HomeMy WebLinkAboutStormwater Design Report 07-21-20 STORMWATER DESIGN REPORT
FOR:
PALISADES CONDOMINIUM
BOZEMAN, MT
Prepared By:
MADISON
ENGINEERING
Madison Engineering
895 Technology Blvd Ste 203
Bozeman, MT 59718
(406) 586-0262
May 2020
Revised July 2020
STORMWATER DESIGN REPORT
FOR:
PALISADES CONDOMINIUM
BOZEMAN, MT
OttiT,�rilri
NA N,q
CIiR!5 G.• '
QUDCS
-I KI-1c
s;OfillNA`����
Madison Engineering
895 Technology Blvd Ste 203
Bozeman, MT 59718
(406) 586-0262
May 2020
Revised July 2020
PALISADES CONDOMINIUM SITE PLAN
3354 WARBLER WAY, BOZEMAN, MT
STORMWATER DESIGN REPORT
A. Introduction
The proposed development for the Palisades Condominium Site Plan will be constructed at 3354
Warbler Way in Bozeman, MT. The site development consists of 6 residential condominiums
and associated infrastructure.
The following references were used in the preparation of this report:
a. COB Design Standards and Specifications Policy, 2004 (DSSP). Addendum #6
b. COB Modifications to Montana Public Works Standard Specifications (MPWSS)
B. Stormwater Management
The site is separate into 6 separate drainage basins. Stormwater from each proposed drainage
basin was graded to flow into various curb inlets and/or curb cuts throughout the site. From the
curb inlets, stormwater is directed into separate underground retention systems consisting of
perforated corrugated metal pipe (CMP) which will be installed in pervious rock backfilled
trenches. From the curb cuts, stormwater is directed into separate at-grade retention ponds with
4:1 side slopes. Infiltration rock will be installed in the bottom of these retention basins to allow
for the stormwater to infiltrated into the ground between storm events. It should be noted that
Basin B is unique in that the underground CMP system is split with a portion of the required
volume in a 66' long chamber located between buildings B and C and the other balance of the
required volume is in two parallel 86' long chambers located behind building E. Basin B
includes the existing two 4-plexes in the southwest corner that drain to the proposed curb inlet
area drain. The Basin B infiltration basins are connected by a 12" storm pipe.
Stormwater run-off was calculated based on the Rational Method and the retention systems were
sized per the City of Bozeman's design standards for a storm intensity of 10-year frequency and
a 2-hour duration. A summary table of the retention systems is provided in Table 1.
Table 1
Stormwater retention system summary
Property Basin A Basin B Basin C Basin D Basin E Basin F
Type of Typical at- Underground Underground Typical at- Typical at- Underground
retention grade pond CMP (two CMP grade pond grade pond CMP
system separate
locations)
Req'd vol. (cfl 760 1 2,234 334 137 205 498
Prop. vol. (cfl 769 2,283 364 172 220 499
Palisades Condominium
Stormwater Design Report
Page 1 of 2
C. Groundwater
We have been monitoring the groundwater to determine the depth during peak groundwater. A
monitoring well was installed and located where the proposed underground stormwater basin will
be located. Between 5/8/30 and 7/22 weekly measurements have been taken and the results are
shown in Appendix D. To date, the highest measured groundwater depth in the monitoring well
is 4657.83. Once the water and sewer mains are installed it is anticipated ground water will drop
which is historical observed after mains are installed.
Basin B — CMP Infiltration Basin Elevations
• Minimum finish grade over basin 4763.0
• Top of porous stone(6") 4761.5
• Top of CMP 4761.0
• Invert of CMP (30") 4658.5
• Bottom of porous stone (6") 4758.0
• High Groundwater 4657.8
Basin C —CMP Infiltration Basin Elevations
• Minimum finish grade over basin 4764.5
• Top of porous stone(6") 4763.2
• Top of CMP 4762.2
• Invert of CMP (24") 4660.2
• Bottom of porous stone (6") 4759.7
• High Groundwater 4657.8
Basin F —CMP Infiltration Basin Elevations
• Minimum finish grade over basin 4763.0
• Top of porous stone(6") 4761.5
• Top of CMP 4761.0
• Invert of CMP (30") 4658.5
• Bottom of porous stone (6") 4758.0
• High Groundwater 4657.8
Appendices
A. Stormwater basin calculations
B. Stormwater Maintenance Plan
C. Drainage Exhibit
D. Groundwater Monitoring Summary
E. Pipe Capacity Calculation
Palisades Condominium
Stormwater Design Report
Page 2 of 2
Appendix
Appendix A:
Stormwater basin calculations
Palisades Condominium 7/21/2020
Basin A
Bldg A& 1/2 of Bldg B Roofs, & Driveways and Drive Lane
Stormwater Run Off& Retention Basin Calculations
Calculation of Required Volume for Storm Retention Pond
Design Rainfall Freq. 10 year
IDF coefficient a 0.64
IDF coefficient b
IDF coefficient n 0.65
Post-development Calculations
C
Areas (ft): open space 7,470 0.20
Roof Area 5,314 0.90
Impervious 5,559 0.90
Total: 18,343
composite C: 0.61
Retention Pond Calculations:
Q = CIA
C = 0.61 (post-development)
1 = 0.41 in/hr(10-yr, 2-hr storm)
A= 0.42 acres
Q = 0.11 cfs
required retention storage(ft3)= 760 ff'
Volume held between contours:
Cumulative
Contour Area (ft ) Delta V(ft) Volume (ft)
4660.50 123
4661.00 369 123 123
4661.50 640 252 375
4662.00 936 394 769
Design storage at 1.5'depth (ft) = 769
A- Bldg A& B- Roofs and Driveway Retention Basin Calc 07-21-20.xls
Palisades Condominium 4/29/2020
Basin B Revised 07-21-20
Bldg C&D-3 Plex Driveways&Drivelane&1/2 of Bldg B roof
PLUS Ext'g 4-plexes and driveways
Stormwater Run Off&Retention Basin Calculations
Calculation of Required Volume for Storm Retention Pond
Design Rainfall Freq. 10 year
IDF coefficient a 0.64
IDF coefficient b
IDF coefficient n 0.65
Post-development Calculations
C
Areas(ft): open space 12,807 0.20
Roof Area 10.051 0.90
Impervious 23,918 0.90
Total: 46,776
composite C: 0.71
Retention Pond Calculations:
Q=CIA
C= 0.71 (post-development)
1 = 0.41 in/hr(10-yr,2-hr storm)
A= 1.07 acres
Q= 0.31 cfs
required retention storage(ft)= 2,234 ft'
Contech Corrugated CMP Pipe Storage Calculations
Pipe Area
A=3.14xR`'
Diameter Radius
2.5 1.25 3.14 = 4.91 ft
Pipe Volume
A=3.14xR2
Diameter Radius
2.5 1.25 3.14 = 4.91 ft2
Length(3-rows @ 65'each) = 238 ft
Volume
Stone Volume
Stone Width = 4.75 ft
Stone Depth = 3.5 ft
Area = 16.625 ft2
Less Pipe Area = 4.91 ft2
Stone Area = 11.72 ft2
Pipe Length = 238 ft
Storage Volume in Stone(40%voids) = 1,118 ft'
Total Storage Volume = 1 2,283 ft'
B-Bldg C&D-Driveway Retention Basin Calc 07-21-20.xls
Palisades Condominium 4/29/2020
Basin C Revised 07-21-20
Bldg C&D-3 Plex Roofs
Stormwater Run Off&Retention Basin Calculations
Calculation of Required Volume for Storm Retention Pond
Design Rainfall Freq. 10 year
IDF coefficient a 0.64
IDF coefficient b
IDF coefficient n 0.65
Post-development Calculations
C
Areas(ft): open space 0.20
Roof Area 5.511 0.90
Impervious 0.90
Total: 5511
composite C: 0.90
Retention Pond Calculations:
Q=CIA
C= 0.90 (post-development)
1= 0.41 in/hr(10-yr, 2-hr storm)
A= 0.13 acres
Q= 0.05 cfs
required retention storage(ft3)= 334 ft3
Contech Corrugated CMP Pipe Storage Calculations
Pipe Area
A=3.14 x R`
Diameter Radius
1 1 3.14 = 3.14 ft`
Pipe Volume
A=3.14xR2
Diameter Radius
2 1 3.14 = 3.14 ft2
Length(1-row @ 44'long) = 44 It
Volume = 138 ft,
Stone Volume
Stone Width = 4 ft
Stone Depth = 4 ft
Area = 16 ft2
Less Pipe Area = 3.14 ft2
Stone Area = 12.86 ft2
Pipe Length = 44 It
Storage Volume in Stone(40%voids) = F226 ft3
Total Storage Volume = 364 ft'
C-Bldg C&D-Roofs Infiltration Retention Basin Calc 07-21-20.xis
Palisades Condominium 4/29/2020
Basin D
East Driveway
Stormwater Run Off& Retention Basin Calculations
Calculation of Required Volume for Storm Retention Pond
Design Rainfall Freq. 10 year
IDF coefficient a 0.64
IDF coefficient b
IDF coefficient n 0.65
Post-development Calculations
C
Areas (ft): open space 1,432 0.20
Roof Area 0.90
Impervious 1,940 0.90
Total: 3,372
composite C: 0.60
Retention Pond Calculations:
Q =CIA
C = 0.60 (post-development)
1 = 0.41 in/hr(10-yr, 2-hr storm)
A= 0.08 acres
Q = 0.02 cfs
required retention storage(ft3)= 137 ft3
Volume held between contours:
Cumulative
Contour Area (ft) Delta V(ft) Volume (ft)
4662.90 50
4663.4 156 52 52
4663.9 230 97 148
4664.0 257 24 172
Design storage at 1.1'depth (ft) = 172
D - East Driveway Retention Basin Calc 03-26-19.xls
Palisades Condominium 4/29/2020
Basin E
Bldg F-2 Plex& Driveway
Stormwater Run Off& Retention Basin Calculations
Calculation of Required Volume for Storm Retention Pond
Design Rainfall Freq. 10 year
IDF coefficient a 0.64
IDF coefficient b
IDF coefficient n 0.65
Post-development Calculations
C
Areas (ft): open space 2,168 0.20
Roof Area 1,920 0.90
Impervious 985 0.90
Total: 5,073
composite C: 0.60
Retention Pond Calculations:
Q = CIA
C = 0.60 (post-development)
1 = 0.41 in/hr(10-yr, 2-hr storm)
A= 0.12 acres
Q = 0.03 cfs
required retention storage(ft3)= 205 ft3
Volume held between contours:
Cumulative
Contour Area (ft) Delta V(ft) Volume(ft)
4662.80 10
4663.0 85 9 9
4663.5 204 72 82
4664.0 348 138 220
Design storage at 1.2'depth (ft)= 220
E- Bldg F-2 Plex Roof Retention Basin Calc 03-26-19.xls
Palisades Condominium 4/29/2020
Basin F Revised 07-21-20
Bldg E-4 Plex Roof and Driveway
Stormwater Run Off&Retention Basin Calculations
Calculation of Required Volume for Storm Retention Pond
Design Rainfall Freq. 10 year
IDF coefficient a 064
IDF coefficient b
IDF coefficient n 0.65
Post-development Calculations
C
Areas(ft): open space 3,686 0.20
Roof Area 3,774 0.90
Impervious 3,617 0.90
Total: 11,077
composite C: 0.67
Retention Pond Calculations:
Q=CIA
C= 0.67 (post-development)
1= 0.41 in/hr(10-yr,2-hr storm)
A= 0.25 acres
Q= 0.07 cfs
required retention storage(ft')= 498 ft
Contech Corrugated CMP Pipe Storage Calculations
Pipe Area
A=3.14xR`
Diameter Radius
1.25 3.14 = 4.91 ft`
Pipe Volume
A=3.14xR2
Diameter Radius
2.5 1.25 3.14 = 4.91 ft2
Length(1-row @ 54'long) = 54 ft
Volume = 265 ft'
Stone Volume
Stone Width = 4.5 ft
Stone Depth = 3.5 ft
Area = 15.75 ft2
Less Pipe Area = 4.91 ft2
Stone Area = 10.84 ft2
Pipe Length = 54 ft
Storage Volume in Stone(40%voids) = r7 234 W
Total Storage Volume = 499 ft'
F-Bldg E-4 Plex Roof&Driveway Retention Basin Calc 07-21-20.xls
Appendix B:
Stormwater Maintenance Plan
Detention Inspectionr •
Underground stormwater detention and infiltration systems must Maintenance
be inspected and maintained of regular intervals for purposes of CMP detention systems should be cleaned when on inspection reveals
performance and longevity. accumulated sediment or trash is clogging the discharge orifice.
Inspection Accumulated sediment and trash can typically be evacuated through
Inspection is the key to effective maintenance of CMP detention
the manhole over the outlet orifice. If maintenance is not performed
systems and is easily performed. Contech recommends ongoing, as recommended,sediment and trash may accumulate in front of the
annual inspections. Sites with high trash load or small outlet outlet orifice. Manhole covers should be securely sealed following
control orifices may need more frequent inspections. The rate
cleaning activities. Contech suggests that all syslems be designed with
at which the system collects pollutants will depend more on- an access/inspection manhole situated at or near the inlet and the
site specific activities rather than the size or configuration of the outlet orifice. Should it be necessary to get inside the system to perform
maintenance activities,all appropriate precautions regarding confined
system. space entry and OSHA regulations should be followed.
Inspections should be performed more often in equipment
Annual inspections are best practice for all underground systems.
washdown areas, in climates where sanding and/or salting
operations take place,and in other various instances in which During this inspection if evidence of salting/de-icing agents is observed
within the system, it is best practice for the system to be rinsed,
one would expect higher accumulations of sediment or abrasive/ including above the spring line soon after the spring thaw as part of the
corrosive conditions.A record of each inspection is to be maintenance program for the system.
maintained for the life of the system.
Maintaining an underground detention or infiltration system is easiest
when there is no flow entering the system. For this reason,it is a good
idea to schedule the cleanout during dry weather.
The foregoing inspection and maintenance efforts help ensure
underground pipe systems used for stormwater storage continue to
function as intended by identifying recommended regular inspection
and maintenance practices. Inspection and maintenance related to the
structural integrity of the pipe or the soundness of pipe joint connections
is beyond the scope of this guide.
•
1'
ow::G IN nia CA Lu >-oULD h7 co•sr.JED s;%rc;�AVTr<rouceno"s w�icEsrD Haan_ CMP DETENTION SYSTEMS
IJ_J:`SC�IREp ONL'r;O I,ELV kEl.D ECS v.YE iHtlK O','J.V E\'AIUATIDNS A`:D D`CISIO\',,;.,NCI«�E rJ_ITH`4
G'_I*�.NTEES 14OP'1:=RW`l'ICS OF SUJAIII_IT7 FOR 1-34"A ULICATION CC)NTECH/.1-1'Ec I,1J 44ti<t:Tt
W-WSOEVEZ REi STED TG TW A°NIICaT10. 5 WJEI JAL,COATINGS,M P:ODJCV
DiSC,M:D I I:f.EIN r'.I I V.=11�D 1'.A224!'rIEi Cti 1.1FRCI'hN'4BI_Il l SNI ALL 1','LIi D N'A':i=:lIIFS O"Ill:_= C",1•NTECH•
FO2A`,PPUICUTA¢V,)kFD,_AAE D15CC+:I.MEG BY CCNTECH SEE CONTECH'S CO"DITill"N CF Sl_C 4
('M;.i51F AT V-.,YJCOI IILCH,-' roe MOO c.ro�anov ENGINEERED SOLUTIONS
C 2319COUT_,HE.N';INEET:DS:JLLITIONi ILC A(]U10ET_CO%I'Asn
C_M1 kNTEII>N'__:S'..IJ=IJ%17'D" AIL 21G�TS?ESEWFJ F4INT_n 1%UjA
PALISADE CONDOMINIUMS
Storm Water Facilities
Maintenance Plan
Project Name File No. 19461
Owner's responsibility for routine inspection and maintenance
1. Keep the curb inlets, area drains and pipes free of leaves, rocks, and other debris.
2. Re-sod damaged or maintained areas immediately, or use grass plugs from the
adjacent up-slope area.
3 Quarterly inspect and clean curb inlets, area drains and pipes.
4. Remove sediment from curb inlets sump by hand during the summer months
whenever sediment has accumulated to greater than 3"in the bottom of the basin.
7. See that litter and other debris are removed from grates in order to reduce
obstruction of flow.
8. The Contech CMP retention/infiltration system to be inspected quarterly and
maintained per the attached Contech CMP Detention Inspection and Maintenance
Guide.
9. Stormwater facilities shall be maintained by the owner or other responsible parry
in a condition so that the facilities will function as designed.
10. Waste shall be disposed of from maintenance of facilities in accordance with
applicable federal, state and local laws and regulations.
11. The owner or other responsible party shall create and maintain records of
installation and maintenance and repair for the life of the development and shall
be made available to the engineering department upon request.
12. Owner to maintain and fund Operation and Maintenance of facilities.
aw
Pali sad ondominium
G:\MADISON ENGINEERING\PROJECTS\2018\18-122 Pallisades Condominium\Storm\Stormwater Maintenance Plan-Palisade
03-15-20.doc
Appendix C:
Drainage Exhibit
UT A.-
�T4
ul
u G G- BASIN C UNDERGROUND7G 0 PG UP UE-G
BASIN• A - 6:— U�p J�f u UJW7-7T7uj�p
BASIN B UNDERGROUND Hp
�ETENTION INFILTRATION SYSTEM
BASIN D`—
INFILTRATION SYSTEM (1 ) t---
POND r- _7
HLIENIIUN POND�'
- - - - - - BASIN D r.
SCALE �hl
Vi
r.
l inch= 300f� BLDG C BLM D
JR
-17up
BLDG C
BLDGB
BASIN C BASIN C
BASIN A BLDGA L
BASIN E
RETENTION POND
:3 BASIN B
CURB INLET
ww
CURB INLET
BASIN F UNDERGROUND
I / /sus "' '> \ \ INFILTRATION SYSTEM
BASIN E
D
'4!' •
BASIN B UNDERGROUND
\\ J
BLDGF
INFILTRATION SYSTEM (2)
100
BLDGia , BASIN F 10 '
BASIN B
�o
"r. EXrG
4-PLEX 00,400
%*o
kx
E
=G
4-PLM
100
113-
OW-00
00-00
PALISADES CONDOMINIUM SDI.0
STORM MADISON ENGINEERING WATER DRAINAGE EXHIBIT DRAWN BY: TDS
895 TECHNOLOGY BLVD,STE 203,BOMIAN,MT 59718
POST-DEV. DRAINAGE AREA DELINEATION PHONE(406)58"262 PROJECT h�.DATE: 7-21-20
V. 100 18-122
BOZEMAN,MT
Appendix D:
Groundwater Monitoring Summary
Palisade Condominium
Groundwater Monitoring Summary
Top of Pipe Top of Casing Grnd Elevation Monitoring
Elevation to Ground (ft) @ Pipe Base Date Measured GW GW Depth
4665.87 2.80 4663.07 5/8/2020 8.04 4657.83 5.24
4665.87 2.80 4663.07 5/15/2020 8.11 4657.76 5.31
4665.87 2.80 4663.07 5/23/2020 8.31 4657.56 5.51
4665.87 2.80 4663.07 5/27/2020 8.34 4657.53 5.54
4665.87 2.80 4663.07 6.5/20 8.70 4657.17 5.90
4665.87 2.80 4663.07 6.15/20 8.59 4657.28 5.79
4665.87 2.80 4663.07 6.26/20 8.42 4657.45 5.62
4665.87 2.80 4663.07 7./3/20 8.38 4657.49 5.58
4665.87 2.80 4663.07 7/13/2020 8.87 4657.00 6.07
4665.87 2.80 4663.07 22-Jul 9.02 4656.85 6.22
Appendix E:
Pipe Capacity Calculation
Palisades Condominium 7/21/2020
Basin B
Bldg C & D -3 Plex Driveways& Drivelane& 1/2 of Bldg B roof
PLUS Ext'g 4-plexes and driveways
25 year Stormwater Run Off Calculation
Calculation of Required Volume for Storm Retention Pond
Design Rainfall Freq. 25 year
IDF coefficient a 0.78
IDF coefficient b
IDF coefficient n 0.64
Post-development Calculations
C
Areas (ft): Landscaped 12,807 0.20
Roof Area 10,051 0.90
Impervious 23,918 0.90
Total: 46,776
composite C: 0.71
Retention Pond Calculations:
Q = CIA
C= 0.71 (post-development)
1 = 2.26 in/hr(25-yr, 2-hr storm)
A= 1.07 acres
Q= 1.72 cfs
B- Bldg C & D-25 year Stromwater Runoff Calc 07-21-20.xls
Pipe#1
8"SD Pipe-Bssin B
Curb Inlet to Basin
i
Manning's Eqn. Q= 1.486 A Ry'S'n
n
Diameter,do(i 12.0 Enter Value
Diameter,do(f 1.00 THETA
Units= 1.486 _)
n= 0.013
Slope,S(ft/ft) 0.006
Basin B-25 Year Storm Event-0.30 cfs
Wetted Hyaraunc Hydraulic ecion Lnergy,
Perimeter,P Radius,R Top Width, Depth,D Factor,Z Q(gpd-8 =V2/2g
Depth,y(ft) Theta(rad) Area,A(ft2) (ft) (ft) T(ft) (ft) (ft s'Z) Q(cfs) Q(gpm) hour day) V(ft/s) (ft)
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 00 0.0 0.0 0.00
0.05 0.90 0.01 0.45 0.03 0.44 0.03 0.00 0.01 5.4 2606.2 0.8 0.01
0.10 1.29 0.04 0.64 0.06 0.60 0.07 0.01 0.05 23.6 11330.7 1.3 0.03
0.15 1.59 0.07 0.80 0.09 0.71 0.10 0.02 0.12 55.0 26381.0 1.7 0.04
0.20 1.85 0.11 0.93 0.12 0.80 0.14 0.04 0.22 99.0 47526.2 2.0 0.06
0.25 2.09 0.15 1.05 0.15 0.87 0.18 0.06 0.36 154.9 74342.0 2.2 0.08
0.30 2.32 0.20 1.16 0.17 0.92 0.22 0.09 0.49 221.4 106280.3 2.5 0.10
0.35 2.53 0.24 1.27 0.19 0.95 0.26 0.12 0.66 297.3 142701.2 2.7 0.11
0.40 2.74 0.29 1.37 0.21 0.98 0.30 0.16 0.85 381.0 182888.0 2.9 0.13
0.45 2.94 0.34 1.47 0.23 0.99 0.34 0.20 1.05 471.0 226056.5 3.1 0.15
0.50 3.14 0.39 1.57 0.25 1.00 0.39 0.26 1.26 565.3 271357.0 3.2 0.16
0.55 3.34 0.44 1.67 0.26 0.99 0." 0.30 1.48 662.2 317873.6 3.3 0.17
0.60 3.54 0.49 1.77 0.28 0.98 0.50 0.35 1.69 759.E 364617.1 3.4 0.18
0.65 3.75 0.64 1.88 0.29 0.95 0.67 0.41 1.91 855.2 410513.5 3.6 0.19
0.70 3.96 0.59 1.98 0.30 0.92 0.64 0.47 2.11 946.6 454380.7 3.6 0.20
0.75 4.19 0.63 2.09 0.30 0.87 0.73 0.64 2.30 1031.0 494888.9 3.6 0.21
0.80 4.43 0.67 2.21 0.30 0.80 0.84 0.62 2.46 1105.2 530485.1 3.7 0.21
0.85 4.69 0.71 2.35 0.30 0.71 1.00 0.71 2.60 1165.1 559234.5 3.6 0.21
0.90 6.00 0.74 2.50 0.30 0.60 1.24 0.83 2.69 1205.0 578423.2 3.6 0.20
0.95 5.38 0.77 2.69 0.29 0.44 1.77 1.02 2.71 12149 583154.2 3.5 0.19
1.00 6.28 0.79 3.14 0.25 0.00 2.62 11310 542897.6 3.2 0.16
4.00
3.50
3,00 Oef
10,
2.50
i
i
-- .00
1.50
1.00 -
0.50
.'
000
0.00 0.20 0.40 0.60 0.80 1.00 1.20
Depth(ft)