HomeMy WebLinkAbout19 - Design Report - West Peach Condos - Road, Stormwater _I
MAR 2 6 In
1019
ENGINEERING DEPARTP4QT
NORTH 3RD AVENUE
ROAD AND STORMWATER
DESIGN REPORT
FOR:
WEST PEACH CONDOMINIUM
BOZEMAN, MT
Prepared By:
MADISON
ENGINEERING
Madison Engineering
895 Technology Drive, Suite 203
Bozeman, MT 59718
(406) 586-0262
MARCH 2O19
NORTH 3" AVENUE
ROAD AND STORMWATER
DESIGN REPORT
FOR:
WEST PEACH CONDOMINIUM
BOZEMAN, MT
CHIRIS G
BUDESK
T f�o. 10 z5 PE w
� . . ::. , g
NN
Madison Engineering
895 Technology Blvd Ste 203
Bozeman, MT 59718
(406) 586-0262
MARCH 2O19
NORTH 3RD AVENUE IMPROVEMENTS
ROAD & STORMWATER DESIGN REPORT
A. Introduction
This design report will give an overview of the road design and stormwater management plan for
the proposed improvements to N. 3rd Avenue from the intersection of West Peach north
approximately 180 feet. The Right of Way (ROW) is currently constructed with a 29.5-foot wide
asphalt road with no curb and gutter. The existing road centerline is misaligned in the ROW
approximately 7 feet east of the ROW centerline. The proposed improvements include removing
the existing asphalt road and widening the road to current standards for a local street with the
new centerline of the road matching the existing ROW centerline. A 5-foot wide sidewalk is
proposed on the west side of the street. Retention/detention of stormwater is not proposed within
the ROW.
B. Road Design
N. 3rd Avenue is considered a local street and is proposed to be constructed 35-feet wide (top
back of curb to top back of curb). Two drive approaches will be constructed; one 24-foot wide
drive approach to access the proposed West Peach Condominium on the west side of the street
and one 17.5-foot wide approach to access an existing property on the east side of the street. For
information regarding the pavement design see the Pavement Design Report by C&H
Engineering & Surveying dated March 2019 attached with this submittal.
Due to the misalignment of the original roadway centerline by approximately 7 feet to the east,
the proposed road will need to taper back to meet the existing roadway to the north beyond the
extent of this project. A taper length of 36.5 feet was calculated using information given in
Tables 6C-3 and 6C-4 of Chapter 6C of the MUTCD 2009 Edition (see Appendix F). However,
this was deemed unsatisfactory after initial review by the City of Bozeman. It was required that
the Bozeman Design Standards and Specifications Policy (DSSP) be used in calculating taper
length. This doubles the length of the taper because the Bozeman DSSP does not differentiate
between the different types of tapers and classifies all tapers conservatively as merging tapers.
The taper length shown on the updated plans is 73.0 feet.
C. Description of existing conditions
Currently the subject portion of N. 3rd Avenue ROW is paved and has shallow drainage ditches
running north along the east and west sides of the road. The soil in these ditches is compacted
more than a typical swale or landscaped area due to the historical use of these areas as street
parking.
N. 3'Ave. Improvements
Road&Stormwater Design Report
Page I of 2
.r r
✓s,,
Figure 1 Looking north on N. 3rd Ave. Cars parked alongside the road is typical.
D. Determining Rational Method C Value
In determining a proper Rational Method C coefficient for this "landscaped" area within the
existing ROW, an additional resource was used due to the lack of specificity given in Table I-1
of the Bozeman Design Standards and Specifications. The California State Water Resource
Control Board Fact Sheet 5.1.3 (see Appendix C) was used as guidance for determining a proper
C value that best represents the conditions on site. For smooth, bare packed soil a range of C
values from 0.3 to 0.6 were given. An average value of 0.45 was chosen for the existing
condition ROW ditches and is referred to as "Pervious, compacted dirt" in the calculations in
Appendix A.
E. Summary
The difference between the proposed and existing conditions composite C values is only 0.03.
The resulting difference in runoff volumes between proposed and existing conditions is only 18
cubic feet for the 10-year, 2-hour storm (see Appendix B). Given the approximate nature of the
Rational Method and relatively small area of this project a difference in runoff volume of 18
cubic feet between proposed and existing conditions is considered negligible. Therefore, no
stormwater improvements are proposed for this project.
Appendices
A. Composite C Value calculations
B. Runoff calculations
C. Runoff Coefficient Fact Sheet
D. Sheet SDI.0—Drainage Areas exhibit
E. Roadway taper calculations
N. 3'Ave. Improvements
Road&Stormwater Design Report
Page 2 of 2
Appendices
Appendix A
N. 3rd St. Improvements
N. 3rd Ave (Existing)
Surface Area (ft) C
Pervious, compacted dirt 5290 0.45
Paved (road, NO sidewalk) 5581 0.9
Total 10871 0.68
N. 3rd Ave (Proposed)
Surface Area (ft) C
Landscaped 2973 0.2
Paved (road &sidewalk) 7898 0.9
Total 10871 0.71
N.3rd St. Improvements Appendix B
Runoff calculations
Design Rainfall Freq.
OF coefficient a 0.64
OF coefficient b
OF coefficient n 0.65
Pre-development Conditions
Area(ft): Exfg ROW 10,871 sq.ft.
total area: 0.25 acres
composite C: 0.68
Runoff volume calculations:
Q=CIA
C= 0.68 (pre-development)
1= 0.41 in/hr(10-yr,2-hr storm)
A= 0.25 acres
Qpost= 0.070 cfs
Runoff volume(ft)= 502 ft3 (10 yr,2-hr storm)
Post-development Conditions
Area(fe): Prop'd ROW 10,871 sq.ft.
total area: 0.25 acres
composite C: 0.71
Runoff volume calculations:
Q=CIA
C= 0.71 (post-development)
1= 0.41 in/hr(10-yr,2-hr storm)
A= 0.25 acres
Qpost= 0.072 cfs
Runoff volume(ft)= 519 ft3 (10-yr,2-hr storm)
Proposed(ft') Existing(ft')l DDifference
b19 buz 13 q
Summary
Because the difference in runoff volume for the 10-yr,2-hr storm is only 18 cubic feet no stormwater facilities are proposed.
Given the approximate nature of the Rational Method,a difference in runoff volume of 18 cubic feet is considered negligible.
Fact Sheet-5.1.3
Runoff Coefficient (C) Fact Sheet
What is It'?
The runoff coefficient (C) is a dimensionless coefficient relating the amount of runoff to the
amount of precipitation received. It is a larger value for areas with low infiltration and high
runoff (pavement, steep gradient), and lower for permeable, well vegetated areas (forest, flat
land).
Why is It Important?
It is important for flood control channel construction and for possible flood zone hazard
delineation. A high runoff coefficient(C) value may indicate flash flooding areas during storms
as water moves fast overland on its way to a river channel or a valley floor.
It is measured by determining the soil type, gradient, permeability and land use. The values are
taken from the table below. The larger values correspond to higher runoff and lower infiltration.
Land Use C Land Use I C
Lawns:
Sandy soil, flat, 2% 0.05 -0.10
Business: Sandy soil,avg., 2-7% 0.10-0.15
Downtown areas 0.70 -0.95 Sandy soil, steep, 7% 0.15 -0.20
Neighborhood areas 0.50-0.70 Heavy soil, flat,2% 0.13 -0.17
Heavy soil,avg.,2-7% 0.18 -0.22
Heavy soil, steep, 7% 0.25 -0.35
Agricultural land:
Bare packed soil
I *Smooth 0.30-0.60
*Rough 0.20-0.50
Residential. Cultivated rows
Single-family areas 0.30-0.50 *Heavy soil,no crop 0.30- 0.60 I
Multi units, detached 0.40 - 0.60 *Heavy soil,with crop 0.20-0.50
Munti units, attached 0.60-0.75 *Sandy soil,no crop 0.20-0.40
Suburban 0.25 -0.40 *Sandy soil, with crop 0.10-0.25
Pasture
*Heavy soil 0.15-0.45
*Sandy soil 0.05 -0.25
Woodlands 0.05 -0.25
The Clean Water Team Guidance Compendium for Watershed Monitoring and Assessment 1
State Water Resources Control Board 5.1.3 FS-(RC)2011
EXISTING CONDITION PROPOSED CONDITION
COVER TYPE AREA (SQ. FT) COVER TYPE AREA (SQ. FT)
PERVIOUS, COMPACTED SOIL 5290 LANDSCAPE 2973
PAVED (ROAD & SIDEWALK) 5581 PAVED (ROAD & SIDEWALK) 7898
I i Y.-, _.
IY
} STORMWATER FLOWS
FROM NEW ROAD
�>— INTO EXT'G DITCH <>—<>—
EXT'G EOP �:
=' PROP.
ASPHALT
;TAPER
EXT'G ROW
� I
EXT'G ROW
Y
r
�9
T
T PROP.
TBC
EXT'G EOP I b
ZEXT'G DITCH I
I a
a SCALE
C- ,
0 15 30
a
PEACH STREET I inch= 30' PEACH STREET
WEST PEACH CONDOMINIUM SDI.®
N.3rd Avenue
N. 3RD .AVENUE IMPROVEMENTS MADISON ENGINEERING Drainage Areas
895 TECHNOLOGY BLVD SUITE 203 PROJECT ht 17-147
STORM WATER DRAINAGE EXHIBIT BOZEMAN,MT 59718 DATE: 03/26/19
(406)586-0262 DRAWN BY: MS
DRAINAGE AREAS REVIEWED BY: CGS
BOZEIOItp,N,MT PROJECT ENGINEER:CGB
tet'V DESIGNED BY: COB
ROojwtj TAp-er CcA',,(A,fa I I19yi s � 1v, ��d Avuvl(�[�
( fur 5 C� l r v+�i f S i fi l�tGt/f'! A L .
_ y ) F ���c�T P
w5 160
„Jk.e�Q=
lN= w.c1-f� � �•�ls�
.z
U
T rfi:v� Tu
w� �uVIP-
�- 7 / ci,�rrt'il�f Gob t7 s S-e4— cc�- 5
P
�S ✓�of a��vrt/ �T.— a-
plei
rQ,dl vtp
7ps
i
�LFMAR 2 6 201 1
ENGIi�!EERING DEPARTMEN
PAVEMENT DESIGN REPORT
NORTH 3" AVENUE
Prepared for:
IRONWOOD DEVELOPMENT, INC.
E-mail: j@ironwoodd.com
Prepared by:
Engineering and Surveying Inc.
1091 Stoneridge Drive • Bozeman, MT 59718
Phone(406] 587-1115 • Fax(406) 587-9768
www.chengineers.com • info@)chengineers.com
!3�'r �i' `ct off:•
Project Number: 180792 ,tip` s G r r
L
March 2019
i
PAVEMENT DESIGN REPORT—NORTH 3 RD AVENUE WIDENING
A total of two test holes were excavated along the north side of North 3 d Avenue using a tracked
excavator on March 8, 2019. The subsurface soils consisted of approximately 29 to 30 inches of
undocumented fill (mix of clay, gravel, sand, concrete, metal and woody debris) underlain by a
layer of sandy lean clay (CL). Poorly graded gravel with sand and cobbles (GP) followed the
sandy lean clay to the end of each exploratory excavation. Groundwater was not encountered
within the depth of exploration. Penetration tests were performed with a static cone penetrometer
on the sandy lean clay to estimate its California Bearing Ratio (CBR). The estimated CBR is
obtained by the equation Q� = 3.3(CBR), or CBR= Qc/3.3, with Qc being the cone index. With
the average measured value of the cone index being 15,we calculate the estimated as CBR= 15/3.3
= 4.54. A conservative value for the CBR of 2 was used for this report to provide for possible
inconsistencies in the road subgrade, and the approximate testing methods used. The Standard
Test Method for CBR (California Bearing Ratio) of Soils in-situ, based on ASTM Designation D
4429-4, requires complex and specialized equipment,the expense of which, in our opinion, is not
warranted for this small street widening project.
STREET DESIGN
Criteria for design: Bozeman Municipal Code, Section 38.24.060 and City of Bozeman Design
Standards and Specifications Policy, Addendum No. 4, Section IV.G: pavement thickness design
will be based on the current AASHTO Guide for Design of Pavement Structures, or the current
Asphalt Institute Manual Series No.I (MS-I). The design shall be based on a minimum 20-year
performance period traffic volume, with the minimum design lane based on a minimum of 50,000
ESAL.
According to the penetration tests performed by C&H Engineering Inc. on the sandy lean clay,
the CBR assigned to the road subgrade is 2.0.
CBR can be related to the subgrade Resilient Modulus MR by the following:
(Sec. 3.5.4, Highway Engineering Handbook, McGraw Hill, 1996)
Subgrade Resilient Modulus MR(psi):
MR= 1,500 CBR (Shell Oil Co.) This value used by Asphalt Institute.
MR= 5,409 CBR0-"i (United States Army Waterway Experiment Station)
MR=2,550 CBRo.64 (Transport&Research Laboratory, England)
With CBR=2.0
MR= 1,500 CBR= 1,500 (2.0) =3,000 psi
MR= 5,409 CBR0-"' =5,409 (2.0)"" = 8,854.2 psi
MR=2,550 CBR0-64=2,550 (2.0)0-64 =3,973.74 psi
Use most conservative value =3,000 psi
USING THE AASHTO METHOD OF FLEXIBLE PAVEMENT DESIGN
The AASHTO method utilizes a value known as the Structural Number (SN) which relates the
below variables to the wear surface, base, and sub-base depths.
Structural Number Equation (EQ 1):
tog APSI
log W18 = ZRSo +9.36[log(SN + 1)) — 0.20 + 2.7 1094 + 2.32 log MR — 8.07
0.40+ (SN + 1)5.19
Variables:
1. ESAL (Wig) = 50,000
2. Level of Reliability (ZR) = -1.282 for Local Streets based on 90% reliability from Part 1,
Table 4.1, and Part II, Table 2.2, AASHTO Guide.
Level of reliability is based on the cumulative percent of probability of reliability with a
standard normal distribution.
3. Standard Deviation (So) =0.49 for flexible pavements.
See Part I, Sec. 4.3, AASHTO Guide. The standard deviation is the statistical error in the
estimates for future values within the formula. Typical values range from 0.40-0.50 for
flexible pavements, with a value of 0.49 used to ensure a conservative solution.
4. Serviceability Loss (APSI) =2.2 for Local Streets.
The designed allowable deterioration of the roadway is represented by the serviceability
loss. A new road is usually assigned a serviceability index of 4.2 and the final index is
based on the type of roadway. Local streets are normally allowed to deteriorate to 2.0. The
resulting difference in the initial to final indexes is the total serviceability loss.
5. Soil Resistance Modulus (MR) = 3,000 psi
Solution: using (EQ 1), the SN for Local Streets=2.98
Pavement Design Equation (EQ2):
SN = a1D1 + a2D2M2 d a3D3M3�
1. Layer Coefficients: al = 0.44 (Hot-mix asphalt concrete)
a2 = 0.14 (Base Course- 1 '/2" minus crushed gravel)
a3 = 0.11 (Sub-base Course - 6" minus crushed stone)
2. Drainage Coefficients: m2= 1.00 (good drainage 5-25%)
m3 = 1.00 (good drainage>25%)
%of time base & sub-base will approach saturation
3. Layer Depth Assumptions: Di =3" for Local Streets
D2= 6" for Local Streets
Solution: using the values given for Di and D2, and solving (EQ2), D3 =7.49" for Local Streets
Based on our analysis, we recommend the following minimum pavement cross section:
Asphalt Section=3 Inches
Base Course=6 Inches
Sub-Base Course= 9 Inches
However,please note that undocumented fill was encountered in both exploratory excavations and
will need to be removed from beneath the area where the street will be widened, likely resulting
in a much thicker Sub-Base Course than the minimum recommended. The Sub-Base Course shall
be thickened as necessary and shall not be less than the minimum recommended above. Also, a
woven geotextile (such as a Mirafi 50OX) shall be installed across the native subgrade prior to the
placement and compaction of the Sub-Base Course.
N. 3" Avenue Improvements for West Peach Condominium _
Response to Review Comments from Griffin Nielsen dated March =2;9J 11 H\U/
l
MAR 2 6 2019
Pavement Design Report: ENGINEERING DLPAPTrfEj
1. The pavement design report does not meet the requirements City of Bozeman Design Standard and
Specifications (DSSP) section IV.G. The provided report does not demonstrate that City's
performance period traffic loading and minimum loading were considered with the recommended
section. In addition the assumed soil conditions must be verified prior to approved of the pavement
design.
Response: See Pavement Design Report by C&H Engineering & Surveying dated March 2019.
2. The pavement design report does not identify a specification for the recommend woven geotextile,
however Detail 2 on Sheet C3.0 reference the design report for clarification. DSSP I.F.1. The
specified geotextile must be identified.
Response: The C&H Pavement Design Report recommends a woven geotextile such as Mirafi
50OX which is now called out on Detail 2/C2.0.
Plans:
3. Flowable backfill is required in lieu of native backfill within the Peach Street right-of-way, per the
City of Bozeman Modifications to the Montana Public Works Standard Specification Detail
No02221. Detail 5 on Sheet C6.0 should be updated to include this requirement and the reference
to Thomas Drive removed.
Response: Detail 5 has been updated per these comments.
4. Sheet C3.0: The taper length of the transition from the proposed to exist North 3rd Ave street
section should be calculated based on DSSP Section IV.7.
Response: Per conversation with Griffin Nielsen on March 14, 2019 the use of the MUTCD to
calculate taper length is not allowed at this time. The City of Bozeman Engineering
Department will address the issue of the difference in taper length calculations between
Bozeman DSSP and the MUTCD at their meeting at the end of March 2019. If they decide
at the meeting that the use of MUTCD to calculate taper length is permissible, then the
plans will be allowed to change back to the half length (36.5-foot taper) but for now it must
be shown at full length (73-foot taper). The plans have been updated with this change.
5. Sheet C3.0: The east boulevard of North 3rd Ave must be sloped at 2.0% towards to the curb and
gutter. The boulevard may be considered half the 11.5 width.
Response: Detail 2/C3.0 has been changed per this comment.
6. Sheet C3.0: identify the right-of-way/property line for the lot(s) to the northeast the improved
section of North 3rd Ave.
Response: The right of way and adjacent property lines in the northeast of the improvement
section are now shown on Sheet C3.0.
7. Sheet C3.0: The improved section of North 3rd Avenue, including sidewalk, must extend to the
northern boundary of the northern alley.
Response: Sheet C3.0 has been changed per this comment.
8. Sheet C3.0 and C6.0 Detail 3: A City standard drive approach must be installed at the existing
eastern residential drive access. Use the City standard detail No. 02529-11.
Response: Per conversation with Griffin Nielsen on March 14, 2019 the main issue here is the
lack of sidewalk shown on the drawings. A 5-foot wide sidewalk is now shown on the plan
Sheet C3.0 and Detail 3/C6.0. However, due to the existing low elevation of the eastern
adjacent lots, the typical approach grades are not used and the customized, shallower
approach grades previously submitted are still used. These shallower approach grades will
create a softer approach to the existing residence and will lessen the extent of necessary re-
grading onto the individual's property.
9. Sheet C3.0 and C6.0 Detail 1: A City standard drive approach must be installed for the proposed
commercial drive access. Use the City standard detail No. 02529-12.
Response: The site plan for West Peach Condominium utilized this drop-down approach
because of grading concerns on site. Given the designed foundation elevations of the
proposed structures and their adjacency to the access road through the site, a typical
commercial drive access approach would create an abrupt grade break as the road slopes
back down into the site after making the connection to N. 3'd Ave. The modified approach
allows for a much smoother entrance to the site. Additionally, The West Peach
Condominium site plan has been reviewed multiple times and is approved at the time of
this writing. These infrastructure plans are showing the drop-down style approach that was
previously approved with West Peach Condos and it remains the same in this re-submittal.
10. Sheet C4.0: The blowoff should be located in the boulevard outside of the traveled way.
Response: The blowoff is now shown located in the boulevard.
11. Sheet C3.0 and Sheet C4.0: The proposed valve access road alignment STA 0+19 is shown at
two different locations between Sheet C3.0 and C4.0. The plans must be updated.
Response: The valve location has been updated and is the same between Sheets C3.0 and C4.0.
12. Sheet E-3: The detail does not meet City standards, please use the City of Bozeman Typical
Lighting Control Center Metered Pedestal Standard Detail—Figure 8 found within the Design
Standard and Specifications Policy Manual.
Response: This detail sheet (E-3) has been removed entirely. Now the lighting plan set only
includes three sheets instead of four. The single lighting service assembly is called out in
plan view on Sheet E-1 "Per City of Bozeman Standard Drawing Figure 8".
Condition of Approval:
13. The street cuts should be laid out to minimize the number of joints within the traveled way
(perpendicular to the vehicle wheel path). The street cuts in Peach Street for the water main
connection and abandonment of the water service must be coordinated with the City Engineering
Department (Griffin Nielsen and Kellen Gamradt).
Response: Per discussion with Griffin Nielsen on March 14, 2019 street cuts will be
coordinated during the pre-construction meeting. No changes to street cuts have been made
on the plans for this re-submittal.