HomeMy WebLinkAbout00 Cover Letter 2-17-21
G:\MADISON ENGINEERING\PROJECTS\2019\19-119 Marriott-Boothill\Application\Site Plan\Site\Resubmittal 1\RC 1 Cover letter.docx
895 Technology Blvd Suite 203 Bozeman, MT 59718 (406) 586-0262 Fax (406) 586-5740
MADISON
ENGINEERING
February 17, 2021
Jacob Miller
City of Bozeman Planning Department
20 East Olive
Bozeman, MT 59715
RE: Resubmittal #1 of Courtyard Hotel by Marriott, Site Plan Application 20406
Dear Jacob:
On behalf of our client, Bozeman Courtyard Hotel LLC, we are resubmitting the Site Plan application for
review for the proposed Courtyard Hotel by Marriott located 2168 Boothill Court.
This resubmittal provides updated plan sheets and accompanying documents in response to DRC review
comments. Included in our resubmittal package is a fully updated, complete digital application. The
documents included with this resubmittal consist of the following:
Form RC – Revisions & Corrections – New with this Resubmittal
Form A1 & CVA - Development Review Application & COVID Delay Acknowledgement – No
Changes
Form SP – Site Plan Checklist – No Changes
Form CUP – Conditional Use Permit – Removed from the Application per DRC Comments
Form SUP – Special Use Permit – New with this Resubmittal
Form N1 – Noticing Checklist – No Changes
Adjacent Property Owner List – No Changes
Adjacent Property Owner Stamped and Pre-addressed Envelopes (Will be mailed by Madison) –
No Changes
Response to January 2021 DRC Review Comments – New with this Resubmittal
Written Narrative of Changes – New with this Resubmittal
Project Narrative – Updated with this Resubmittal
Special Use Permit Narrative – New with this Resubmittal
Conditional Use Permit Narrative – Removed from the Application per DRC Comments
Response to Conceptual Plan Review Comments – No Changes
Plat J-376 – No Changes
Easement Documents – Updated with this Resubmittal
Open Space Calculations – Updated with this Resubmittal
CIL of Water Rights Calculations & Correspondence – No Changes
Stormwater Design Report, Calculations, and Maintenance Schedule – No Changes
Jacob Miller
February 17, 2021
Project: Courtyard Hotel by Marriott
Page 2 of 2
895 Technology Blvd Suite 203 Bozeman, MT 59718 (406) 586-0262 (406) 586-5740 Fax
Water & Sewer Design Report – No Changes
Construction Stormwater (SWPPP) Permit – No Changes
Geotechnical Report – No Changes
Owner Letter of Certification for Inspection, Certification, and As-Built Drawings – No Changes
Civil, Architectural, Landscape, and Lighting Drawings – Updated with this Resubmittal
No variances or deviations are proposed. Please review the re-submittal at your earliest convenience. If you have any questions or need additional information please feel free to contact us at 586-0262.
Sincerely,
Madison Engineering, Inc.
____________________________________
Mark Juras, PE
cc: Will Ralph, Graf Apartments LLC