Loading...
HomeMy WebLinkAbout01-13-21 Public Comment - G. Peterson - SID 762 S. 6th AveFrom: Gregory Peterson To: Katherine Maines; Ann Peterson Subject: South 6th Reconstruction Date: Wednesday, January 13, 2021 5:20:06 PM I am not sure if Annie is going to make the meeting tonight and I am in California. I would again like to voice our vote for the Reconstruction Project and our concerns too. Our primary concerns are: 1) The infrastructure changes that will be made to the utilities include removal of all lead pipes to each house and that sewer connections made by the contractor replace all connections into each yard past the sidewalk so that the new road surface and sidewalks will not be cut to do this work following the reconstruction. 2) That the city forestry division makes recommendations for the removal of all trees in the boulevards that are improperly placed such as those spaced to close together and trees that are not listed as appropriate species that might be impacting or will at some point impact the new curbs and sidewalks. 3) That no Fly Ash be incorporated into the concrete in place of Portland Cement. The sidewalks surfaces should be guaranteed by the contractor to hold their finish. You see many sidewalks with stamped names and dates that look better than many of the sidewalks poured recently. This is often because of inappropriate finishing. Fly Ash has high levels of heavy metals and it is not needed to slow the curing; it is a way to dispose of hazardous waste and reduce the cost associated with Portland Cement. Thank you, Greg and Ann -- Gregory Peterson Phone: 406-551-5181