HomeMy WebLinkAbout41_AA-201_FRONT_SIDE 2 EXTERIOR ELEVATIONS -BUILDING A_11.04.2020GENERAL EXTERIOR ELEVATION NOTES
1. EXHAUST VENTS 3 FT MINIMUM FROM DOORS AND OPERABLE PORTIONS OF WINDOWS.
2. SEE RCP FOR SOFFIT COLORS.
3. SEE CIVIL DRAWINGS AND SITE PLANS FOR GRADING AND GROUND LEVEL ELEVATIONS.
4. ALL SIDING MATERIAL AND COLOR TRANSITIONS OCCUR AT INSIDE CORNERS, UON.
5. TRIM COLOR SHALL APPLY TO FASCIA, COLUMNS, BRACKETS AND HORIZONTAL TRIM, UON.
6. DOWNSPOUT AND GUTTER COLOR TO MATCH ADJACENT SIDING, UON.
7. OUTSIDE CORNER TRIM TO MATCH ADJACENT SIDING COLOR, UON.
8. INSIDE CORNER TRIM TO MATCH ADJACENT SIDING COLOR, UON.
9. SEE DETAIL FOR EXTERIOR LIGHT MOUNTING, TYP. /A1 A-512
AB AA AC AD
LEVEL 1
0.00'
LEVEL 2
10.17'
LEVEL 3
20.33'
TOP OF PLATE
29.33'
A3
AA-300
A3
AA-300
9'
-
0
"
10
'
-
2
"
10
'
-
2
"
41
'
-
9
"
DOWNSPOUT, TYP
GUTTER, TYP
260SF / 1645SF = 15.8% TRANSPARENCY
9:1
2
FC -1 FC -1FC -1
DD
D D
K B B
D
D D
D
K
TW
TW
A1 A4 A3 A2
LEVEL 1
0.00'
LEVEL 2
10.17'
LEVEL 3
20.33'
TOP OF PLATE
29.33'
B3
AA-300
B3
AA-300
10
'
-
2
"
10
'
-
2
"
9'
-
0
"
41
'
-
9
"
CONTINUOUS
ROOF VENT, TYP
GUTTER, TYP
DOWNSPOUT,
TYP
TW
TW
TW
9 :1 2
363SF / 1777SF = 20.4% TRANSPARENCY
9:12
4:1
2
9 :1 2 9:12
FC -1
FC -2
FC -1
WD -1
WD -1
WD -1
WD -1
WD -1 WD -1
WD -1
WD -1
IG
CH
CHG
G
GG
G
G
H
H
C H
C H
I G
FC -1 FC -1FC -1FC -1
EXTERIOR LIGHT LOCATION.
NOT ALL LIGHT LOCATIONS SHOWN IN
ELEVATION WILL BE USED.
REFER TO ELECTRICAL SITE PLAN
FOR QUANTITY AND LOCATION
AT EACH BUILDING.
BUILDING MATERIAL SCHEMES
SCHEME 1 -POWDER ROAD COLOR PALETTE
SW 7605 -GALE FORCE
SW 9173 -SHIITAKE
CEDAR WOOD ACCENTS WD -1
FIBER CEMENT LAP SIDING FC -1
TRIM & ACCENT FC PANEL FC -2
SCHEME 2 -POWDER ROAD
SW 7004 -SNOWBOUND
SW 2739 -CHARCOAL BLUE
CEDAR WOOD ACCENTS WD -1
FIBER CEMENT LAP SIDING FC -1
TRIM & ACCENT FC PANEL FC -2
SCHEME 3 -THE TRAIL
SW 9184 -FOXHALL GREEN
SW 7635 -PALISADE
CEDAR WOOD ACCENTS WD -1
FIBER CEMENT LAP SIDING FC -1
TRIM & ACCENT FC PANEL FC -2
SHINGLES
COLOR PALETTE COLOR PALETTE
TruDefinition DURATION -ONYX BLACK
A
B
C
D
A
B
C
D
1 2 3 4 5
1 2 3 4 5
COPYRIGHT GGLO. ALL RIGHTS RESERVED.
ORIGINAL SHEET SIZE IS 24"x36"
SHEET NO.
SHEET TITLE
GGLO PROJECT MANAGER:
GGLO PRINCIPAL IN CHARGE:
PROJECT NO.:
OWNER APPROVAL:
MARK DATE DESCRIPTION
ISSUE INFORMATION
REVISIONS
PROJECT:
OWNER:
PROJECT ADDRESS:
PL
O
T
D
A
T
E
/
T
I
M
E
:
A 11.04.2020 FORMAL SITE PLAN SUBMITTAL
1301 First Avenue, Suite 301
Seattle, WA 98101
http://www.gglo.com
11
/
4
/
2
0
2
0
1
0
:
2
9
:
5
1
A
M
CONNIE ST. GEORGE
TOM SHELDON
2019111.01
COTTONWOOD SUBDIVISION
5500 S COTTONWOOD RD
BOZEMAN, MT 59718
AA-201
FRONT/SIDE 2 EXTERIOR
ELEVATIONS -BUILDING
A
THE COTTONWOOD
PROJECT
COTTONWOOD PROJECT LLC
3112 LOS FELIZ BLVD
LOS ANGELES CA 90039
1/8" = 1'-0" B1 SIDE ELEVATION 2 - BUILDING A
1/8" = 1'-0" B3 FRONT ELEVATION - BUILDING A
1/8" = 1'-0" A1 SIDE ELEVATION 2 RENDERED - BUILDING A
1/8" = 1'-0" A3 FRONT ELEVATION RENDERED - BUILDING A
4
7
1
KEY PLAN -PACKAGE A
6
5
3
2
MARK DATE DESCRIPTION