THE PLANNING BOARD OF BOZEMAN, MONTANA
PB AGENDA
Monday, March 1, 2021
WebEx Meeting Information
Via Webex:
https://cityofbozeman.webex.com/cityofbozeman/onstage/g.php?MTID=ea479eb750fd7742a25f4ef919f148762
Click the Register link, enter the required information, and click submit.
Click Join Now to enter the meeting
Via Phone:
This is for listening only if you cannot watch the stream or channel 190
• Call-in toll number (US/Canada ): 1-650-479-3208
• Access code: 182 995 9426
Public Comment:
If you are interested in commenting in writing on items on the agenda, please send an email to
agenda@ bozeman.net prior to 12:00pm on Monday, March 1st, 2021. You may also comment by
visiting the City's public comment page.
You can also comment by joining the Webex meeting. If you do join the Webex meeting, we ask you
please be patient in helping us work through this online meeting. If you are not able to join the Webex
meeting and would like to provide oral comment you may send a request to agenda@bozeman.net
with your phone number, the item(s) you wish to comment on, and someone will call you during the
meeting to provide an opportunity to comment. You may also send the above information via text to
406-224-3967.
As always, the meeting will be streamed through the City's video page (click the Streaming Live in the
drop down menu), and available in the City on cable channel 190.
Bozeman Planning Board Meeting Agenda, March 1, 2021
1
an opportunity in conjunction with each action item for comments pertaining to that item.Please
limit your comments to three minutes.
F. Action Items
F.1 Norton Ranch Phase 5 Major Subdivision. Application 21024. (Rosenberg)
F.2 Second work session to define and refine Planning Board goals and Community Plan
Implementation. The initial discussion took place on December 21, 2020. Suggestions on
how to improve Planning Board meeting efficiency. Three supporting documents attached
to this cover memo.(Happel)
G. FYI/Discussion
H. Adjournment
For more information please contact Tom Rogers at trogers@bozeman.net
This board generally meets the 2nd and 4th Monday of each month from 6:00 PM to 8:00 PM
Committee meetings are open to all members of the public. If you have a disability and require
assistance, please contact our ADA coordinator, Mike Gray at 582-3232 (TDD 582-2301).
Bozeman Planning Board Meeting Agenda, March 1, 2021
2
Memorandum
REPORT TO: Planning Board
SUBJECT: Minutes Approval for 12-21-20 and 01-25-21
MEETING DATE: March 1, 2021
AGENDA ITEM TYPE: Minutes
RECOMMENDATION: Suggested Motion:
I move to approve the meeting minutes for December 21st, 2020.
I move to approve the meeting minutes for January 25th, 2021
STRATEGIC PLAN: 1.2 Community Engagement: Broaden and deepen engagement of the
community in city government, innovating methods for inviting input from
the community and stakeholders.
BACKGROUND: None
UNRESOLVED ISSUES: None
ALTERNATIVES: 1. Approve meeting minutes with corrections.
2. Do not approve meeting minutes.
FISCAL EFFECTS: None
Attachments:
01-25-21 Planning Board Minutes DRAFT.pdf
12-21-20 Planning Board Minutes DRAFT.pdf
Report compiled on: January 28, 2021
3
Bozeman Planning Board Meeting Minutes, 01-25-21
Page 1 of 3
THE PLANNING BOARD MEETING OF BOZEMAN, MONTANA
MINUTES
Monday, January 25, 2021
00:01:17 Webex Meeting Information
A) 00:04:20 Call Meeting to Order
B) 00:04:20 Disclosures
C) 00:05:10 Changes to the Agenda
D) 00:05:38 Public Comment
No public comment
E) 00:09:58 Action Items
E.1 00:10:29 Northwest Crossing Phase 1 Major Subdivision Preliminary Plat for the
Subdivision of 146.21 Acres into Fifteen Developable Lots Zoned B-2M and REMU
Cover Page
20113 Staff Report 1-20-21 PB.pdf
20113 Plat Page 1
20113 Plat Page 2
20113 Plat Page 3
20113 Plat Page 4
20113 Plat Page 5
Chairman Happel informed board of communication he received from a member of the public.
Board member Pape commented that he received the same email as Chairman Happel and stated that
he does not have any financial connection to the project and wondered if it was an expose
communication as they received the communication before the action item was on the agenda.
Chairman Happel encouraged board members to confirm that they will not make their decision based
on the comment they received prior to the item being announced on the agenda. Board members
obliged.
4
Bozeman Planning Board Meeting Minutes, 01-25-21
Page 2 of 3
00:14:28 Staff Presentation
Planner Garber presented on the Northwest Crossing Phase 1 Major Subdivision Preliminary Plat.
Explained future land use for the property, existing infrastructure surrounding the property, current
conditions on the site, proposed subdivision lots, primary transportation access, proposed parks for the
subdivision and recommended that the subdivision conforms to standards and is sufficient for approval
with conditions and code provisions. Planner Garber then took questions form the board regarding land
use designations.
00:26:01 Applicant Presentation
Engineer Ekstrom introduced himself and the design team and presented clarifications on Planner
Garber's presentation. Engineer Ekstrom then answered questions from the board regarding
infrastructure, road safety and future land use plans.
00:40:29 Public Comment
City of Bozeman Engineer Griffin Nielsen touched on the cross sections for the internal local streets and
that they will take a look at the proposal for the local streets.
00:47:15 Motion Recommended Motion:
Having reviewed and considered the application materials, public comment, and all the information
presented, I hereby adopt the findings presented in the staff report for application 20113 and move to
recommend approval of the subdivision with conditions noted and subject to all applicable code
provisions.
Richard Rudnicki: Motion
Jerry Pape: 2nd
00:48:03 Discussion
Board Member Rudnicki spoke to motion stating that the proposal makes sense with respect to the City
growth plan.
00:57:50 Motion Board Member Egge motioned to add an amendment to the motion on the floor that
would add an additional conditional mode of approval siting Bozeman Municipal Code 38.400.110E that
bikeways and bicycle trails are designed to code standards.
Mark Egge: Motion
Cathy Costakis: 2nd
Board Member Pape spoke to his second on the initial motion stating that he believes that the project is
serving the immediate needs of the community with respect to the housing crisis.
00:54:28 Vote on the Motion to approve Board Member Egge motioned to add an amendment to the
motion on the floor that would add an additional conditional mode of approval siting Bozeman Municipal
5
Bozeman Planning Board Meeting Minutes, 01-25-21
Page 3 of 3
Code 38.400.110E that bikeways and bicycle trails are designed to code standards.
The Motion carried 9 - 0
Approve:
Henry Happel
Cathy Costakis
Richard Rudnicki
Paul Spitler
Gerald Pape
Mark Egge
George Thompson
Jennifer Madgic
Jerry Pape
Disapprove:
None
00:54:58 Vote on the Motion to approve Recommended Motion:
Having reviewed and considered the application materials, public comment, and all the information
presented, I hereby adopt the findings presented in the staff report for application 20113 and move to
recommend approval of the subdivision with conditions noted and subject to all applicable code provisions.
The Motion carried 9 - 0
Approve:
Henry Happel
Cathy Costakis
Richard Rudnicki
Paul Spitler
Gerald Pape
Mark Egge
George Thompson
Jennifer Madgic
Jerry Pape
Disapprove:
None
F) 00:55:24 FYI/Discussion
G) 00:58:36 Adjournment
For more information please contact Tom Rogers at trogers@bozeman.net. This board generally meets
the 2nd and 4th Monday of each month from 6:00 PM to 8:00 PM.
6
Bozeman Planning Board Meeting Minutes, 12-21-20
Page 1 of 4
THE PLANNING BOARD MEETING OF BOZEMAN, MONTANA
MINUTES
Monday, December 21, 2020
00:27:36 WebEx Meeting Information
A) 00:31:10 Call Meeting to Order
Present: Henry Happel, Cathy Costakis, Richard Rudnicki, Gerald Pape, Mark Egge, George Thompson,
Jennifer Madgic, Marty Matsen (City Staff), Susan Bilo (Speaker)
Absent: None
C) 00:32:00 Changes to the Agenda
No changes to the agenda.
E) 00:32:11 Approval of Minutes
E.1 00:32:11 Approval of the November 16th, 2020 meeting minutes
Cover Page
11-16-20 Planning Board Minutes DRAFT.pdf
00:32:31 Motion Recommended Motion: I move to approve the November 16th meeting minutes.
Cathy Costakis: Motion
No second required
00:32:42 Vote on the Motion to approve Recommended Motion: I move to approve the November 16th
meeting minutes. The Motion carried 6 - 0
Approve:
Henry Happel
Cathy Costakis
Gerald Pape
Mark Egge
George Thompson
7
Bozeman Planning Board Meeting Minutes, 12-21-20
Page 2 of 4
Jennifer Madgic
Disapprove:
None
G) 00:32:52 Public Comment
H) 00:36:33 Special Presentations
H.1 Solar Subdivision in White Hall, Presentation by Susan Bilo
Cover Page
00:38:17 Solar Subdivision Presentation
Susan Bilo introduced herself and provided a brief background regarding her career. Following, she
spoke about a housing project in White Hall that utilizes solar energy. Professor Bilo then inquired as to
why solar energy isn't utilized more in Bozeman and reiterated the benefits. Professor Bilo then
answered questions from the board members.
I) 00:56:44 Action Items
I.1 Work Session on the Planning Board's Goals and Objectives for 2021
Cover Page
Happel Goals Memo to PB-121215.pdf
Saunders memo to PB 12-16-2020.pdf
Strategic Service Community Plan Performance Indicators - 20201216.pdf
Strategic Service Community Plan Performance Indicators Update to Planning Board.pdf
00:57:00 Introduction
Chairman Happel provided an introduction and asked board members to each speak for roughly three
minutes to share their goals and objectives for the Planning Board for 2021.
00:59:52 Board Member Egge
Board member Mark Egge shared the following goals:
- Looking at form based code per the Growth Policy.
- Participate within the UDC Community Platform, by helping to advise on which items are selected and
prioritized.
- Reevaluate the composition of the board body as nine members is a bit unwieldly.
- Resident freeholder requirement should be removed as it is not appropriate.
01:04:06 Board Member Costakis
Board member Cathy Costakis shared the following goals:
- To emphasize the connection to public health and wellness as well as social and economic health in
their roles as Planning Board members.
- Look at pedestrian and bicycle network for safe transportation
8
Bozeman Planning Board Meeting Minutes, 12-21-20
Page 3 of 4
- Look at the cost of housing, increasing density which would require less infrastructure
- Partnerships with other sectors
- Simplifying the Unified Development Code
01:09:13 Board Member Pape
Board member Jerry Pape shared the following goals:
- Better communication between citizens and Planning Board
- Request to City Commission budget and resources for rewrite of UDC
- Board take on a role of guiding the City Commission rather than "rubber stamp board"
- Would like more exposure to head Planner and Director of Community Development
01:15:00 Commissioner Madgic
City Commissioner & Commission Liaison to the board Jen Madgic shared the goals and objectives she'd
like to see the board work toward:
- Post growth policy outreach
- Board education, including guest speakers
- Integrated mix of housing within subdivisions
01:19:22 Board Member Rudnicki
Board member Richard Rudnicki shared the following goals:
- Review metrics and assess whether metrics are informing as intended
- Play a role in the Unified Development Code related to consistency between UDC and Growth Policy -
will they help achieve growth policy objectives
- Take advantage of low hanging fruit related to code provisions
- Related to board productivity, stick to bylaws more to limit the length of presentations
- Be cautious of amending motions to avoid confusion
01:24:56 Board Member Thompson
Board member George Thompson shared the following goals:
- Incorporate work-arounds within the UDC
- Start with discussion to increase clarity of motions
01:28:33 Chairman Happel
Chairman of the board Henry Happel shared the following goals:
- Annual report regarding work toward growth policy
- Information provided by city related to subdivision development - look more at surrounding area
rather than within proposed area and be made aware of major issues during the review process
- Information flow - staff is ready to approve, therefore board should approve. Review and approval
would carry more weight if board had access to more information. Can they utilize sources outside of
Community Development?
- Board competence - work toward being a source of trusted advice separate from the city. Broader and
deeper Planning expertise.
- Look at the way they debate, create, and finalize motions.
9
Bozeman Planning Board Meeting Minutes, 12-21-20
Page 4 of 4
- Generally improve process
- Shorten staff reports from an average of 25 pages to 5 pages, removing a lot of 'boiler plate'
information.
01:40:37 Commissioner Madgic asked Director of Community Development, Marty Matsen to
speak about some of the points discussed.
Director Matsen shared that he will discuss the Planning Board budget with the City Manager. He also
shared that meetings like this, where others are able to hear board member objectives, are helpful to
staff. Director Matsen then discussed subdivision review and shared that staff works hard to eliminate
unresolved issues prior to a project being brought before the board.
01:48:18 Additional Remarks
Board member Rudnicki shared that he felt if a project has too many issues, it should be denied rather
than approved with a large amount of conditions. He concurred that staff reports could be shorter.
Board member Mark Egge shared that he'd like to see more alignment with the City's Strategic Plan, as
well as with other advisory boards' efforts.
Board member Jerry Pape spoke to Chairman Happel's goal of becoming a trusted source for the
City. He made the point that the board needs experience with development within the community, and
continued to share his experience with the Community Development Department. Additionally, board
member Pape shared that he felt the resources for Community Development need to vastly expand.
Chairman Happel shared that he will create a memo capturing the comments made this evening, and
will circulate among board members to prepare for a second meeting.
Board member Cathy Costakis shared that she felt the community engagement piece is critical to the
success of the board.
Commissioner Jen Madgic provided a clarification regarding a resident free holder requirement, state
code statute 76-1-221.
J) 02:08:52 FYI/Discussion
K) 02:11:44 Adjournment
For more information please contact Tom Rogers at (406) 582-2268 or trogers@bozeman.net
This board generally meets the 1st and 3rd Monday of each month.
10
Memorandum
REPORT TO: Planning Board
SUBJECT: Norton Ranch Phase 5 Major Subdivision. Application 21024.
MEETING DATE: March 1, 2021
AGENDA ITEM TYPE: Citizen Advisory Board/Commission
RECOMMENDATION: Having reviewed and considered the application materials, public comment,
and all the information presented, I here adopt the findings presented in the
staff report for application 21024 and move to recommend approval of the
subdivision with conditions and subject to all applicable code provisions.
STRATEGIC PLAN: 4.2 High Quality Urban Approach: Continue to support high-quality planning,
ranging from building design to neighborhood layouts, while pursuing urban
approaches to issues such as multimodal transportation, infill, density,
connected trails and parks, and walkable neighborhoods.
BACKGROUND: This application is to modify conditions of approval and phasing of the
development from the original application of a subdivision (18278) who’s
Findings of Fact were approved on December 15, 2020. The applicant,
Norton Properties LLC is proposing to subdivide 79.3 acres in order to create
148 lots: 124 residential single household, 14 affordable single household
detached lots, 5 common open space lots, 5 City park lots, 4 restricted
development lots, and dedicated right of ways. The developable portion of
the project is 38 acres while the 4 restricted lots are roughly 41 acres. The
developable portion of the project borders West Babcock to the south,
Laurel Parkway to the east, Vaughn Drive to the north, and South Eldorado
Avenue to the west. The four restricted lots, east of Laurel Parkway, are
subject to further subdivision review. These four restricted lots are
considered Phase 6. The changes to the conditions of approval and code
provisions as outlined below is to allow for those four restricted lots to
receive final plat prior to any of the lots within Phase 5. These four restricted
lots will not be able to be developed until further subdivision review.
Phase 5A will includes all 14 affordable housing lots. These affordable
housing lots are expected to be detached 3-bedroom lower priced homes
(10% of the total of 70% AMI). Although all 14 lots are along Boomtown
Road and clustered together, it was deemed an appropriate layout based on
lot size, design placement and the fact that the City receives affordable
housing lots that are oriented onto the street in the first phase of
development.
A large City park is set to be constructed with Phase 5D that contains
wetlands which are planned to be preserved and additional plantings
provided to keep its natural habitat. A trail along the west side of the
11
development is proposed to connect to the existing trails from Norton Ranch
Subdivision Phase 3 to the south to Lakes at Valley West to the north.
The City of Bozeman Department of Community Development received a
preliminary plat application on January 22, 2021, requesting a modification
to the major subdivision as it was approved by City Commission on
December 15, 2020. The application was deemed adequate on February 5,
2021 and review continued. The final decision for a Major Subdivision must
be made within 60 working days of the date it was deemed adequate, or in
this case, by April 6, 2021. The Planning Board is scheduled to review this
application on March 1, 2021. The City Commission is scheduled to review
the preliminary plat and make a decision at their March 9, 2021 public
hearing.
UNRESOLVED ISSUES: None.
ALTERNATIVES: 1. Recommend approval of the application with the recommended
conditions;
2. Recommend approval the application with modifications to the
recommended conditions;
3. Recommend denial of the application based on the Board’s findings of
non-compliance with the applicable criteria contained within the staff
report; or
4. Open and continue the public hearing on the application, with specific
direction to staff or the applicant to supply additional information or to
address specific items.
FISCAL EFFECTS: The development will generate the typical costs and revenues of residential
development.
Attachments:
NortonRanchPhase5PreliminaryPlat_012021.pdf
PhasingExhibit_012021.pdf
A1Form_012121.pdf
21024 PB Staff Report.pdf
Report compiled on: February 22, 2021
12
Phase Open Space (SF) Park (SF) Lots (SF) Total (SF)
5A 0 23,513 263,541 287,054
5B 16,714 112,369 278,348 407,431
5C 0 0 139,118 139,118
5D 2,744 245,507 81,545 329,796
REMAINDER (PH 6) 1,785,060 0 0 1,785,060
R.O.W. 0 0 0 506,018
Total 1,804,518 381,389 762,552 3,454,477
13
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
14
Δ=
Δ=
15
16
17
PROJECT INFORMATION
Project Name:
Project Type(s):
Street Address:
>ĞŐĂůĞƐĐƌŝƉƟŽŶ͗
ĞƐĐƌŝƉƟŽŶŽĨWƌŽũĞĐƚ͗
ƵƌƌĞŶƚŽŶŝŶŐ͗
Gross Lot Area:
ůŽĐŬ&ƌŽŶƚĂŐĞ;ƐͿ͗
EƵŵďĞƌŽĨƵŝůĚŝŶŐƐ͗
dLJƉĞĂŶĚEƵŵďĞƌŽĨǁĞůůŝŶŐƐ͗
ƵŝůĚŝŶŐ^ŝnjĞ;ƐͿ͗
ƵŝůĚŝŶŐ,ĞŝŐŚƚ;ƐͿ͗
EƵŵďĞƌŽĨWĂƌŬŝŶŐ^ƉĂĐĞƐ͗
īŽƌĚĂďůĞ,ŽƵƐŝŶŐ;zͬEͿ͗
ĂƐŚͲŝŶͲůŝĞƵWĂƌŬůĂŶĚ;zͬEͿ͗
ĞƉĂƌƚƵƌĞͬĞǀŝĂƟŽŶZĞƋƵĞƐƚ;zͬEͿ͗
A1
DEVELOPMENT REVIEW APPLICATION
PROJECT IMAGE
Community Development
ĞǀĞůŽƉŵĞŶƚZĞǀŝĞǁƉƉůŝĐĂƟŽŶ Page 1ŽĨ3 ZĞǀŝƐŝŽŶĂƚĞ͗:ƵŶĞϮϬϮϬ
SPECIAL DISTRICTS
KǀĞƌůĂLJŝƐƚƌŝĐƚ͗ EĞŝŐŚďŽƌŚŽŽĚŽŶƐĞƌǀĂƟŽŶ EŽŶĞ
hƌďĂŶZĞŶĞǁĂůŝƐƚƌŝĐƚ͗ ŽǁŶƚŽǁŶ EŽƌƚŚϳƚŚǀĞŶƵĞ EŽƌƚŚĞĂƐƚ EŽƌƚŚWĂƌŬ EŽŶĞ
VICINITY MAP
Norton Ranch Subdivision, Phase 5 - Amended Plat
Preliminary Plat
W/ Babcock Street & Laurel Parkway
Lot R1, Norton East Ranch Subd., Phase 3A; N 1/2 Sec. 9, T2S, R5E
R-2 and R-3 (proposed Remainder Tracts are R-4)
79.3085 acres
Landscaped
N/A
N/A
N/A
N/A
N/A
Yes
No
Yes
Major Subdivision
Lot R1, Norton East Ranch Subd., Phase 3A; N 1/2 Sec. 9, T2S, R5E
18
19
APPLICATION FEE
Varies by project type
CONTACT US
ůĨƌĞĚD͘^ƟīWƌŽĨĞƐƐŝŽŶĂůƵŝůĚŝŶŐ
ϮϬĂƐƚKůŝǀĞ^ƚƌĞĞƚ
ŽnjĞŵĂŶ͕Ddϱϵϳϭϱ
ƉŚŽŶĞϰϬϲͲϱϴϮͲϮϮϲϬ
ĨĂdžϰϬϲͲϱϴϮͲϮϮϲϯ
ƉůĂŶŶŝŶŐΛďŽnjĞŵĂŶ͘ŶĞƚ
ǁǁǁ͘ďŽnjĞŵĂŶ͘ŶĞƚͬƉůĂŶŶŝŶŐ
ĞǀĞůŽƉŵĞŶƚZĞǀŝĞǁƉƉůŝĐĂƟŽŶ Page 3ŽĨ3 ZĞǀŝƐŝŽŶĂƚĞ͗:ƵŶĞϮϬϮϬ
REQUIRED FORMS
Varies by project type
s>KWDEdZs/tWW>/d/KE
ŚĞĐŬĂůůƚŚĂƚĂƉƉůLJ &KZD
1. ĚŵŝŶŝƐƚƌĂƟǀĞ/ŶƚĞƌƉƌĞƚĂƟŽŶƉƉĞĂů /
2. ĚŵŝŶŝƐƚƌĂƟǀĞWƌŽũĞĐƚĞĐŝƐŝŽŶƉƉĞĂů W
3. ŶŶĞdžĂƟŽŶĂŶĚ/ŶŝƟĂůŽŶŝŶŐ EEy
4. ŽŵŵĞƌĐŝĂůͬEŽŶƌĞƐŝĚĞŶƟĂůK K
5. ŽŵƉƌĞŚĞŶƐŝǀĞ^ŝŐŶWůĂŶ ^W
6. ŽŶĚŽŵŝŶŝƵŵZĞǀŝĞǁ Z
7. ŽŶĚŝƟŽŶĂůhƐĞWĞƌŵŝƚ hW
8. džƚĞŶƐŝŽŶƚŽƉƉƌŽǀĞĚWůĂŶ yd
9. 'ƌŽǁƚŚWŽůŝĐLJŵĞŶĚŵĞŶƚ 'W
10. /ŶĨŽƌŵĂůZĞǀŝĞǁ /E&
11. DĂƐƚĞƌ^ŝƚĞWůĂŶ D^W
12. DŽĚŝĮĐĂƟŽŶͬWůĂŶŵĞŶĚŵĞŶƚ DK
13. EĞŝŐŚďŽƌŚŽŽĚͬZĞƐŝĚĞŶƟĂůK EK
14. WƌĞͲĂƉƉůŝĐĂƟŽŶŽŶƐƵůƚĂƟŽŶ EŽŶĞ
15. WhŽŶĐĞƉƚWůĂŶ Wh
FORM
16. WhWƌĞůŝŵŝŶĂƌLJWůĂŶ WhW
17. Wh&ŝŶĂůWůĂŶ Wh&W
18. ZĞĂƐŽŶĂďůĞĐĐŽŵŵŽĚĂƟŽŶ Z
19. ^ŝƚĞWůĂŶ ^W
20. ^ƉĞĐŝĂůhƐĞWĞƌŵŝƚ ^hW
21. ^ƉĞĐŝĂůdĞŵƉŽƌĂƌLJhƐĞWĞƌŵŝƚ ^dhW
22. ^ƵďĚŝǀŝƐŝŽŶdžĞŵƉƟŽŶ ^
23. ^ƵďĚŝǀŝƐŝŽŶWƌĞͲƉƉůŝĐĂƟŽŶ W
24. ^ƵďĚŝǀŝƐŝŽŶWƌĞůŝŵŝŶĂƌLJWůĂŶ WW
25. ^ƵďĚŝǀŝƐŝŽŶ&ŝŶĂůWůĂƚ &W
26. tĞƚůĂŶĚZĞǀŝĞǁ tZ
27. ŽŶĞDĂƉŵĞŶĚŵĞŶƚ D
28. ŽŶĞdĞdžƚŵĞŶĚŵĞŶƚ d
29. ŽŶŝŶŐͬ^ƵďĚŝǀŝƐŝŽŶsĂƌŝĂŶĐĞ ͬ^sZ
30. ŽŶŝŶŐĞǀŝĂƟŽŶͬĞƉĂƌƚƵƌĞ EŽŶĞ
31. KƚŚĞƌ͗
APPLICATION TYPE
20
Page 1 of 28
21024, Planning Board Staff Report for the Norton Ranch Ph 5 Subdivision
Public Hearing Date: Planning Board, March 1, 2021 at 6:00 pm. Via WebEx.
City Commission, March 9, 2021 at 6:00pm. Via WebEx.
Project Description: A modification to the phasing and conditions of approval of a
preliminary plat application that was approved November 17, 2020. The
subdivision is on 79.3 acres to create 148 lots: 124 residential single household,
14 affordable single family detached housing lots, 5 common open space lots, 5
city park lots, 4 restricted lots and dedicated right of way. The subject property is
zoned R-2, R-3, and R-4.
Project Location: The subject parcel is located north and west of the intersection of
West Babcock Street and Laurel Parkway. It is legally described as Lot R1,
Norton East Ranch Subdivision Phase 3A, SEC. 9, T. 2 S., R. 5, City of
Bozeman, Gallatin County, Montana.
Recommendation: Approval with conditions and code requirements
Preliminary Plat Recommended Motion: Having reviewed and considered the
application materials, public comment, and all the information presented, I hereby
adopt the findings presented in the staff report for application 21024 and move to
recommend approval of the subdivision with conditions and subject to all
applicable code provisions.
Report Date: February 22, 2021
Staff Contact: Sarah Rosenberg, Associate Planner
Griffin Nielsen, Engineer
Agenda Item Type: Action (Quasi-judicial)
EXECUTIVE SUMMARY
Unresolved Issues
None.
Project Summary
This application is to modify conditions of approval and phasing of the development
from the original application of a subdivision (18278) who’s Findings of Fact were
approved on December 15, 2020. The applicant, Norton Properties LLC is proposing to
subdivide 79.3 acres in order to create 148 lots: 124 residential single household, 14
affordable single household detached lots, 5 common open space lots, 5 City park lots,
21
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 2 of 28
4 restricted development lots, and dedicated right of ways. The developable portion of
the project is 38 acres while the 4 restricted lots are roughly 41 acres. The developable
portion of the project borders West Babcock to the south, Laurel Parkway to the east,
Vaughn Drive to the north, and South Eldorado Avenue to the west. The four restricted
lots, east of Laurel Parkway, are subject to further subdivision review. These four
restricted lots are considered Phase 6. The changes to the conditions of approval and
code provisions as outlined below is to allow for those four restricted lots to receive final
plat prior to any of the lots within Phase 5. These four restricted lots will not be able to
be developed until further subdivision review.
Phase 5A will includes all 14 affordable housing lots. These affordable housing lots are
expected to be detached 3-bedroom lower priced homes (10% of the total of 70% AMI).
Although all 14 lots are along Boomtown Road and clustered together, it was deemed
an appropriate layout based on lot size, design placement and the fact that the City
receives affordable housing lots that are oriented onto the street in the first phase of
development.
A large City park is set to be constructed with Phase 5D that contains wetlands which
are planned to be preserved and additional plantings provided to keep its natural
habitat. A trail along the west side of the development is proposed to connect to the
existing trails from Norton Ranch Subdivision Phase 3 to the south to Lakes at Valley
West to the north.
The City of Bozeman Department of Community Development received a preliminary plat
application on January 22, 2021, requesting a modification to the major subdivision as it
was approved by City Commission on December 15, 2020. The application was deemed
adequate on February 5, 2021 and review continued. The final decision for a Major
Subdivision must be made within 60 working days of the date it was deemed adequate,
or in this case, by April 6, 2021. The Planning Board is scheduled to review this application
on March 1, 2021. The City Commission is scheduled to review the preliminary plat and
make a decision at their March 9, 2021 public hearing.
Alternatives
1. Recommend approval of the application with the recommended conditions;
2. Recommend approval the application with modifications to the recommended
conditions;
3. Recommend denial of the application based on the Board’s findings of non-
compliance with the applicable criteria contained within the staff report; or
4. Open and continue the public hearing on the application, with specific direction to
staff or the applicant to supply additional information or to address specific items.
22
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 3 of 28
TABLE OF CONTENTS
EXECUTIVE SUMMARY ................................................................................................. 1
Unresolved Issues ................................................................................................ 1
Project Summary .................................................................................................. 1
Alternatives ........................................................................................................... 2
SECTION 1 - MAP SERIES ............................................................................................ 4
SECTION 2 - RECOMMENDED CONDITIONS OF APPROVAL .................................... 6
SECTION 3 - CODE REQUIREMENTS REQUIRING PLAT CORRECTIONS ............. 12
SECTION 4 - RECOMMENDATIONS AND FUTURE ACTIONS .................................. 17
SECTION 5 - STAFF ANALYSIS AND FINDINGS .................................................... 1718
Applicable Subdivision Review Criteria, Section 38.240.130, BMC. ............... 1718
Primary Subdivision Review Criteria, Section 76-3-608 ................................. 1920
Preliminary Plat Supplements......................................................................... 2324
APPENDIX A –PROJECT SITE ZONING AND GROWTH POLICY ......................... 2627
APPENDIX B – NOTICING AND PUBLIC COMMENT ............................................ 2728
APPENDIX C - OWNER INFORMATION .................................................................. 2728
FISCAL EFFECTS ........................................................................................................ 28
ATTACHMENTS ........................................................................................................... 28
23
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 4 of 28
SECTION 1 - MAP SERIES
Zoning Map of Subject Property
24
Page 5 of 28
Plat of overall development
25
Page 6 of 28
SECTION 2 - RECOMMENDED CONDITIONS OF APPROVAL
Please note that these conditions are in addition to any required code provisions
identified in this report. This application proposes phases. Unless a condition is specific
to an individual phase, all comments and code requirements apply to any final plat of all
phases.
This is to modify conditions of approval and phasing. This list of conditions of approval
below were previously established by findings of fact dated December 15, 2020 unless
indicated by editing marks. Those conditions are of repeated for clarity is to maintain a
list of all of the conditions of approval and code provisions related to this project.
Recommended Conditions of Approval:
1. The applicant is advised that unmet code provisions, or code provisions that
are not specifically listed as conditions of approval, does not, in any way,
create a waiver or other relaxation of the lawful requirements of the Bozeman
Municipal Code or state law.
2. The plat shall conform to all requirements of the Bozeman Municipal Code
and the Uniform Standards for Subdivision Plats (Uniform Standards for
Certificates of Survey and Subdivision Plats 24.183.1104 ARM) and shall be
accompanied by all required documents, including certification from the City
Engineer that as-built drawings for public improvements were received, a
platting certificate, and all required and corrected certificates. The Final Plat
application shall include three (3) signed reproducible copies on a 3 mil or
heavier stable base polyester film (or equivalent); two (2) digital copies; one
(1) PDF copy; and five (5) paper prints. The Gallatin County Clerk &
Recorder’s office has elected to continue the existing medium requirements of
2 mylars with a 1½” binding margin on one side for both plats and COS’s.
The Clerk and Recorder will file the new Conditions of Approval sheet as the
last same sized mylar sheet in the plat set.
3. The final plat must provide all necessary utility easements and must be
described, dimensioned and shown on each subdivision block of the final plat
in their true and correct location.
4. Any public access easement for the common open spaces must be provided
as a separate document describing the scope of the grant of easement and
naming a custodian of the public’s interest in the easement.
5. Per BMC Section 38.220.070.A.2, prior to final plat approval, a memorandum
of understanding must be entered into by the weed control district and the
developer. The memorandum of understanding must be signed by the county
weed control district and the developer prior to final plat approval, and a copy
26
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 7 of 28
of the signed document must be submitted to the community development
department with the application for final plat approval.
6. This notation must be included on the conditions of approval sheet of the final
plat: “Ownership of all common open space areas and trails, and
responsibility of maintenance thereof and for city assessments levied on the
common open space lands shall be that of the property owners’ association.
Maintenance responsibility shall include, in addition to the common open
space and trails, all vegetative ground cover, boulevard trees and irrigation
systems in the public right-of-way boulevard strips along all external perimeter
development streets and as adjacent to public parks or other common open
space areas. All areas within the subdivision that are designated herein as
common open space including trails are for the use and enjoyment by
residents of the development and the general public. The property owners’
association shall be responsible for levying annual assessments to provide for
the maintenance, repair, and upkeep of all common open space areas and
trails. At the same time of recording the final plat of the subdivision the
subdivider shall transfer ownership of all common open space areas within
each phase to the property owners’ association created by the subdivider to
maintain all common open space areas within Norton Ranch Phase 5
subdivision.”
7. Extension of the Duration of the preliminary plat approval is limitedwill not be
granted if the preliminary plat approval has expired, per BMC 38.240.130.A.5.f.
To obtain an Prior to any extension of the preliminary plat approval, the
intersection of Laurel Parkway and Durston Road must either be upgraded with
a signal or roundabout with design approved the City’s Engineering Division, or
the applicant must provide an updated traffic impact study at the time of
extension request indicating the intersection level-of-service standards can be
met per BMC 38.400.060.B.4.
8. BMC 38.400.070. Subdivision lighting special improvement lighting district
(SILD) information must be submitted to the City in hard copy and digital form.
Any final plat application will not be deemed complete until the resolution to
create the SILD has been approved by the City Commission. The initial
adoption of the special improvement lighting district shall include the entire
area of the preliminary plat. (moved to Code Provisions number 28)
9.8. Per Code Section 38.350.060 fences located in the rear or side setback of
properties adjoining any city linear park must have a maximum height of four
feet. This standard must be added as a note listed on the conditions of
approval sheet of the plat. Properties on Block 21, Lot 2-8 AND Block 27, lots
1 and 2 are affected by this code requirement.
27
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 8 of 28
10.9. Codes, Covenants & Restrictions must be updated for Phase 5 and submitted
with initial final plat to be recorded after approval.
11.10. The applicant must include a note on the conditions of approval sheet of the
final plat that states that maintenance of all stormwater facilities, including
stormwater facilities within the park parcel, is the responsibility of the property
owners’ association (POA).
12.11. The approved affordable housing plan must be recorded concurrent with the
final plat and a reference to the recorded document must be provided on the
conditions of approval page of the final plat. The reference on the conditions
of approval sheet must be “This subdivision is subject to affordable housing
requirements. The subdivision’s requirements and obligations can be found in
the Norton East Ranch, Phase 5 Affordable Housing Plan recorded as
document no.___________ at the Gallatin County Clerk and Recorders
Office.”
13.12. BMC 38.420.020.D. Park easements provided for future phases do not
transfer maintenance responsibilities to the Parks Department. The Parks
Department will assume maintenance responsibility upon future phase final
plat and final acceptance of improvements. This responsibility must be
indicated in the certificate of dedication on the final plat. A note indicating this
should be placed on the conditions of approval sheet of the final plat.
14.13. BMC 38.220.070.A.6.g. Prior to final plat for subsequent phases, parkland
compliance per each sub phase of Phase 5 must also be shown in the
Parkland Tracking Table as required in Section 38.420.020 BMC and be
placed on the conditions of approval sheet of the final plat. On Preliminary
Plat page 3 and Park Plan L100, consolidate the Parkland tracking table
displaying the same phase and zoning district lot sizes together in one row.
Add a row with details about when the Park Master Plan was approved and a
row that gives the total cost of improvements being constructed. If an
improvements agreement will be requested, please indicate that within the
table. The table shall explicitly state how much parkland credit was allocated
for each lot within this phase. This table shall include but not be limited to
listing all dedicated parkland requirements, parkland or parkland credits and
areas not credited towards parkland (i.e., detention/retention areas,
watercourse setbacks, wetlands, common open space, parking facilities) and
the total area of each.
15.14. BMC 38.220.070.A.7. Ensure that a Conservation Easement between Norton
Ranch Properties, LLC and the US Army Corps of Engineers within the City
park parcel is transferred to the City of Bozeman with the final plat.
28
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 9 of 28
16.15. BMC 38.220.020 & 38.610.050. Prior to final plat of phases 5C and 5D, the
applicant must provide the Community Development Department with a
written statement of a wetland boundary determination from the U.S. Army
Corps of the wetland status. If the wetlands are determined to be
jurisdictional, an approved 404 permit for any changes to the wetland must be
submitted to the Community Development office prior to final plat approval.
17.16. If not already filed, the applicant must provide and file with the County Clerk
and Recorder's office executed Waivers of Right to Protest Creation of
Special Improvement Districts (SID’s) for the following:
a. Street improvements to Cottonwood Road including paving,
curb/gutter, sidewalk, and storm drainage;
b. Street improvements to Laurel Parkway including paving, curb/gutter,
sidewalk, and storm drainage;
c. Street improvements to West Babcock including paving, curb/gutter,
sidewalk, and storm drainage;
d. Street improvements to Durston Road including paving, curb/gutter,
sidewalk, and storm drainage;
e. Street improvements to Gooch Hill Road including paving, curb/gutter,
sidewalk, and storm drainage;
f. Intersection improvements to Laurel Parkway and Durston;
g. Intersection improvements to Laurel Parkway and West Babcock
Street;
h. Intersection improvements to Laurel Parkway and Huffine Lane;
i. Intersection improvements to Cottonwood Road and Huffine Lane; and
j. Intersection improvements to Cottonwood Road and West Babcock
Street.
The document filed must specify that in the event an SID is not utilized for the
completion of these improvements, the developer agrees to participate in an
alternate financing method for the completion of these improvements on a fair
share, proportionate basis as determined by square footage of property,
taxable valuation of the property, traffic contribution from the development, or
a combination thereof. The applicant must provide a copy of the filed SID
waiver prior to final plat approval.
18.17. A 1 foot “No Access” strip shall be placed along the West Babcock frontage
for the full length of the development.
19.18. A 1 foot “No Access” strip shall be placed along the Laurel Parkway frontage
Block 16 of the development.
29
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 10 of 28
20.19. A 1 foot “No Access” strip shall be placed along the Gooseberry Drive
frontage of Lot 11 Block 22 of the development.
21.20. The applicant must include a note on the plat as follows, “This is a known
area of high groundwater. No crawl spaces or basements may be
constructed. Sump pumps are not allowed to be connected to the sanitary
sewer system. Sump pumps are not allowed to be connected to the storm
drainage system. Water from sump pumps may not be discharged onto
streets, or into the curb and gutters where they create a safety hazard for
pedestrians and vehicles.”
22.21. The subject property is located in an area with high groundwater with
potentially corrosive soils, which can increase the likelihood of water main
failure over the lifespan of the asset. The applicant must perform a corrosivity
analysis to determine if cathodic protection is required for the proposed
distribution mains.
23.22. The applicant must add a note to the conditions of approval sheet of the plat
that all stormwater infrastructure located outside of the public right-of-way
must be maintained by the property owners’ association (POA).
24.23. The applicant must provide a drain tile maintenance plan for the existing tile
drain along Fallon Street to the City Engineering Division for approval and
include the maintenance plan in the POA documents prior to final plat
approval of any plan within Phase 5. The plan must include the long term
maintenance instructions for the POA and an exhibit clearly showing the
location and detail for the tile drain.
25.24. BMC 38.220.060.A.1. Street names must be reviewed and approved by the
County’s geographic information systems and City Engineering Department
prior to final plat approval. The applicant must submit written approval from
both entities with the final plat application.
26.25. The stormwater design assumes a flow rate from the infiltration of
groundwater water. No data has been provided to justify this flow rate. Prior to
completion and acceptance of the stormwater design the infiltration of the flow
rate must be verified during the period of seasonal high groundwater. If the
flow rate exceeds the assumed value, the system must be altered to ensure
all City drainage standards are met. Verification may not take place while
dewatering is in operation. The applicant must send verification to the
Community Development Office before final plat approval.
27.26. The applicant must submit plans and specifications for water and sewer main
extensions, streets, and storm water improvements, prepared and signed by
a professional engineer (PE) registered in the State of Montana, which must
30
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 11 of 28
be provided to and approved by the City Engineer. Water and sewer plans
must also be approved by the Montana Department of Environmental Quality.
The applicant must also provide professional engineering services for
construction inspection, post-construction certification, and preparation of
mylar record drawings. Construction shall not be initiated on the public
infrastructure improvements until the plans and specifications have been
approved and a preconstruction conference has been conducted. Building
permits will not be issued prior to City acceptance of the infrastructure
improvements per BMC Section 38.270.030.B.
28.27. The applicant must contact the Gallatin County Conservation District,
Montana Department of Environmental Quality, and U.S. Army Corps of
Engineers regarding the proposed project and any required permits (i.e., 310,
404, Turbidity exemption, etc.) must be obtained by the applicant.
29.28. The complete right-of-way for Laurel Parkway from West Babcock to the
existing northern section boundary must be dedicated with the initial phase
first phase of the subdivision.
30.29. A temporary Temporary stormwater easements must be provided for the
stormwater pond supporting Laurel Parkwayponds not located within a
common open space lot. The easement language must be approved by the
City of Bozeman and the executed easements recorded dedicated with the
final plat.
30. A separate lot must be created for the Norton Ranch Lift Station. The lot must
be transferred to the City at the time of final plat to enable the long term
access, maintenance, and operation of the station.
31. As proposed the City’s minimum length of tangency at intersection cannot be
met with the proposed public street easement between lots R1A and R1C.
The easement and lots must be adjusted to ensure the City’s minimum street
standard can be met.
31.32. A minimum of a 12 foot all weather access ramp designed to support
maintenance vehicles must be constructed to the stormwater pond at the
northwest corner of the site. The access must be reviewed and approved with
the subdivision infrastructure plans.
32.33. A sixty foot wide Public Street and Utility Easements must be provided on
Lots R1A, R1B, R1C, and R1D. The easement must be centered on the lot
lines and extend the full width of the lots. These easements must be provided
at final plat with a separate document which contains the City’s standard
public street and utility easement language. Upon future subdivision of Lots
R1A-R1D, the easement may to be revised to ensure compliance with the
City’s street and block length standards.
31
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 12 of 28
33.34. A lot restriction note for Lots R1A, R1B, R1C, and R1D must be provided on
the final plat that states the following: Notice is hereby given to all potential
purchasers of Lots R1A, R1B, R1C, and R1D of the Norton Ranch Phase 5
Subdivision, City of Bozeman, Gallatin County Montana, that the final plat of
the subdivision was approved by the Bozeman City Commission without
completion of on and off-site improvements required under the Bozeman
Municipal Code as is allowed in Article 38.270.030. As such, the restriction is
filed with the final plat that stipulates that any use of these lots is subject to
further subdivision or zoning development review and no development of
these lots shall occur until all on and off-site improvements are completed as
required under the BMC. Therefore, be advised that building permits will not
be issued for Lots R1A, R1B, R1C, and R1D of the Norton Ranch Phase 5
Subdivision until all required on and off-site improvements are completed and
accepted by the City of Bozeman. No building or structures requiring water or
sewer facilities shall be utilized on these lots until this restricted is lifted. This
restriction runs with the land and is revocable only by further subdivision or
the written consent of the City of Bozeman.
35. Linear Park 5B 5C and 5D and all improvements within it must be completed
with Phase 5A.
34.36. The Property Owner Covenants cannot exclude accessory dwelling units and
duplexes from the allowable uses. The City must be a party to the covenant.
SECTION 3 – REQUIRED CODE PROVISIONS
1. BMC 38.220.300 and 310. The property owners’ association (POA)
documents must be finalized and recorded with the initial final plat within
Phase 5 of the entire property. The POA documents must include the
requirements of Section 38.220.300 and 38.220.320.
2. BMC 38.220.070.A.8 Final plat review. The applicant must submit with the
application for Final Plat review and approval, a written narrative stating how
each of the conditions of preliminary plat approval and noted code provisions
have been satisfactorily addressed, and must include a digital copy (pdf) of
the entire Final Plat submittal. This narrative must provide sufficient detail to
direct the reviewer to the appropriate plat, plan, sheet, note, covenant, etc. in
the submittal.
3. BMC 38.220.020.A & 38.610.010. The applicant must provide the community
development department with a copy of all required streambed, streambank
or wetlands permits or written notification from the appropriate agency the
status of the wetland jurisdiction determination whether or not a 404 permit is
required prior to the commencement to final plat approval of PHASES 5C and
5D.
32
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 13 of 28
4. BMCSection 38.400.010.A.2. Laurel Parkway is a collector street as identified
in the City’s transportation master plan. Laurel Parkway must be fully
constructed completed to ensure the convenient and reliable movement of
traffic and effective access for emergency services. Laurel Parkway must be
constructed from Durston the northern property line of the subdivision West
Babcock prior to final plat approval of Phase 5A of the subdivision or the future
subdivision or site development of lots within Phase 6. This section of Laurel
Parkway must be guaranteed with an improvements agreement in order to
receive final plat approval for Phase 6.
5. BMC 38.400.010.A. Parking must be restricted at all locations where the
City’s Design Standards and Specification Policy (DSSP) minimum for Length
of Tangency at Intersection has been deviated from and stopping sight
distance cannot be met with the presents of parked vehicles.
6. BMC 38.400.010.A. STOP signs are required at all location where the City’s
DSSP minimum for Length of Tangency at Intersection has been deviated
from on non-through streets.
7. BMC 38.420.022.D. A Park easement throughout Phase 5 is required with the
approval of the first phase within Phase 51.
8. BMC 38.220.320.A.5 Common area and facility maintenance plan. The
developer must submit a legal instrument setting forth a plan providing for the
permanent care and maintenance of common areas and facilities. The same
must be submitted to the city attorney and must not be accepted by the city
until approved as to legal form and effect. Common areas and facilities must
be deeded to a POA and, the applicant must record the proposed documents
governing the association at the time of final plat filing of any phase within
Phase 5.
9. BMC 38.380.100.A Affordable housing plan as binding agreement. An
affordable housing plan approved by the city will be considered is a binding
contract between the developer and the developer's successors in interest to
the lot or dwelling. Such plan will be included in a separate recorded written
agreement between the developer and the city, or incorporated into another
recorded document wherein the developer is required to implement the
affordable housing plan. The affordable housing plan and associated written
agreement must be recorded at the time of final plat approval of any phase
within Phase 5.
10. BMC 38.380.100.E Approval of affordable housing plan. The affordable
housing plan will be reviewed as part of the initial application approval
process for the type of development proposed. A condition shall be attached
to the approval of any subdivision plat or site plan to require recordation of the
33
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 14 of 28
affordable housing plan or other separate agreement obligating the developer
to meet the requirements of this article. Per this section see recommended
condition number 1 related to affordable housing.
11. BMC 38.240.150.A.3.d Transfer of ownership of public land, off-site land,
private land, personal property, improvements and water rights; documents
required.
a. For the transfer of real property in satisfaction of required or offered
dedications to the city, and required or offered donations or grants to the
POA, the subdivider or owner of the property must submit with the
application for final plat a warranty deed or other instrument acceptable to
the city attorney transferring fee simple ownership to the city or the POA.
b. For the transfer of personal property installed upon dedicated parkland or
city-owned open space, or POA-owned parkland or open space, the
subdivider must provide the city an instrument acceptable to the city
attorney transferring all its rights, title and interest in such improvements
including all applicable warranties to such improvements to the city or the
POA.
c. The subdivider or owner of the property must record the deed or
instrument transferring ownership or interests at the time of recording of
the final plat with the original of such deed or instrument returned to the
city or POA as applicable.
d. For the transfer of ownership interest in water, the subdivider or owner of
the property must submit with the application for final plat a deed or other
instrument acceptable to the city attorney transferring ownership to the city
or POA, along with all required state department of natural resources and
conservation documentation, certification and authorization.
12. BMC 38.240.450 requires a certificate of completion of improvements. The
certificate must specifically list all installed improvements and financially
guaranteed improvements.
13. BMC 38.240.520 Where non-public improvements are to be installed prior to
final plat approval, the final plat of subdivision must contain a certificate of
completion of non-public improvements. A certificate for all improvements
related to the perimeter street landscaping and irrigation, stormwater
improvements and open space lot landscaping and irrigation must be
provided on the final plat.
14. BMC 38.240.530. When irrigation of public facilities are to be installed prior to
final plat approval, the final plat of subdivision must contain a certificate of
34
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 15 of 28
completion of water-related improvements. The certificate must list all
completed and accepted improvements, including but not limited to all
irrigation system record drawings. The subdivision proposes irrigation of
public street frontage and city parkland. This certificate must be provided on
the final plat.
15. BMC 38.270.030 requires that all improvements to be dedicated to the public,
such as water mains, sewer mains, parkland and related improvements, and
public streets, must be financially guaranteed by an improvements agreement
or installed in accordance with the approved plans and specifications by the
developer, and certified by a registered professional civil engineer, licensed in
the state of Montana, and accepted by the city prior to the approval of the
final plat, building permit, issuance of a certificate of occupancy or other
identified benchmark as may be appropriate.
16. BMC 38.420.090. Statements regarding waiver of right to protest the creation
of the parks and trails district and indicating that parkland is maintained by the
POA may be removed from the plat and covenants, with the exception of the
comments regarding retention ponds.
17. BMC 38.550.070. In accordance with the requirements of this section,
installation by the developer of vegetative ground cover, boulevard trees, and
irrigation system in the public right-of-way boulevard strips on perimeter
streets and in and adjacent to City park lots and all open space lots is
required prior to final plat approval.
18. BMC 38.410.060. A City standard sewer easement must be provided for the
proposed sanitary sewer connection along the northern property at any point
where the sewer line is less than nine feet from the edge of public right-of-
way (ROW) or if the access to a manhole falls outside of the public ROW. No
easement has been shown on the plat. Additionally, the 10 foot front yard
utility easement must be provided along the park and may not be placed
within the sewer easement. The 10 foot utility easement must start from the
edge of the ROW or sewer easement, whichever is greater and extend 10
feet into the property.
19. BMC 38.410.060. A drainage easement must executed and recorded for the
stormwater pond outlet pipe from where the pipe leaves the subject property
to the discharge point into Aajker Creek. This easement must be provided
prior to the subdivision’s infrastructure approval. The easement must allow for
the long term access and maintenance of the pipe by the POA and access by
City staff to verify the pipe is being maintained.
35
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 16 of 28
20. BMC 38.410.060. The City standard 10 foot utility easement must be
extended along the western and eastern parks where the park fronts on
public ROW. This easement must be shown on the final plat.
21. BMC 38.410.070.A. The Norton Ranch Lift Station has been designed to be
reconfigured to allow for phased development of the Norton Ranch
Subdivision. The exact configuration is dependent on the phase and number
of dwelling units to be served. Currently, there are three pumps at the lift
station with a single principal pump that can operate under different hydraulic
conditions that the station experiences, specifically column separation after
pumping cycles. Montana Department of Environmental Quality (DEQ)
Circular 2 requires that multiple pumps must be provided and of the same
size. Units must have capacity such that, with any unit out of service, the
remaining units will have capacity to handle the design peak hour flow. The
station does not satisfy DEQ firm capacity requirements. The lift station must
be upgraded prior to final plat approval for any phase within Phase 5.
22. BMC 38.410.070.A. 12 foot all weather access must be provided to each
manhole proposed outside of the public right-of-way, specifically sanitary
sewer along the northern property boundary. The existing asphalt pathway is
not intended to support the loading from a City vacuum truck. The applicant
must provide a pavement design report for the pathway demonstrating the
necessary section required to support a City vacuum truck and upgrade the
pathway as need. This report must be provided with the infrastructure
submittal for the subdivision.
23. BMC 38.410.080.A. The proposed stormwater discharge from the detention
pond on the northwest corner of the development is located off-site. The
applicant must obtain an easement from the adjacent property owner for the
off-site discharge prior to final plat approval of any phase within Phase 5.
24. BMC 38.410.080.A. The subdivision is responsible for maintaining the
stormwater system. A stormwater maintenance plan must be reviewed and
approved with the infrastructure submittal. The approved plan must then be
incorporated into the POA documents and a copy of the POA documents
demonstrating inclusion of the stormwater maintenance must be provided to
the Community Development Division prior to final plat approval of any phase
within Phase 5.
25. BMC 38.410.080.A. 12 foot all weather access must be provided to each
stormwater manhole proposed outside of the public ROW and extend into all
proposed ponds.
36
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 17 of 28
26. BMC 38.410.130. The applicant must contact the City Engineering
Department (Brian Heaston) for an analysis of cash in lieu of water rights and
pay any cash in lieu of water rights due prior to final plat approval.
27. BMC 38.400.040.A.2. Street names must be reviewed and approved by the
County’s geographic information systems and City Engineering Department
prior to final plat approval. The applicant must submit written approval from
both entities with the final plat application.
28. BMC 38.400.070. Subdivision lighting special improvement lighting district
(SILD) information must be submitted to the City and the district formed after
preliminary plat approval in hard copy and digital form. Any final plat
application for Phase 5 will not be deemed complete until the resolution to
create the SILD has been approved by the City Commission. The initial
adoption of the special improvement lighting district shall include the entire
area of the preliminary plat.
28.29. BMC 38.220.060.A.1. A jurisdictional determination for the wetlands located
within Phase 5 must be obtained from the US Army Corp of Engineers prior to
infrastructure approval and final plat approval for phases 5B, 5C, or 5D of the
subdivision. The determination must be provided to the City prior to
infrastructure design approval.
SECTION 4 - RECOMMENDATIONS AND FUTURE ACTIONS
The DRC determined that the application was adequate for continued review and
recommended approval with conditions on February 5, 2021.
The Planning Board will conduct a public hearing to review the preliminary plat and
make a recommendation to the City Commission. The public hearing date for the
Planning Board is on March 1, 2021 at 6:00pm via WebEx.
The public hearing date for the City Commission is on March 9, 2021 at 6:00pm via
WebEx.
SECTION 5 - STAFF ANALYSIS AND FINDINGS
Analysis and resulting recommendations are based on the entirety of the application
materials, municipal codes, standards, and plans, public comment, and all other
materials available during the review period. Collectively this information is the record of
the review. The analysis is a summary of the completed review.
Applicable Subdivision Review Criteria, Section 38.240.130, BMC.
In considering applications for subdivision approval under this title, the advisory boards
and City Commission shall consider the following:
37
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 18 of 28
1) Compliance with the survey requirements of Part 4 of the Montana Subdivision
and Platting Act
The preliminary plat has been prepared in accordance with the survey requirements of
the Montana Subdivision and Platting Act by a Professional Engineer registered in the
State of Montana. As noted in recommended condition of approval number 2, the final
plat must comply with State statute, Administrative Rules of Montana, and the Bozeman
Municipal Code.
2) Compliance with the local subdivision regulations provided for in Part 5 of the
Montana Subdivision and Platting Act
The final plat shall comply with the standards identified and referenced in the Bozeman
Municipal Code (BMC). The applicant is advised that unmet code provisions, or code
provisions that are not specifically listed as a condition of approval, does not, in any way,
create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal
Code or State law. Sections 2 and 3 of this report identify conditions and code
requirements necessary to meet all regulatory standards. Therefore, upon satisfaction of
all conditions and code corrections the subdivision will comply with the local subdivision
regulations.
3) Compliance with the local subdivision review procedures provided for in Part 6
of the Montana Subdivision and Platting Act
The City of Bozeman Department of Community Development received a preliminary plat
application on January 22, 2021, requesting a modification to the major subdivision as it
was approved by City Commission on December 15, 2020. The application was deemed
adequate on February 5, 2021 and review continued. The final decision for a Major
Subdivision must be made within 60 working days of the date it was deemed adequate,
or in this case, by April 6, 2021. The City Commission is scheduled to review the
preliminary plat and make a decision at their March 9, 2021 public hearing.
The hearings before the Planning Board and City Commission have been properly noticed
as required by the Bozeman Municipal Code. Based on the recommendation of the DRC
and other applicable review agencies, as well as any public testimony received on the
matter, the Planning Board shall forward a recommendation to the City Commission who
will make the final decision on the applicant’s request.
The final decision for a Major Subdivision Preliminary Plat with more than 50 lots must be
made within 60 working days of the date it was deemed adequate. Pursuant to BMC
38.240.130.A.5.a(4), the City Commission must approve, conditionally approve or deny
the subdivision application by April 6, 2021, unless there is a written extension from the
developer, not to exceed one year.
Public notice for this application was given as described in Appendix C.
38
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 19 of 28
On February 22, this major subdivision staff report was completed and forwarded with a
recommendation of conditional approval for consideration by the Planning Board.
4) Compliance with Chapter 38, BMC and other relevant regulations
Based on review of the DRC and the Department of Community Development all
applicable regulations appear to be met if all code requirements are satisfied. Pertinent
code provisions and site specific requirements are included in this report for consideration
in Sections 2 and 3.
5) The provision of easements to and within the subdivision for the location and
installation of any necessary utilities
All easements, existing and proposed, must be accurately depicted and addressed on the
final plat and in the final plat application. Therefore, all utilities and necessary utility
easements will be provided and depicted accordingly on the final plat. All city utilities will
be located within dedicated street right of ways. Conditions 3 and code requirement 20
require performance of these obligations.
6) The provision of legal and physical access to each parcel within the
subdivision and the notation of that access on the applicable plat and any
instrument transferring the parcel
All of the proposed lots have frontage to proposed public streets required to be
constructed to City standards per BMC 38.400 and associated design standards. In
addition, pursuant to BMC 38.400.090.A, plats must contain a statement requiring lot
accesses to be built to the standard contained in this section, the city design standards
and specifications policy, and the City modifications to state public works standard
specifications.
Primary Subdivision Review Criteria, Section 76-3-608
1) The effect on agriculture
This subdivision will not impact agriculture on the site. The subject property is
designated as residential according to the City of Bozeman Community Plan. The area
is zoned for residential and has been annexed but is vacant. The buildable portion of
the proposed subdivision is entirely residential. No viable farm units exist on the
property. The subdivision will not have adverse effects on agriculture.
2) The effect on Agricultural water user facilities
This subdivision will not impact agricultural water user facilities. There are no active
agricultural water use facilities located within the development. The area is zoned for
residential and has been under development for many years.
39
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 20 of 28
3) The effect on Local services
Water/Sewer – Municipal water and sewer mains exist in the adjacent street rights of
way of Babcock Street to serve the development. The subdivider proposes to extend
water and sewer mains throughout the development and to the individual lots within the
subdivision. These internal water and sewer mains will be installed or guaranteed prior
to final plat approval. The Norton Ranch Lift station must be upgraded prior to any final
plat approval for any phase within Phase 5 and a separate lot must be created for the
station as outlined in condition of approval number 30 and code provision number 21.
The applicant must provide transfer of ownership of the irrigation facility to the property
owners’ association (POA) so that the POA can legally have the water resources
necessary to maintain the open space. Irrigation facilities to support the proposed parks
must be transferred to the City.
Condition of approval number 26 and code provisions 18, 19, and 20 outline the
required completion of easements and physical installation of water and sewer mains.
Cash in lieu of water rights is required to provide long term water to the project. Code
provision 26 applies to this issue.
Streets – The Growth Policy and subdivision standards require adequate connectivity of
the street grid to ensure sufficient infrastructure to serve the needs of the public and
alleviate congestion. The preliminary plat layout utilizes West Babcock Street, a
collector, and Vaughn Drive, a local street, to provide east west connectivity and Laurel
Parkway, a collector, provides north to south connectivity. Other internal local streets
provide access to all lots. The project is well connected and meets block length
requirements with the proposed streets and pedestrian midblock crossings.
With the initial application (18278), Laurel Parkway was proposed by the developer to
be constructed in two phases which was not in compliance with code requirements. The
City Commission heard the item on November 17, 2020 and required that the applicant
construct Laurel Parkway in one phase from Durston Road to West Babcock. In order to
accommodate this requirement, the applicant has submitted this application to modify
the conditions of approval and phasing of the development in which the restricted lots in
Phase 6 can be sold off to help finance the construction of Laurel Parkway. Laurel
Parkway must be dedicated with the initial phase of the subdivision as outlined in
condition of approval number 28 and completed prior to the final plat approval of Phase
5A and guaranteed with the final plat for Phase 6 as outlined in code provision number
4.
The development’s traffic impact study has identified the intersection of Laurel and
Durston will fall below the City’s level of service requirements in the future. However,
based on the subdivision’s build out year, the Engineering Department has determined
40
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 21 of 28
the intersection will have an acceptable level of service by the completion of the entire
subdivision as ensured by condition of approval number 7.
Street lighting is a component of the required street improvements. A special
improvement lighting district (SILD) is proposed to maintain these facilities. Condition
number 8 ensures that the SILD will be formed and effective before final plat. The
requirement for a single SILD will simplify long term maintenance of the street lights and
provide a cost that is more equitably shared.
Maintenance and use of public streets is subject to the terms of the Bozeman Municipal
Code. The certificate of dedication for the final plat must specify responsibilities for
maintenance of all streets, parks and open spaces. Code provisions apply to this issue.
Police/Fire – The area of the subdivision is within the service area of both these
departments. No concerns on service availability have been identified. The necessary
addresses will be provided to enable 911 response to individual homes prior to
recording of the final plat.
Stormwater - The subdivision will construct storm water control facilities to conform to
municipal code. Inspection of installed facilities prior to final plat will verify that
standards have been met. Maintenance of the storm water facilities is an obligation of
the property owners’ association. This responsibility is addressed in the covenants
proposed with the subdivision. Conditions number 10, 22, and 25 ensures this will be
satisfied according to standards with the final plat.
There is a proposed stormwater discharge from the detention pond located in Park 5A
that then drains off site into Aajker Creek to the west. An easement from the property
owner to the west must be acquired in order for the stormwater to travel off site of the
Norton property into Aajker which is addressed in condition number 22 and code
provision number 19 and 23.
Parklands - The proposal meets the required park dedication and improvement
standards. The Recreation and Parks Advisory Board recommends approval of the park
master plan. A final park plan will be completed and approved with the initial final plat.
The parkland proposal for Norton Ranch Phase 5 consists of parkland totaling 8.76
acres within 5 City park lots. A large amount of this land is within watercourse setback
areas and the parkland contribution is reduced accordingly; however the inclusion of the
watercourses and setback areas within the larger park parcels was allowed with the
approval of the Park Master Plan for Norton Ranch Subdivision approved on September
27, 2010 and previous phases. There is a linear park corridor along the west edge of
the subdivision that coincides with Aajker Creek. This linear park was proposed to be
built in two phases, the southern portion with 5A and the northern portion with 5B. The
applicant has agreed to construct the linear park and the trails with Phase 5A as
described in condition number 35.
41
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 22 of 28
At the northwest corner of Phase 5, there is a 1.769 acres park proposed including a
.785 acre retention pond. The large park lot is 5.636 acres with 1.678 acres of wetlands.
Within this park, there will be a playground area, a parking lot, a Class II gravel
pathway, and wayfinding signage. Condition of approval 13 and 14 and code provisions
7 and 15 address park easements and dedication within the development.
4) The effect on the Natural environment
Wetlands exist on the property on the eastern portion and on the northern property
boundary. The watercourse setback for this wetland is located mainly on the proposed
park but does impact some of the lots on the eastern and northern portion of the
development, part of Phases 5C and 5D. The City required an updated wetland
delineation as it had been over 5 years since the most current one was conducted that
was used for previous Norton Ranch phases. The 2018 delineation results indicated
that the wetlands had expanded since 2006 due to a several sources of water that have
since been abandoned or diverted to Aajker Creek, which flows to the west of the
development. Due to this expansion, a new jurisdictional status determination is
required from the U.S. Army Corps. The proposed layout does not impact the
preservation wetland but it will impact the wetland fringe identified in 2018. See
Appendix E, Wetland Exhibit for wetland boundary changes. Review of this
determination is underway and if it is determined that the wetlands are classified as
jurisdictional, they fall under the purview of the U.S. Army Corps which will require
additional permitting such as a 404 permit and possible mitigation. Some of the wetland
boundary encroaches into lots in Phases 5c and 5d which could result in the wetlands
needing to be filled in order for the lots to be developed if they are classified as
jurisdictional. Condition of approval number 15 and code provision 3 and 29 ensures
that wetland jurisdiction determination must be completed prior to final plat approval.
The City requires use of wells or surface water rights to irrigate parks rather than
municipal water supply. There is a lesser energy and infrastructure cost to this
approach. However, in order for the City to rely on these sources to meet the code
requirement there must be the rights to the water. Code provision 11 requires that
necessary ownership and rights be transferred to the POA or City as appropriate.
The site is in an area of high groundwater, which may negatively impact future homes or
cause illicit discharges into the sanitary sewer and over burden the surface drainage
system. Condition of approval number 20 prohibits use of basements. This requirement
will protect both individual home owners from future hazards of flooding and lessen
burden on the public from illicit discharges.
5) The effect on Wildlife and wildlife habitat
The subdivision will not significantly impact wildlife and wildlife habitat. The site has
been substantially impacted by grazing which has reduced wildlife habitat. There are no
42
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 23 of 28
known endangered or threatened species on the property. Comment from state
Montana Fish Wildlife and Parks found no immediate negative effects related to wildlife
impact from this proposed development.
6) The effect on Public health and safety
The intent of the regulations in Chapter 38 of the Bozeman Municipal Code is to protect
the public health, safety and general welfare. The subdivision has been reviewed by
the DRC which has determined that it is in general compliance with the title. Conditions
deemed necessary to ensure compliance are noted throughout this staff report. All
subdivisions must be reviewed against the criteria listed in 76-3-608.3.b-d, Mont Code
Annotated. The Department of Community Development has reviewed this application
against the listed criteria and provides the following summary for submittal materials
and requirements.
Preliminary Plat Supplements
A subdivision pre-application plan review was completed by the DRC on October 31,
2017. With the pre-application plan review application, waivers were requested from
the materials required in Section 38.220.060 “Additional Subdivision Preliminary Plat
Supplements.” Some items were not waived and all required material has been
addressed.
Staff offers the following summary comments on the supplemental information required
with Article 38.220, BMC.
38.220.060.A.1 Surface Water
As stated in the analysis above on the natural environment, wetlands and surface
waters exist on the property. Surface waters on the property a preservation wetland
located along the east boundary of the property, a temporary drain ditch excavated in
January 2015 along the north property boundary, and an existing temporary retention
located in the southwest corner of the property. The proposed layout does not impact
the preservation wetland but it will impact the wetland fringe identified in 2018. See
Appendix E, wetland exhibit.
38.220.060.A.2 Floodplains
Material Waived. There are no designated floodplains on or immediately adjacent to the
site.
38.220.060.A.3 Groundwater
The groundwater monitoring well report is included at the end of the stormwater design
report in Appendix B of the application submittal. Groundwater levels in the monitor
wells were measured during the spring of 2018 and groundwater depths ranged from .5
feet to 2 feet. Condition of approval 21 and 25 require additional data to ensure that all
City drainage standards are met.
43
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 24 of 28
The geotechnical investigation conducted in January 2018 is included in Appendix C.
Groundwater was encountered in all test pit excavations. Condition 20 restricts
basements and crawl spaces for this reason. Plat note 7 restricts crawl spaces and
basements and prohibits discharging from sump pumps into the sanitary sewer, storm
sewer or onto streets and gutters.
A drain tile analysis was conducted in October 2016 to discuss a historic drain tile
system that was partially truncated during infrastructure development that occurred in
2013. A replacement drain tile system was installed late 2016, early 2017 to restore the
groundwater balance. The associated agency approvals for this system are located in
Appendix E. An easement has been granted to Norton Properties, LLC that allows a
perpetual drainage pipeline to deliver discharge from the drain tile system to Aajker
Creek located to the west of the proposed development and is located in Appendix B.
Condition 24 address the drain tile system. Impacts to groundwater are mitigated by
conditions of approval and code requirements.
38.220.060.A.4 Geology, Soils and Slopes
No unusual geological features are present. The geotechnical investigation conducted
in January 2018 is included with this application in Appendix C. The soil was deemed
acceptable to carry the burden of infrastructure with foundation recommendations and
bearing capacity detailed in the report.
38.220.060.A.5 Vegetation
The site has a history of agriculture with few native plants present except possibly in
wetland fringe areas. Wetland mitigation located east of Phase 5 and within the
proposed park was conducted in 2007. A summary of this report and conservation
easements are included in Appendix E. A watercourse setback bordering the east side
of the development and in the park will be revegetated with native grasses and shrubs.
38.220.060.A.6 Wildlife
Material waived. No critical wildlife species or habitat are known to be found on the
property.
38.220.060.A.7 Historical Features
Material waived. No notable features are on the site.
38.220.060.A.8 Agriculture
Material waived. See discussion above under primary review criteria.
38.220.060.A.9 Agricultural Water User Facilities
There are no active agricultural water user facilities located within the development.
38.220.060.A.10 Water and Sewer
New infrastructure will be installed on site to serve the development. See discussion
above under primary review criteria. The required design reports have been provided in
44
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 25 of 28
Appendix A. Formal plans and specifications will be prepared and reviewed after action
on the preliminary plat. Cash in lieu of water rights is required to provide long term water
to the project. Code provision 26 applies to this issue.
38.220.060.A.11 Stormwater Management
Stormwater within the subdivision will be conveyed via surface gutter flow to cub inlets,
then underground via storm drain piping to a stormwater detention pond located in Park
5A. See stormwater design report in Appendix B.
38.220.060.A.12 Streets, Roads and Alleys
A traffic impact study was completed and is included in Appendix F. It was determined
by the Engineering Department that the street infrastructure proposed will adequately
service the subdivision with the exemption of condition of approval number 28 and code
provision 4. See discussion above under primary review criteria.
38.220.060.A.13 Utilities
All private utilities servicing the subdivision will be installed underground. Standard 10
foot front setback utility easements are provided across all lots. See discussion above
under primary review criteria regarding extension of water and sewer. All private utilities
are available in the area.
38.220.060.A.14 Educational Facilities
A letter was received from Director of Facilities of Bozeman Public Schools. Adequate
capacity is available and detailed in Appendix C.
38.220.060.A.15 Land Use
The use proposed is exclusively residential for the buildable portion of phase 5, which
conforms to the future land use designation and zoning purposes. 148 lots will be
developed with Phase 5 which are to the west of Laurel Parkway. The R1A, R1B, R1C,
and R1D restricted development lots part of Phase 6 to the east of Laurel Parkway are
subject to further subdivision review prior to development.
38.220.060.A.16 Parks and Recreation Facilities
There is a Master Park Plan for this project located in Appendix G which details the
proposed parks. See discussion above under primary review criteria.
38.220.060.A.17 Neighborhood Center Plan
Material waived. A Neighborhood Center was satisfied with Phase 3 on the southeast
corner of Babcock and Laurel Parkway. In this neighborhood center includes pedestrian
infrastructure and park amenities. The entirety of Phase 5 is within one-half mile of the
existing neighborhood center.
38.220.060.A.18 Lighting Plan
All street lights installed must use LED light heads and must conform to the City’s
requirement for cut-off shields as required by the City’s specifications. A special
improvement lighting District (SILD) must be created prior to final plat application.
45
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 26 of 28
38.220.060.A.19 Miscellaneous
Material waived. No additional impacts or hazards anticipated.
38.220060.A.20 Affordable Housing
There will be 14 affordable single household detached lots constructed to meet
affordable housing requirements. They are expected to be single family detached
homes with 3 bedrooms. The affordable homes will be constructed in Phase 5A on Lots
1, 2, 21 and 22 of Block 23, Lots 1 and 2 of Block 22, Lot 8 and 9 of Block 18, Lots 8, 9,
10 and 11 of Block 19 and in Phase 5C on Lots 10 and 11 of Block 18. CAHAB
reviewed and recommended approval of the Affordable Housing Plan. See Appendix H
for more information on the affordable housing plan. Condition 12 and code provisions 9
and 10 detail affordable housing requirements prior to final plat approval.
APPENDIX A –PROJECT SITE ZONING AND GROWTH POLICY
Zoning Designation and Land Uses: The subject property is zoned R-2 (Residential
Moderate Density), R-3 (Residential Medium Density District), and R-4 (Residential
High Density District. The buildable portion of the subdivision subject to immediate
development is located in the R-2 and R-3 districts.
The intent of the R-2 residential moderate density district is to provide for one- and two-
household residential development at urban densities within the city in areas that
present few or no development constraints. These purposes are accomplished by:
1. Providing for minimum lot sizes in developed areas consistent with the
established development patterns while providing greater flexibility for clustering
lots and housing types in newly developed areas.
2. Providing for community facilities to serve such development while respecting the
residential quality and nature of the area.
Use of this zone is appropriate for areas with moderate access to parks, community
services and/or transit.
The intent of the R-3 residential medium density district is to provide for the
development of one- to five-household residential structures near service facilities within
the city. This purpose is accomplished by:
1. Providing for minimum lot sizes in developed areas consistent with the
established development patterns while providing greater flexibility for clustering
lots and mixing housing types in newly developed areas.
2. Providing for a variety of housing types, including single household dwellings,
two to four household dwellings, and townhouses to serve the varied needs of
households of different size, age and character, while reducing the adverse effect
of non-residential uses.
46
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 27 of 28
Use of this zone is appropriate for areas with good access to parks, community services
and/or transit.
Adopted Growth Policy Designation: The Future Land Use Map of the Bozeman
Community Plan designates the subject property to develop as “Residential.” The
“Residential” classification designates places where the primary activity is urban density
dwellings. Other uses which complement residences are also acceptable such as parks,
low intensity home based occupations, fire stations, churches, and schools. High
density residential areas should be established in close proximity to commercial centers
to facilitate the provision of services and employment opportunities to persons without
requiring the use of an automobile. Implementation of this category by residential zoning
should provide for and coordinate intensive residential uses in proximity to commercial
centers. The residential designation indicates that it is expected that development will
occur within municipal boundaries, which may require annexation prior to development.
The dwelling unit density expected within this classification varies between 6 and 32
dwellings per net acre. A higher density may be considered in some locations and
circumstances. A variety of housing types can be blended to achieve the desired
density. Large areas of single type housing are discouraged. In limited instances the
strong presence of constraints and natural features, such as floodplains, may cause an
area to be designated for development at a lower density than normally expected within
this category. All residential housing should be arranged with consideration of
compatibility with adjacent development, natural constraints, such as watercourses or
steep slopes, and in a fashion which advances the overall goals of the Bozeman growth
policy. The residential designation is intended to provide the primary locations for
additional housing within the planning area.
APPENDIX B – NOTICING AND PUBLIC COMMENT
Notice was provided at least 15 and not more than 45 days prior to the Planning Board
and City Commission public hearings. Per Article 38.220, Notice was provided by
posting the site, mailing by certified mail to adjacent property owners and by first class
mail to all other owners within 200 feet, and by legal advertisement publication in the
Bozeman Daily Chronicle. Content of the notice contained all elements required by
Article 38.220, BMC.
No public comment has been received.
APPENDIX C - OWNER INFORMATION
Owner: Norton Properties, LLC 63026 NE Lower Meadow Dr #200; Bend, OR 97701-
5877
Applicant: Kilday & Stratton, Inc., 2880 Technology Boulevard West, Suite 273,
Bozeman, MT 59718
47
21024 Planning Board Staff Report – Norton Ranch Phase 5 Subdivision Page 28 of 28
Representative: C&H Engineering & Surveying, 1091 Stoneridge Drive, Bozeman, MT
59718
Report by: Sarah Rosenberg, AICP, Associate Planner
FISCAL EFFECTS
The development will generate the typical costs and revenues of residential
development.
ATTACHMENTS
The full application and file of record can be viewed at the Community Development
Department at 20 E. Olive Street, Bozeman, MT 59715.
Application materials – Available through the Laserfiche archive linked agenda
materials.
48
Memorandum
REPORT TO: Planning Board
FROM: Tom Rogers, Senior Planner
Chris Saunders, Community Development Manager
SUBJECT: Second work session to define and refine Planning Board goals and
Community Plan Implementation. The initial discussion took place on
December 21, 2020.
Suggestions on how to improve Planning Board meeting efficiency. Three
supporting documents attached to this cover memo.
MEETING DATE: March 1, 2021
AGENDA ITEM TYPE: Policy Discussion
RECOMMENDATION: N/A
STRATEGIC PLAN: 4.2 High Quality Urban Approach: Continue to support high-quality planning,
ranging from building design to neighborhood layouts, while pursuing urban
approaches to issues such as multimodal transportation, infill, density,
connected trails and parks, and walkable neighborhoods.
BACKGROUND: On December 21, 2020 the Planning Board began a discussion on the Board
priorities and goals for the coming year including implementation of the
Community Plan 2020. Based on this initial discussion Henry Happel, Board
President, drafted a memo summarizing the proceedings. This memo is
attached to this agenda. To assist in informing the budget discussion, staff
prepared an initial budget concepts memo.
In addition, the December 21, 2020 staff memo is attached for your
reference. General City Planning Board information is linked for your review
from the online document repository.
UNRESOLVED ISSUES: None
ALTERNATIVES: As determined by the Board.
FISCAL EFFECTS: Not identified at this time.
Attachments:
Hap Memo to PB-210224.pdf
Saunders memo to PB 12-16-2020.doc
49
Efficient Meetings Suggestions-210222.docx
Rules of Procedure-Hghlgt-210222.pdf
Footnotes.docx
Report compiled on: February 24, 2021
50
51
52
53
54
MEMORANDUM
TO: BOZEMAN PLANNING BOARD
FROM: CHRIS SAUNDERS, COMMUNITY DEVELOPMENT MANAGER
RE: PLANNING BOARD GOALS AND COMMUNITY PLAN
IMPLEMENTATION DISCUSSION
DATE: DECEMBER 16, 2020
As the Planning Board conducts its discussion on goals and growth policy implementation it may
be helpful to know what activities are already in process or to start up shortly. Resolution 5133
adopting the Bozeman Community Plan 2020 (Plan) on November 17, 2020 requested the City
Manager to undertake implementation activities.
Section 4
The City Commission requests the City Manager to prepare an implementation plan to
undertake the implementation of the recommendations and policies of the Bozeman
Community Plan 2020. The City Manager shall provide recommendations for timing of
work, budget, and staff time commitments to complete the implementation plan.
Section 5
The City Commission requests the City Manager to develop the tracking indicators in
Chapter 4 of the Bozeman Community Plan 2020. The City Commission acknowledges
that the details of implementation of the tracking indicators are subject to adjustment due
to data availability and targets if established by the City Commission.
The following are already in progress for implementing the growth policy. Item 1 is the
foundation for the staff recommendation to the City Manager for what an implementation plan
looks like and what resources are needed. In the list below, STAL stands for Short Term Action
List as shown on page 63 of the Plan. Some items have identified goals or objectives from the
Plan besides those on the STAL.
1. Working with GIS, Planning, IT, Sustainability, Parks, Engineering, Water Conservation,
and Housing to coordinate implementation of multiple plans to magnify effectiveness of
actions taken by moving multiple plans forward with targeted and harmonious action.
Next meeting is mid-January. R-2.8, RC-4.1, and RC-4, Resolution 5133 Section 4
2. Working with GIS to finalize baseline data for the metrics on Page 64. (GIS lead has
recently taken a job with another agency) Resolution 5133 Section 5
55
Page 2 of 3
3. RFP for review of UDC (as called for in housing action plan) to be issued before end of
December. Substantial staff support required as project proceeds. This project may touch
on many goals and objectives of the Plan.
4. Working with Public Works on update to sewer master plan. This work is needed to
identify where capacity limitations may exist and identify what improvements are needed
to support infill and outward expansion. (Necessary preparation for STAL 1 and 2)
5. Have begun review of building heights per Downtown neighborhood plan and Plan,
recommendations expected for April action by CC. Two meetings held so far with design
professionals to solicit input. Phase 1 completed on Dec 15
th
. Expected code revisions for
phase 2 to be proposed in 2021. (STAL 3 and 4)
6. Working with Water Conservation division to review alternatives for standards to support
water conservation. Expected code revisions to be proposed in 2021. (STAL 5)
7. Working with HR for new hire to support MPO functions, position is budgeted and
authorized. (STAL 9)
8. Reviewing multiple zone map amendments, initiated by landowners, which will remove
FLUM/ZM mismatches. (STAL 11)
9. Working with Engineering, DNRC, FEMA to completely replace floodplain regulations
and implement new floodplain maps. Mandated deadline by April 2021. Coordinating
code development with Gallatin County Floodplain Administrator for consistency across
jurisdictional boundaries. (STAL 14)
Other Department actions moving forward now that are related to various parts of the Plan.
a) Working with contractor on survey work for historic preservation to identify those
properties which are or are not eligible. This work is an update to the 1984 survey.
Finishing the 1
st
phase (approx. 128 properties) along N. 7
th
in January 2021. A 2
nd
phase
to finish updating the B-3 area is underway. A 3
rd
phase will be proposed for the next
budget. Purpose of the survey update is the foundation to consider revisions to NCOD
boundary, updating design guidelines. https://www.bozeman.net/government/historic-
preservation has the locations and descriptions of the work. Final NCOD Policy Direction
Report, items 2.2, 2.3, and 4.2 and Plan items N-4.1, N-4.2, N-4.3
b) Based on outcome of completed survey work in Phase 1 the City will consider a revision
to the NCOD boundary along Midtown TIF boundary. This is a zone map amendment.
City Commission has already directed this work to happen with the Final NCOD Policy
Direction report, item 2.2. Implements Plan DCD-1.2
56
Page 3 of 3
c) Semi-annual text amendment cycle is underway including phase 2 of building heights to
consider where and to what degree changes to maximum building heights are appropriate.
Plan RC-4.4
d) Working with Montana League of Cities and Towns on legislation for expedited
subdivision reviews for zoning compliant subdivisions. Plan DCD-1.2
e) Implementing new multi-department application intake and processing software which
will provide simplified upload and updates of documents, better plan tracking, and
approval communication. Plan DCD-4.1
f) Working with Engineering on new well field on west side of the community. Plan DCD1-
1.13, DCD-2.1
Possible implementation task for the Planning Board
Neighborhood plans must be consistent with the overall growth policy. With the recent
adoption of the new Plan it is appropriate to review the existing neighborhood plans for
consistency. If they are not consistent they should be updated or rescinded. Any
development applications within the area of a neighborhood plan must conform to both the
neighborhood plan and the overall growth policy.
Older documents are: Bozeman Creek Enhancement Plan 2012, Bozeman Creek
Neighborhood Plan 2005, Bozeman Deaconess Health Service Subarea Plan 2005, and the
Design and Connectivity Plan for N. 7th
Avenue Corridor 2006.
Recent documents include: Downtown Bozeman Improvement Plan 2019, and the Triangle
Community Plan 2020.
57
Some Suggestions for the Conduct of Efficient Meetings
Board Members:
While some of the burden of conducting efficient meetings falls on the meeting chairman, much
of the responsibility resides with the board members themselves. Therefore:
1. All members should confine their remarks to the specific subject under discussion and nothing
else.
2. All members, before speaking, should attempt to organize their thoughts in a manner so that
their remarks can be delivered cogently and succinctly.
3. Any member offering a motion should strive particularly to ensure that the motion is clearly
understandable and as succinct as possible.
4. All members must preserve order and decorum and avoid any speech or actions that would
delay or interrupt the proceedings. Further to the above, no member may:
-interrupt another speaker except to raise a point of order;
-make any personal, impertinent or slanderous remarks;
-engage in boisterous conduct.
Meeting Chairman:
It is the obligation of the chairman to enforce the above protocols applicable to all Board
members.
In addition, the chairman should:
1. At the beginning of every meeting, set an expectation for the duration of the meeting, which
should generally not exceed 2 hours;
2. Limit, when needed, the total time for public comments by:
-limiting each speaker to 3 minutes (or more);
-encouraging speakers who merely wish to support comments already made to simply say
so;
3. Limit, when needed, the time for presentations by applicants to 10 minutes (or more);
4. For meetings going beyond two hours, provide for a break of 5-10 minutes in the proceedings
at approximately the two-hour mark.
58
59
60
61
62
63
64
65
66
67
68
NOTES
1. Is this meant to be the first meeting after January 1, or the first meeting after February 1,
when the new board is seated? The language could be amended to clarify this.
2. The State statute refers to a “president” and “vice president.” The commonly used
terminology, at least on the Planning Board, is “chairman” and “vice chairman.” Would it make
sense to modify this sentence to read, ”…the board shall appoint by majority vote, a president
(also commonly referred to as a chairman) and a vice president (commonly referred to as a vice
chairman).”?
3. If true, it would be better to say that, “Pursuant to Section 7-1-4135, MCA, the City
Commission has designated as the official posting place for the Bozeman Planning Board…”
since the statue refers to the governing authority. I gather that this is not the posting place for
all boards. If it were, it would be better to say that, “Pursuant to Section 7-1-4135, MCA, the
City Commission has designated as the official posting place for all City boards…”
4. If you would like to put all language about preparation of the agenda into the first part of this
Subsection A, rather than scattered here and in Subsection B, you could revise A and the first
part of B to read as follows:
A. The staff liaison, the president, or in his absence the vice-president, shall prepare a
list of matters to be brought before the board prior to each of its scheduled meetings.
The agenda may be prepared in consultation with other board members. The agenda
shall include any matters that the Board at a previous meeting has decided to place
on the agenda for the meeting in question. The agenda shall follow the order of
business specified in Subsection B., below. The staff liaison shall furnish each
board member and the public, through the City’s website, with an agenda based on
the agreed list of matters no later than 48 hours immediately preceding the meeting
for which that item has been scheduled. The agenda published on the website shall
be accompanied by all written material in the possession of the Department of
Community Development to be presented to the board for consideration with the
agenda item. Copies of the agenda only shall be available from the City Clerk. In
addition, pursuant to Section 7-1-4135, MCA, the City of Bozeman has designated
the lobby of City Hall located at 121 North Rouse, Bozeman, Montana as the
official posting place for all public information. A copy of the agenda shall
therefore be posted at the designated posting board at this location for public
viewing.
B. The agenda shall be in substantially the following form:
69
5. I‘d suggest that the language be changed to better comport with reality: “The Planning Board
shall hold regular meetings on a schedule as agreed to between the board and the Department
of Community Development, but in all events no less frequently than once in the months of
January, April, July and October.”
6. These Rules refer in various places to “the secretary.” The State statute refers to written
requests to “the secretary.” The Board has never elected a secretary and I don’t think we have
any individual who is the secretary of the Planning Board. We have “staff liaison” which I
presume can refer from time to time to any number of persons on City staff. If possible, I would
replace “secretary” wherever it appears in this document, with “staff liaison.” I think the first
part of the Special Meetings Subsection should therefore read: “The presiding officer, two
members upon request to the staff liaison, or the staff liaison itself may call special meetings…”
7. I would move the “Special Meetings” language in Subsection D. up and locate it as
Subsection A. iii. There are two reasons for this: first, we hold quite a few special meetings and
that argues for a more prominent place for special meetings in this Section 5. Second, the
language in the current Subsection ii about adjourning meetings applies to special meetings,
but that’s not entirely clear at present. If this change is made, the heading for Subsection A
would need to be changed to “General/Regular and Special Meetings:”. I would also move the
current Subsection A.iii up to immediately below A.i since it concerns only regular meetings.
5.-7. Because the sum of my comments above may be confusing, here is what I’d suggest
Subsection A. look like:
A. General/Regular and Special Meetings:
i. The Planning Board shall hold regular meetings on a schedule as agreed
to between the board and the Department of Community Development, but
in all events no less frequently than once in the months of January, April,
July and October.
ii. The presiding officer, staff liaison or majority of the board may cancel a
regular meeting if no business is scheduled for that meeting.
iii. The presiding officer, two members upon request to the staff liaison, or the
staff liaison itself may call special meetings of the board. The staff liaison
shall send to all members at least forty-eight (48) hours advance written
notice of the meeting delivered by means of email communications to the
member’s known email address, or written notice left at the member’s usual
place of residence, and accompanied by notice to the public by, at a
minimum, the posting of the agenda on the City’s website and posting
board. Written notice of a special meeting is not required if the time of the
special meeting has been fixed in a regular meeting or if all members are
present at the special meeting. (76-1-301 MCA)
iv. Any meeting of the board may be adjourned to a later date and time,
provided that no adjournment shall be for a longer period than until the
next regular or specially scheduled meeting.
70
8. I don’t know what having testimony and evidence “directed to the presiding officer” means.
What’s the practical import of this language?
9. This sentence doesn’t indicate who is to make the decision about whether testimony under
oath is required, nor who administers the oath, nor what the language of the oath is. Should
these issues be addressed?
10. It has not been our practice to reduce motions to writing. I would very much like to see this
done and I suspect modern technology could help.
11. This Subsection should, I think, prohibit off-topic speech more broadly. I’d suggest,
“Speakers should address only the matter then before the board. Any person speaking on a
matter not then before the board, unless addressing a matter of privilege, may be called out of
order.”
12. I think a more appropriate place for this Section, which describes what the Planning Board is
about, would be right after Section 1 on the first page of this document.
71