HomeMy WebLinkAbout20372 Approval Letter
April 16, 2021
C&H Engineering & Surveying, Inc
Attn: Tim Staub
1091 Stoneridge Dr.,
Bozeman, MT 59718
RE: Swiss Plaza Site Plan, Application 20-372
Dear Applicant,
The Site Plan for the above-referenced project has been approved. A staff report signed by
the Director of Community Development is enclosed for your records.
As the applicant, you must comply with all provisions of the Bozeman Municipal Code,
which are applicable to this project. All unmet code provisions, or code provisions that are
not specifically listed as conditions of approval, does not, in any way, create a waiver or
other relaxation of the lawful requirements of the Bozeman Municipal Code or state law.
Future Impact Fees - Building permit applications will require payment of the required
transportation, water, sewer and fire impact fees according to the City of Bozeman adopted
impact fee schedule in place at the time of building permit issuance. If you desire an
estimate of the required impact fees according to current rates please contact the
Department of Community Development.
Please be informed that ANY changes from the final plan or final building elevations
will need to be reviewed by the Department of Community Development. This Director
of Community Development project decision may be appealed filing a notice of appeal with
the Clerk of the Commission for the City of Bozeman, within ten working days after the date
of approval as evidenced by the Director’s signature, by following the procedures of Section
38.250.030, BMC.
If you have questions, or if the Department of Community Development can be of further
assistance, please do not hesitate to contact me at 582-2261 or jamiller@bozeman.net
Respectfully,
Jacob Miller, Assistant Planner
Department of Community Development
CC: Swiss Detail, Inc. 3004 N. 27th Ave, Bozeman, MT 59718
Enc: Final Staff Report