HomeMy WebLinkAbout08 Written Narrative of Changes 2-17-21Courtyard Hotel by Marriott
Site Plan Resubmittal
Narrative of Changes
APPLICATION DOCUMENTS
Form CUP – Conditional Use Permit – Per city Comments, this document was removed from the
application.
Form SUP – Special Use Permit – Per City Comments, this document was added to the
application.
Project Narrative – Per City Comments, this document was harmonized to be consistent with
the project.
Open Space Calculations – Per City Comments, this document was updated to account for the
increase in size of the north open space area.
Sewer & Water and NWE Utility Easements – Easement exhibits were added to the easement
documents.
CIVIL DRAWINGS
C0.0 SITE PLAN COVER SHEET – Updated the sheet index to reflect which sheets had changes on
this submittal with revision dates. Updated the Open Space and Cash In Lieu of Water Rights
descriptions.
C0.1 GENERAL NOTES – Updated the open space seating table.
C1.0 SITE PLAN - Updated the sheet to revise the northern parking island, extend the northern
patio, and adjust the transformer location.
C1.1 DIMENSION PLAN - Updated the sheet to revise the northern parking island, extend the
northern patio, and adjust the transformer location.
C1.2 GRADING PLAN – The grading along the northern property line was adjusted to not
impede beyond the property line. A small berm was added to the eastern property line to
prevent the ditch runoff from entering the site.
C1.3 DRAINAGE PLAN - Updated the sheet to revise the northern parking island, extend the
northern patio, and adjust the transformer location.
C1.3 CONSTRUCTION MANAGEMENT PLAN - Updated the sheet to revise the northern parking
island, extend the northern patio, and adjust the transformer location.
ARCHITECTURAL DRAWINGS
SP050
Adjusted orientation of transformer and gate layout.
Reduced number of dumpster containters to 1 bin.
Combined patios at open area 4
Adjusted layout of North parking island, removed 2 stalls
Added parking stall near entry to building
Added parking stall near east entry to building
Updated open space calculations table
SP051
Updated dumpster bin quantity
SP052
Added dimension to screening fence detail
SP101
Updated North Patio layout
SP202
Updated north elevation to show transformer, electrical gear, and gas meter
Updated south elevation with added storefront windows
LANDSCAPE DRAWINGS
LS1.1
Landscape areas around patios on north side of the building were updated per new Site
Plan revisions.
Planting clearances around electrical transformer updated to meet standards.
LS2.1
Irrigation in landscape areas around patios on north side of the building were updated
per new Site Plan revisions.
Irrigation changed to Rotary Nozzles in areas as shown.
New nozzle types and rain sensor shown in legend.
Landscape Area Calculations shown.
LS3.1
Added Blank Wall Screening Detail
ELECTRICAL DRAWINGS
EP100
Updated photometric plan to match new light pole location at northeast corner of
building