOREFRONT - BUILDING REQUIRED AT FRONT PROPERTY LINE/BACK EDGE OF SIDEWALK. ADDITIONAL SETBACKS ARE ALLOWED FOR WIDENED SIDEWALK OR PEDESTRIAN-ORIENTED SPACE (38.520.060.D). BUILDING LOCATED APP 20 FEET FROM PROPERTY LINE DUE TO EXISTING STORM DRAIN EASEMENT - WIDENED SIDEWALK / PEDESTRIAN ORIENTED SPACE PROVIDED. SIDEYARD 5-FEET (EXCEPT ZERO LOT LINES)5-FEET PROVIDED, SEE PLAN REARYARD 10-FEET 10-FEET PROVIDED, SEE PLAN SETBACK - PARKING & LOADING FRONTYARD FRONT SETBACK PROVISIONS ARE SET FORTH IN THE BLOCK FRONTAGE STANDARDS IN DIVISION 38.510 AND IN 38.350.070. 25-FEET PROVIDED, INCLUDING LANDSCAPE SCREENING, SEE PLAN SIDEYARD 8-FEET 8-FEET PROVIDED, SEE PLAN REARYARD 10-FEET 10-FEET PROVIDED, SEE PLAN SETBACK - PUBLIC ACCESS EASEMENT PUBLIC ACCESS EASEMENT SETBACK - SPECIAL RESIDENTIAL 1. SEE MASTER SITE PLAN FOR PHASING BOUNDARIES 2. SEWER MAIN TO BE CONSTRUCTED IN PHASE 1 3. WATER MAIN TO BE CONSTRUCTED IN PHASE 1 4. STORMWATER TO BE CONSTRUCTED IN TWO SEPARATE PHASES SEE MASTER SITE PLAN FOR DETAILS. PHASE 1 WILL DISCHARGE TO THE EXISTING STORMWATER DITCH UNTIL PHASE 2 IS CONSTRUCTED. STORMWATER POND TO BE EXPANDED IN PHASE 1. 5. MIDBLOCK CROSSING BETWEEN BUILDING 2 & 3 TO BE CONSTRUCTED IN PHASE 2. PHASING NOTES:OOOOOO O OOO O O OOOOOOOOOOREVIEWSUBMITTALDEVELOPMENTAPARTMENT UNITS IN BOZEMAN, MONTANAFARRAN REALTY PARTNERSBOZEMAN EAST MIXED-USE4202 BELTWAY DRIVE ADDISON, TX 75001hedk.com214.520.8878Engineering1800 RIVER DR. NO. • GREAT FALLS, MONTANA 59401406.761.3010 • tdhengineering.com