HomeMy WebLinkAbout38_AB200_Back Exterior Elevation - Building B_01.13.21B1 B2 B3 B4 B5
LEVEL 1
0.00'
LEVEL 2
10.17'
LEVEL 3
20.33'
LEVEL 4
30.50'
C3
AB-300
C3
AB-300
4"
/
1
2
"
4"
/
1
2
"
4"
/
1
2
"
51
'
-
1
1
1
/
2
"
FC -1FC -2
FC -1
WD -1
WD -1
WD -1
FC -1
WD -1 WD -1
WD -1
WD -1
WD -1
FC -1
FC -2
FC -1
FC -1
WD -1
WD -1
WD -1
WD -1
WD -1WD -1 FC -1
WD -1
WD -1
WD -1
FC -2
C1
AB-300
C1
AB-300
C
C
C
G
G
G
H
H
H
G
G
G
C
C
C C
C
C H
H
H
G
G
G
D
D
D C
C
C
G
G
G
10
'
-
2
"
10
'
-
2
"
10
'
-
2
"
9 " / 1 2 " 9" / 12" 9 " / 1 2 " 9" / 12" 9 " / 1 2 " 9" / 12" 9 " / 1 2 " 9" / 12"
C2
A-513
TYP
D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S.
CONT RIDGE VENT, TYP
GUTTER, TYP
DOWNSPOUT, TYP
GENERAL EXTERIOR ELEVATION NOTES
1. EXHAUST VENTS 3 FT MINIMUM FROM DOORS AND OPERABLE PORTIONS OF WINDOWS.
2. SEE RCP FOR SOFFIT COLORS.
3. SEE CIVIL DRAWINGS AND SITE PLANS FOR GRADING AND GROUND LEVEL ELEVATIONS.
4. ALL SIDING MATERIAL AND COLOR TRANSITIONS OCCUR AT INSIDE CORNERS, UON.
5. TRIM COLOR SHALL APPLY TO FASCIA, COLUMNS, BRACKETS AND HORIZONTAL TRIM, UON.
6. DOWNSPOUT AND GUTTER COLOR TO MATCH ADJACENT SIDING, UON.
7. OUTSIDE CORNER TRIM TO MATCH ADJACENT SIDING COLOR, UON.
8. INSIDE CORNER TRIM TO MATCH ADJACENT SIDING COLOR, UON.
9. SEE DETAIL FOR EXTERIOR LIGHT MOUNTING, TYP.
10. PROVIDE SNOW GUARDS ON SLOPED ROOFS WITH RAIL TYPE AT DOORS AND PEDESTRIAN
WALKWAYS. COORD. WITH ARCHITECT AND MANUFACTURER FOR QUANTITY AND
LOCATION.
11. REFERENCE ELEVATION 0'-0". SEE CIVIL PLANS FOR FINISHED FLOOR ELEVATION AT EACH
BUILDING.
/A2 A-512
BUILDING MATERIAL SCHEMES
SCHEME 1 -POWDER ROAD COLOR PALETTE
SW 7605 -GALE FORCE
SW 9173 -SHIITAKE
CEDAR WOOD ACCENTS WD -1
FIBER CEMENT LAP SIDING FC -1
TRIM & ACCENT FC PANEL FC -2
SCHEME 2 -POWDER ROAD
SW 7004 -SNOWBOUND
SW 2739 -CHARCOAL BLUE
CEDAR WOOD ACCENTS WD -1
FIBER CEMENT LAP SIDING FC -1
TRIM & ACCENT FC PANEL FC -2
SCHEME 3 -THE TRAIL
SW 9184 -FOXHALL GREEN
SW 7635 -PALISADE
CEDAR WOOD ACCENTS WD -1
FIBER CEMENT LAP SIDING FC -1
TRIM & ACCENT FC PANEL FC -2
SHINGLES
COLOR PALETTE COLOR PALETTE
TruDefinition DURATION -ONYX BLACK
A
B
C
D
A
B
C
D
1 2 3 4 5
1 2 3 4 5
COPYRIGHT GGLO. ALL RIGHTS RESERVED.
ORIGINAL SHEET SIZE IS 24"x36"
SHEET NO.
SHEET TITLE
GGLO PROJECT MANAGER:
GGLO PRINCIPAL IN CHARGE:
PROJECT NO.:
OWNER APPROVAL:
MARK DATE DESCRIPTION
ISSUE INFORMATION
REVISIONS
PROJECT:
OWNER:
PROJECT ADDRESS:
PL
O
T
D
A
T
E
/
T
I
M
E
:
A 01.13.2021 FORMAL SITE PLAN SUBMITTAL
THIS IS AN IN-DESIGN PROGRESS SET FOR
COORDINATION OF DESIGN INTENT. IT DOES NOT
REPRESENT FINAL DOCUMENTS OR EXTENT OF
CONSTRUCTION REQUIREMENTS
1/1
2
/
2
0
2
1
3
:
0
7
:
3
0
P
M
CONNIE ST. GEORGE
TOM SHELDON
2019111.01
COTTONWOOD SUBDIVISION
5500 S COTTONWOOD RD
BOZEMAN, MT 59718
AB-200
BACK EXTERIOR
ELEVATION -BUILDING
B
THE COTTONWOOD
PROJECT
COTTONWOOD PROJECT LLC
3112 LOS FELIZ BLVD
LOS ANGELES CA 90039
1/8" = 1'-0" C1 BACK ELEVATION - BUILDING B
1/8" = 1'-0" A1 BACK ELEVATION RENDERED - BUILDING B 0'4'8'16'
EXTERIOR LIGHT LOCATION.
NOT ALL LIGHT LOCATIONS SHOWN IN
ELEVATION WILL BE USED.
REFER TO ELECTRICAL SITE PLAN
FOR QUANTITY AND LOCATION
AT EACH BUILDING.
KEY PLAN -PACKAGE D
13 14
MARK DATE DESCRIPTION
1 12.23.2020 FORMAL SITE PLAN RESUBMITTAL