Loading...
HomeMy WebLinkAbout00 Cover Letter 2-17-21 G:\MADISON ENGINEERING\PROJECTS\2019\19-119 Marriott-Boothill\Application\Site Plan\Site\Resubmittal 1\RC 1 Cover letter.docx 895 Technology Blvd Suite 203  Bozeman, MT 59718  (406) 586-0262  Fax (406) 586-5740 MADISON ENGINEERING February 17, 2021 Jacob Miller City of Bozeman Planning Department 20 East Olive Bozeman, MT 59715 RE: Resubmittal #1 of Courtyard Hotel by Marriott, Site Plan Application 20406 Dear Jacob: On behalf of our client, Bozeman Courtyard Hotel LLC, we are resubmitting the Site Plan application for review for the proposed Courtyard Hotel by Marriott located 2168 Boothill Court. This resubmittal provides updated plan sheets and accompanying documents in response to DRC review comments. Included in our resubmittal package is a fully updated, complete digital application. The documents included with this resubmittal consist of the following:  Form RC – Revisions & Corrections – New with this Resubmittal  Form A1 & CVA - Development Review Application & COVID Delay Acknowledgement – No Changes  Form SP – Site Plan Checklist – No Changes  Form CUP – Conditional Use Permit – Removed from the Application per DRC Comments  Form SUP – Special Use Permit – New with this Resubmittal  Form N1 – Noticing Checklist – No Changes  Adjacent Property Owner List – No Changes  Adjacent Property Owner Stamped and Pre-addressed Envelopes (Will be mailed by Madison) – No Changes  Response to January 2021 DRC Review Comments – New with this Resubmittal  Written Narrative of Changes – New with this Resubmittal  Project Narrative – Updated with this Resubmittal  Special Use Permit Narrative – New with this Resubmittal  Conditional Use Permit Narrative – Removed from the Application per DRC Comments  Response to Conceptual Plan Review Comments – No Changes  Plat J-376 – No Changes  Easement Documents – Updated with this Resubmittal  Open Space Calculations – Updated with this Resubmittal  CIL of Water Rights Calculations & Correspondence – No Changes  Stormwater Design Report, Calculations, and Maintenance Schedule – No Changes Jacob Miller February 17, 2021 Project: Courtyard Hotel by Marriott Page 2 of 2 895 Technology Blvd Suite 203 Bozeman, MT 59718 (406) 586-0262 (406) 586-5740 Fax  Water & Sewer Design Report – No Changes  Construction Stormwater (SWPPP) Permit – No Changes  Geotechnical Report – No Changes  Owner Letter of Certification for Inspection, Certification, and As-Built Drawings – No Changes  Civil, Architectural, Landscape, and Lighting Drawings – Updated with this Resubmittal No variances or deviations are proposed. Please review the re-submittal at your earliest convenience. If you have any questions or need additional information please feel free to contact us at 586-0262. Sincerely, Madison Engineering, Inc. ____________________________________ Mark Juras, PE cc: Will Ralph, Graf Apartments LLC