Loading...
HomeMy WebLinkAbout21- Change Order 1 - Dick Anderson Construction - WRF Solids Dewatering Building Expansion and Headworks Improvements Project EJCDC= ENGINEERS JOINT CONTRACT DOCUMENTS COMMITTEE Change Order No. 01 Date of Issuance: 03/26/2021 Effective Date: Owner: City of Bozeman Owner's Contract No.: Contractor: Dick Anderson Construction Contractor's Project No.: Engineer: HDR Engineering Engineer's Project No.: 10176456 Project: City of Bozeman WRF Contract Name: Solids Dewatering Building Expansion and Headworks Improvements Project The Contract is modified as follows upon execution of this Change Order: Bid Alternate A includes the installation of a new positive displacement pump, polymer system, and associated piping modifications to allow both the existing and new screw press to operate in parallel. Bid Alternate B includes the installation of a new transverse conveyor in the truck load-out to accommodate solids from the existing and new conveyor s stems. CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIMES [note changes in Milestones if applicable] Original Contract Price: Original Contract Times: Substantial Completion: $ 2,296,033.00 Ready for Final Payment: days or dates Increase from previously approved Change Orders No. Increase from previously approved Change Orders No. to No. to No._ Substantial Completion: $ N/A Ready for Final Payment: days Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion: $2,296,033.00 Ready for Final Payment: days or dates Increase of this Change Order: Increase of this Change Order: Substantial Completion: $ 274,114.00 Ready for Final Payment: days or dates Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: Substantial Completion: $2,570,147.00 Ready for Final Payment: days or dates RECOMMENDED: ACCEPTED: ACCEPTED: By: By: By: Engineer(if required) a Authorized Signature) ontractor(Author' d Signature) Title: Title: MAAa r Title: tZ03 T M h' eC t- Date: Date Date EJCDC°C-941,Change Order. Prepared and published 2013 by the Engineers Joint Contract Documents Committee. Page 1 of 1