Loading...
HomeMy WebLinkAboutSht C0.1 - Construction Management Plan 01-05-21 ------------------- ------------------------------------------------------------------------------------- EXT'G CURB, GUTTER, & PAVEMENT. AV NLrw PROTECT DURING CONSTRUCTION (TYR) m m m CATAMOUNT 7 ST PHASE A (100'R.O.W) STORMWATER PHASE A PHASE C&D STORMWATER FACILITY FACILITY RMWATER--w-0 SULE PHASE A FACILITY 0 2W 4W W '—";LPHASE B STO I 11] L4-.2TORMWATER FACILITY PRIVATE DRIVEWAY Z SIDEWALK PHASE A > 5; z ------ ------ zrrz JL z -= --- - PHASE B, BLDG PHASE 1, n XDG4 71 PHASED F PHASE A PUBLIC BLIC WATER AND SANITARY SEWER MAIN EXTENSION, SERVICE STUBS & O > > PROPOSED SITE ii FIRE HYDRANT RELOCATION &C U 0 z U1171 Ce PHASE A CATAMOUNT APPROACH, PRIVATE DRIVE CONCRETE CROSSWALK, ADA _j. AND ADJACENT SIDEWALKS PHASE EBUDESKI �E PROJECT FACILITY CENs EXT'G CURB, GUTTER, LOCATION & PAVEMENT PROTECT DURING Catamount St. CONSTRUCTION (TY P) y CONSTRUCTION qe' PHASE A DRAWN BY: JLS 'G A St. REVIEWED BY: CGB EXT'G STORM WATER ROUTE FACILITY SE F PROJECT ENGINEER:CGB PRIVATE DRIVEWAY \EX_rG CURB, GUTTER, DESIGNED BY:CGB & PAVEMENT. PROTECT DURING CONSTRUCTION (TYP) c-D PROPERTY LINE Catron St. 0 Catron St. CONSTRUCTION Burke St.. ROUTE f < Si ental Trail x cattall St. I D r uea -------------- CONSTRUCTION MANAGEMENT AND PHASING PLAN Orville Way --------------i Kim ,rwicke.1 c) r--------------- U 12' 12' C3 E E oc 0 Q) 11� Rawhide Ridgi Ct. (D E cn rL�-4 E CONSTRUCTION MANAGEMENT PLAN PHASING NOTE cf) U) GATE WIDE 1. CONTRACTOR SHALL PROVIDE BARRICADES INFRASTRUCTURE TO BE COMPLETED NTH PHASE A c: 5 U AND WARNING DEVICES TO ENSURE THE INCLUDES: _T SAFETY OF THE PUBLIC AS WELL AS WORKERS. . PUBLIC WATER & SANITARY SEWER MAIN EXTENSIONS > 1 Sartain _z Bo AND SERVICE STUBS 12 2. NO TRENCHES SHALL BE LEFT IN AN UNSAFE CONDITION. ALL TRENCHES SHALL BE . PRIVATE DRIVEWAYS, AS SHOWN, INCLUDING CURB & SECURELY BARRICADED, PLATED OR FILLED IN GUTTER, PAVING AND ADJACENT SIDEWALKS. BEFORE THE END OF EACH WORK DAY. OPEN CONSTRUCTION ROUTE MAP TRENCHES SHALL NOT BE LEFT UNATTENDED. . BLDG 1 UNIT DRIVEWAYS, WALKS, PATIOS AND ADJACENT LANDSCAPING NTS RAILING 3. CONTRACTOR SHALL MAINTAIN SWPPP AT ALL LEGEND TIMES. . PHASE A STORM WATER FACILITIES _4771— MINOR CONTOUR (1") 0 FOUND MONUMENT AS NOTED 0-4 4. CONTRACTOR SHALL KEEP SITE CLEAN OF . PHASE A BIKE RACK _4775— MAJOR CONTOUR (5') A CONTROL POINT DEBRIS THAT MAY BLOW AWAY. PROPERTY LINE/ROW BENCHMARK CORNER 5. CONSTRUCTION TRASH ENCLOSURE AND FUTURE PHASES TO INCLUDED THE FOLLOWING ------ EASEMENT LINE SEWER MANHOLE IT, rn POST TOP BRACE CHAIN LINK MATERIAL STORAGE AREA TO BE LOCATED BY IMPROVEMENTS WITH EACH PHASE: FENCE 0 SEWER CLEANOUT RAIL POST FABRIC CONTRACTOR. SEE TRASH ENCLOSURE DETAIL BELOW. . PRIVATE DRIVEWAY, AS SHOWN, INCLUDING CURB & WATER VALVE > JS GUTTER AND PAVING. SEWER MAIN ,c 6. 40 CY ROLL OFF CONTAINER MAY BE USED IN SEWER SERVICE FIRE HYDRANT LIEU OF TRASH ENCLOSURE BUT MATERIAL . UNIT DRIVEWAYS, WALKS, PATIOS AND ADJACENT WATER MAIN CURB STOP STORAGE AREA ENCLOURE MUST BE LANDSCAPING WATER WELL PROVIDED. WATER SERVICE . BIKE RACK ADJACENT TO PHASE F DRIVEWAY FIRE SERVICE STREET SIGN 7. EXCAVATED MATERIAL SHALL BE STOCKPILED INSTSLLED WITH PHASE F BOLLARD STORM MAIN IN A SAFE CONDITION AND REMOVED FROM ga LIGHT POLE SITE AS SOON AS PRACTICAL. OVERHEAD POWER > 6' OVERHEAD TELEPHONE POWER POLE > GUY ANCHOR > UNDERGROUND GAS > UNDERGROUND PHONE [E] ELECTRICAL PEDESTAL 00 (21 >> UNDERGROUND ELECTRIC ELECTRICAL METER > ROAD CENTERLINE ED TELEPHONE PEDESTAL > >> CURB & GUTTER GAS METER SHEET EDGE OF PAVEMENT r!j GAS VALVE -"-BOTTOM NOTE: TEST PIT Co.I RAIL SELF ------ EDGE OF Q� SUPPORTED Z PERC TEST 1. CONTRACTOR MAY USE ROLL OFF EDGE OF CONCRETE PALISADES CONDOS CONTAINER AT HIS DISCRETION. FENCE ------ EDGE OF BUILDING TREE CONIFER (SIZE AS NOTED) CMP&PHASING DETAIL UNDERGROUND GAS TREE DECIDUOUS (SIZE AS NOTED) PROJECT:18-122 Cat CONSTRUCTION TRASH ENCLOSURE&MATERIAL STORAGE AREA -up—w- UNDERGROUND ELECTRIC N.T.S. DATE:03/15/20