Loading...
HomeMy WebLinkAboutL3.03_LandscapePlansResidentialPhase1&2_01-19-2021PAT EMRLD EMRLD SIO UP UP UP UP MED MED MED MED MED MED ME D 8' ME D BLUBLU 3 3 6 6 4 4 4 5 5 5 UNIT 1A UNIT 1B UNIT 2A UNIT 2B BLU MED TREES SYMBOL BOTANICAL NAME COMMON NAME PERENNIALS & GRASSES *** DROUGHT TOLERANT SPECIES PICEA PUNGENS*** COLORADO SPRUCE ECHINACEA PURPUREA*** PURPLE CONEFLOWER HELICTOTRICHON SEMPERVIRENS*** BLUE OAT GRASS NEPETA RACEMOSA 'WALKER'S LOW'*** WALKER'S LOW CATMINT SPOROBOLUS HETEROLEPIS*** PRAIRIE DROPSEED CALAMAGROSTIS X ACUTIFLORA 'KARL FOERSTER' KARL FOERSTER FEATHER REED GRASS DESCHAMPSIA CESPITOSA TUFTED HAIRGRASS ACHILLEA 'MOONSHINE' MOONSHINE YARROW POLEMONIUM CAERULEUM 'BLANJOU' BRISE D'ANJOU JACOB'S LADDER SHRUBS 8' POPULUS TREMULA 'ERECTA' COLUMNAR SWEDISH ASPEN JUNIPERUS HORIZONTALIS 'BLUE CHIP'*** BLUE CHIP CREEPING JUNIPER JUNIPERUS SCOPULORUM 'MEDORA'*** MEDORA ROCKY MOUNTAIN JUNIPER RIBES ALPINUM*** ALPINE CURRANT SYMPHORICARPOS ALBUS*** SNOWBERRY VIBURNUM DENTATUM ARROWWOOD VIBURNUM SPR MALUS SPP. 'SPRING SNOW' SPRING SNOW CRABAPPLE PLANT SCHEDULE- RESIDENTIAL P A T U P U P S P R M E D M E D M E D M E D M E D M E D M E D M E D S P R S P R 3 6 4 4 4 3 5 5 5 5 5 UNIT 3A UNIT 3B UNIT 7A UNIT 7B S P R 1 NATIVE SEEDING: UPLAND SEED MIX 2 LANDSCAPE BOULDER 3 KEYNOTES 1 12" ALL ROUND ROCK, TYP. 4 NATIVE WATERCOURSE SEEDING: ZONE 1 SEEDING 5 6 BLACK ALUMINUM EDGING, PER PLAN NATIVE FESCUE SOD SERVICE ENCLOSURES LANDSCAPING · LANDSCAPE SCREENING IS PROVIDED UTILITY METERS LANDSCAPING REQUIRED AND PROVIDED: ·IF SUCH ELEMENTS ARE MOUNTED IN A LOCATION VISIBLE FROM THE STREET, PEDESTRIAN PATHWAY, SHARED OPEN SPACE, OR SHARED AUTO COURTYARDS, THEY MUST BE SCREENED WITH VEGETATION AND / OR INTEGRATED INTO THE BUILDING'S ARCHITECTURE OPEN SPACE REQUIRED ·ALL MULTI-HOUSEHOLD DEVELOPMENT, INCLUDING MULTI-HOUSEHOLD PORTIONS OF MIXED-USE DEVELOPMENT, MUST PROVIDE MINIMUM USABLE OPEN SPACE EQUAL TO 150 SQUARE FEET PER DWELLING UNIT FOR DWELLINGS WITH TWO OR MORE BEDROOMS. 150 FT² X 14 UNITS = 2,100 FT² TOTAL REQUIRED PROVIDED: TERRACE AREAS: DEVIATION REQUEST IN ORDER TO PROVIDE 100% OF REQUIRED OPEN SPACE IN THE FORM OF TERRACES BUILDINGS 1-6 TERRACE SPACE PER UNIT: 558 FT² BUILDING 7 TERRACE SPACE PER UNIT: 740 FT² TOTAL OPEN SPACE PROVIDED: 8,176 FT² WATERCOURSE SETBACK LANDSCAPING REQUIRED ·ZONE 1: ZONE 1 MUST BE PLANTED WITH NEW OR EXISTING NATIVE MATERIALS. ONE HUNDRED PERCENT OF THE DISTURBED AREAS OF ZONE 1 MUST BE PLANTED WITH A GROUND COVER OF NATIVE RIPARIAN SEDGES, FORBS AND GRASSES SUITED FOR THE AREA. IN ADDITION, A MINIMUM OF ONE SHRUB FOR EVERY TEN LINEAR FEET AND ONE TREE FOR EVERY 30 LINEAR FEET OF THE WATERCOURSE IS REQUIRED. TOTAL LINEAR FEET OF ZONE 1WATERCOURSE SETBACK ON PROPERTY =160 LF REQUIRED: SHRUB TOTAL = 16, TREE TOTAL = 5.33 PROVIDED: 16 SHRUBS, 0 TREES* (*NOTE:NO TREES PROVIDED FOR AREA DUE TO UTILITY EASEMENT CONFLICTS WITHIN THE WATERCOURSE SETBACKS) REQUIRED AND PROVIDED ·ZONE 2: DISTURBED AREAS OF ZONE 2 MUST BE PLANTED WITH NEW OR EXISTING NATIVE GRASSES SUITED FOR THE AREA. PLANT SCHEDULE- RESIDENTIAL OTHER NATIVE FESCUE SOD BLEND GALLATIN VALLEY SOD BLACK ALUMINUM EDGINGSEE PLAN 1 12" ALL ROUND - OR APPROVED EQUAL 3" - 4" DEPTH FLATWILLOW LANDSCAPE BOULDER SYMBOL BOTANICAL NAME COMMON NAME *NOTE:RESIDENTIAL PHASING ON THE LANDSCAPE PLANS REPRESENT THE ORDER IN WHICH THE DWELLING UNITS WILL BE CONSTRUCTED ON THE SITE. CIVIL PHASING PLAN REPRESENTS THE ORDER OF BUILDINGS AND INFRASTRUCTURE TO BE CONSTRUCTED PER PHASE. REFER TO CIVIL FOR OVERALL SITE PHASING PLAN AND LAYOUT. design5la.com 406.587.4873 date issue dr a w n b y : ch e c k e d b y : fi l e n a m e : z: \ s w i s s p l a z a \ s w i s s p l a z a a u t o c a d \ 0 1 _ s h e e t s \ l 0 0 0 _ s w i s s - p l a z a _ l a n d s c a p e . d w g Sw i s s P l a z a Bo z e m a n , M o n t a n a NB / M C TM S 10/08/20 SP1 01/19/21 SPRV1 Residential Phase 1 & 2 Landscape Plans L 303105020 N 1 L303 1" = 10'-0" Residential Phase 2 Landscape Plan 1050 20 N 1 L303 1" = 10'-0" Residential Phase 1 Landscape Plan 1 1 1 1 1 1