HomeMy WebLinkAbout2.2_Fee Calculations
MONTANA | WASHINGTON | IDAHO | NORTH DAKOTA | PENNSYLVANIA
406.761.3010
tdhengineering.com
1800 River Drive North
Great Falls, MT 59401
May 29, 2019
BOZEMAN EAST MIXED-USE
FEE CALCULATIONS
1. Master site plan: $1,935 2. Site plan review: Base: $2,278
Dwelling units: $35,990 ($118 x 305) Non-residential: $9,540
($530 x 18 (±18,000 sq. Of non-residential proposed)) 3. Conditional use permit: $1,594
4. Total: $51,337
J:\2016\16-268 Farran Boz East Tschache Ln\DOCUMENTS\DEVELOPMENT REVIEW\01_RESUBMITTAL DOCS\MASTER SITE PLAN_CUP\02_NARRATIVES_RESPONSES_PHOTOGRAPHS\2.1_FEE CALCULATIONS.DOC