Loading...
HomeMy WebLinkAbout19 - Traffic Impact Study - Cottonwood SubdivisionCottonwood Subdivision Preliminary Plat Application Roads, Streets, and Alleys Included in this section is a 2018 Traffic Impact Study for Cottonwood Subdivision by Marvin & Associates. Please note that throughout the report “West Garfield Street” is referred to as “Club House Lane”. Streamline does not serve the project area currently. However, a discussion has started between the project owners, Madison Engineering and HRDC Board Chair, David Kack, regarding a potential stop on Cottonwood Road that would serve this part of town. Please see the responses below to the items requested in Section 38.220.060 – Additional Subdivision Preliminary Plat Supplements in the Bozeman Municipal Code: a. Description. Describe any proposed new public or private streets, roads or alley, or substantial improvements of existing public or private streets, roads or alleys. The developer must demonstrate that the land to be subdivided has access onto a legal street. Response: Access will be provided to the subdivision from two intersections with Cottonwood Road; West Garfield Street and Loyal Drive. Cottonwood Road is being widened along the entire western border of the subject parcel (from Town Pump south to the Farmers Canal crossing) and infrastructure improvements for that project have been approved. Construction has begun in summer 2019. West Garfield is a collector and will have a 90-foot wide Right of Way (ROW). All other streets within the subdivision will be local streets with 60-foot wide ROWs. Upon acceptance of road improvements, these roads will be maintained by the City of Bozeman. Where Stafford Avenue terminates at the north property line requires further explanation. A 40- foot wide roadway easement is being obtained along the west side of the east property line of the adjacent lot to the north owned by Major Brands Distributing Co. Inc. (Town Pump). It is understood that the future development of the Town Pump property will require the construction of a partial street section for Stafford Avenue within said easement to continue from the Cottonwood Subdivision north to Huffine Lane to tie into the existing approach for the Town Pump. The adjacent property owner to the east of Town Pump has indicated that they are not interested in providing a roadway easement for Stafford Avenue on their property at this time. It is proposed to build the full Stafford Avenue road section with Cottonwood Subdivision and for 99.27 linear feet within said 40-foot roadway easement to our northern-most property line. The transition between the full 60-foot ROW for Stafford Avenue to the 40-foot ROW on Town Pump’s property is clarified with three drawings attached to this section. The first drawing, Figure A, shows the two proposed road sections for Stafford Avenue; the future partial section to be constructed on Town Pump’s property and the full road section to be constructed on the Cottonwood Subdivision and within the 40-foot easement for 99.27 linear feet. The second drawing, Figure B, shows the area of the transition from 60-foot ROW to 40-foot ROW in plan Cottonwood Subdivision Preliminary Plat Application view. The third drawing is a preliminary easement exhibit showing the 40-foot Public Roadway Easement to be obtained on the Town Pump property. b. Access to arterial. Discuss whether any of the individual lots or tracts have access directly to arterial streets or roads, and if so, the reason access was not provided by means of a street within the subdivision and how the access complies with section 38.400.090. Response: Cottonwood Road is a Principal Arterial and none of the proposed lots have direct access to it. Access to Cottonwood Road will be achieved through the intersections of W. Garfield Street and Loyal Drive. c. Modification of existing streets, roads or alleys. Explain any proposed closure or modification of existing streets, roads or alleys. Response: The only proposed modification to an existing street is the widening of Cottonwood Road as previously mentioned. The improvements to Cottonwood Road are a separate project that has been approved by the MDT and City and will be starting construction in summer 2019. All other roads constructed within this subdivision will be contained on the subject property and will not cause road closures for any existing streets. d. Dust. Describe provisions considered for dust control on alleys. Response: If alleys are constructed on site they will be paved, which will mitigate any potential problems associated with dust. e. Pollution and erosion. Explain how street, road and alley maintenance will be provided to meet the department of environmental quality guidelines for prevention of water pollution and erosion. Response: The roads will be dedicated to the City and will be maintained like the rest of the roads in the City. The boulevards and other disturbed areas will be seeded and stabilized, which is a best management practiced outlined by the MDEQ as a means to reduce pollution and erosion control, and reducing sediment from running into the roads and inlets. Temporary erosion control will also be provided at the dead ends of streets between phases of construction. f. Traffic generation. Discuss how much daily traffic will be generated on existing local and neighborhood streets, roads and alleys, when the subdivision is fully developed, and provide the following information: 1. The report format must be as follows: a. Trip generation, using the Institute of Transportation Engineers Trip Generation Manual; Cottonwood Subdivision Preliminary Plat Application b. Trip distribution; c. Traffic assignment; d. Capacity analysis; e. Evaluation; and f. Recommended access plan, including access points, modifications and any mitigation techniques. 2. The report must include the following information: a. Land use and trip generation in the form of a table of each type of land use, the number of units or square footage, as appropriate, the trip rates used (daily and peak) and resulting trip generation. b. Traffic graphics, which show: i. A.M. peak hour site traffic; ii. P.M. peak hour site traffic; iii. A.M. peak hour total traffic; iv. P.M. peak hour total traffic; and v. Total daily traffic (with site-generated traffic shown separately). c. A.M. and P.M. capacity analysis with an A.M. and P.M. peak-hour capacity analysis provided for: i. All major drive accesses that intersect collector or arterial streets or roads; and ii. All arterial-arterial, collector-collector and arterial-collector intersections within one-half mile of the site, or as required by the city engineer during the pre-application review, concept plan review, or informal project review. d. For two-way stop controlled intersections, analysis of whether the intersection would satisfy signalization warrants if the two-way stop control was removed. Response: Please see Traffic Impact Study performed by Marvin & Associates that includes the requested information. Cottonwood Subdivision Preliminary Plat Application g. Capacity. Indicate the levels of service (before and after development) of existing and proposed streets and roads, including appropriate intersections, to safely handle any increased traffic. Describe any anticipated increased maintenance that will be necessary due to increased traffic and who will pay the cost of maintenance. Response: Please see Traffic Impact Study performed by Marvin & Associates that includes the requested information. h. Bicycle and pedestrian pathways, lanes and routes. Describe bicycle and pedestrian pathways, lanes or routes to be developed with the development. Response: Bike lanes are included with the improvements to Cottonwood Road. All the roads within the subdivision will have sidewalks on both sides for pedestrians. West Garfield Street is considered a collector so it is likely to include bike lanes. However, it is unclear from the Bozeman Transportation Master Plan (TMP) and Appendix K: Corridor Striping Plans of said TMP whether the long-range plan for this section of West Garfield Street will include bikes lanes or not. At this time, it is assumed that bike lanes will be required on West Garfield Street. i. Traffic calming. Detailed drawings of any proposed traffic calming installations, including locations and turning radius templates. Response: No traffic calming installations are proposed on any of the new roads through the site. FUTURE T W O - T H I R D S S T A F F O R D A V E . S T R E E T S E C T I O N (NO R T H O F C O T T O N W O O D S U B D I V I S I O N ) S T A F F O R D A V E . S T R E E T S E C T I O N F I G U R E A M A D I S O N E N G I N E E R I N G 8 9 5 T E C H N O L O G Y B L V D , S U I T E 2 0 3 B O Z E M A N , M T 5 9 7 1 8 P H O N E ( 4 0 6 ) 5 8 6 - 0 2 6 2 COTTONWOOD SUBD.STAFFORD ROAD CROSS SECTI O N ALLIED WASTE New Paving Line (curb and gutter) LOT L, MINOR SUB 313 TRACT 1, COS 2229 LOT 2, MINOR SUB 454B ST A F F O R D A V E . TOWN P U M P ALPHA DR. (FUTURE) COTTONWOOD SUBD. HUFFINE LANE ALLEY MADISON ENGINEERING 895 TECHNOLOGY BLVD SUITE 203 BOZEMAN, MT 59718 (406) 586-0262 FIGURE B Stafford Ave. R.O.W. Cottonwood Subd.COTTONWOOD SUBDIVISION BOZEMAN, MT 40' R.O.W. ALIGNMENT STAFFORD AVE. NORTH OF SUBD. 1 inch = 0 SCALE 1000' 20005001000