Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A3.1Elevations_03032021
LEVEL 1 100' -0" (E) T.O. PARAPET 115' -6 5/16" T.O. ROOF DECK 116' -8" T.O. SHADE STRUCTURE 126' -8" 1 EXISTING STEEL COLUMNS (TYP.) NEW STEEL STRUCTURE (TYP.) NEW CORRUGATED METAL ROOF (TYP.) LEVEL 1 100' -0" (E) T.O. PARAPET 115' -6 5/16" T.O. ROOF DECK 116' -8" PREFINISHED METAL GUTTER & DOWNSPOUT (TYP.) T.O. SHADE STRUCTURE 126' -8" EXISTING STEEL COLUMNS (TYP.) NEW STEEL STRUCTURE (TYP.) 1 NEW CORRUGATED METAL ROOF (TYP.) NEW STEEL COLUMN TO MATCH EXISTING LEVEL 1 100' -0" (E) T.O. PARAPET 115' -6 5/16" T.O. ROOF DECK 116' -8" T.O. SHADE STRUCTURE 126' -8" 1EXISTING STEEL COLUMNS (TYP.) NEW STEEL STRUCTURE (TYP.) NEW CORRUGATED METAL ROOF (TYP.) s h e e t p r o j e c t c o d e a d d r e s s © 2 0 2 1 I N T R I N S I K re v i s i o n s DRAWINGS FOR PLANNING REVIEW ONLY 11 1 N o r t h T r a c y A v e . B o z e m a n , M o n t a n a 5 9 7 1 5 F a x : 4 0 6 . 5 82 . 8 9 1 1 Ph : 4 0 6 . 5 8 2 . 8 9 8 8 Y: \ P r o j e c t s \ B T F \ D R A W I N G S \ R E V I T \ B T F - S I T E P L A N M O D . rv t A3.1 BTF BOZEMAN TAP & FILL ELEVATIONS 101 N. ROUSE AVE. BOZEMAN, MT 59715 SP MOD 03.03.2021 1/4" = 1'-0" A3.1 2 EAST ELEVATION 1/4" = 1'-0" A3.1 1 SOUTH ELEVATION 1/4" = 1'-0" A3.1 3 NORTH ELEVATION N o . D e s c r i p t i o n D a t e 1 S I T E P L AN M O D 03 - 0 3 - 2 0 2 1 NEW STEEL COLUMN TO MATCH EXISTING