Loading...
HomeMy WebLinkAboutRC narrative_01_18_21January 08, 2020 Phillipe Gonzalez Historic Preservation Specialist City of Bozeman Planning Department Revision and Correction Form Narrative Hello, This revision includes a lot merger agreement to resolve the issue of the proposed building straddling the lot line between lot 6 & lot 7. We have altered the design slightly to set the garage wall back from the front porch wall 4’ instead of 3’ on the street facade of the proposed home. The east elevation has been noted to describe the 8’ win garage door in relation to the 26’ aid facade, also to fit within the recommendations described in  Section38.350.070. Thanks you for your time Craig Bergstedt ation a r c h i t e c t u r e, i n c. 406.284.4476PO Box 762 Manhattan, Montana 59741 formationarchitecture.com Craig Bergstedt, AIA form