HomeMy WebLinkAbout20- Work Directive 3 - Knife River - Aspen Street Improvements DocuSign Envelope ID:CCB6C98A-4492-43B5-9FE6-D4585DB29877 Work Change Directive No. 3 Date of Issuance: December 8, 2020 Effective Date: December 8, 2020 Project: Aspen St& 5th Ave Owner: City of Bozeman Owner's Contract No.: Improvements Contract: To provide street improvements, water main, electrical and Date of Contract: landscaping on Aspen Street and 5th Avenue in Bozeman, MT. 5/4/20 Contractor: Knife River- Belgrade Engineer's Project No.: 18098.10 Contractor is directed to proceed promptly with the following change(s): Item No. Description 339 Add timer and junction boxes to allow the string lights to operate independently from the luminaires in the amount of$1,439.76 as shown on the attached contractor pricing. This amount shall be charged to Item No. 339. Attachments (list documents supporting change): See attached contractor pricing. Purpose for Work Change Directive: Authorization for Work described herein to proceed on the basis of Cost of the Work due to: ❑ Nonagreement on pricing of proposed change. ® Necessity to expedite Work described herein prior to agreeing to changes on Contract Price and Contract Time. Estimated change in Contract Price and Contract Times: Contract Price $1,439.76 (increase/decrease) Contract Time 0 (increase/decrease) days Recommended for Approval by Engi r: Date 12/8/20 Authorized for Owner by: Date Received for Contractor by: Date Received by Funding Agency(if applicable): DocuS'9"e'by. Date: Fly 12/10/2020 D51MD5987D4E2... EJCDC C-940 Work Change Directive Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute. Page 1 of 1 DocuSign Envelope ID:CCB6C98A-4492-43B5-9FE6-D4585DB29877 Danielle Scharf From: Walter,Josh <Josh.Walter@Kniferiver.com> Sent: Friday, December 4, 2020 8:38 AM To: Danielle Scharf Subject: FW:Aspen CO Attachments: C01 String Light Control.pdf Danielle, Attached is Central Electric's proposal to add the timer and junction boxes to the luminaire poles to control the string lights separately. Please add 5%to the attached total for KRC markup. Thanks, Josh Walter Project Manager/Estimator Knife River— Belgrade r4-4 KN I FE RIVER MUM RESOURCES COrawr PO Box 9 Belgrade, MT 59714 Main Office:406-388-6832 Direct Line:406-924-5572 Fax:406-388-9612 From: Spencer Walsh <swalsh@ceinc.biz> Sent: Friday, December 4, 2020 8:33 AM To:Walter,Josh <Josh.Walter@ Knife rive r.com> Subject:Aspen CO ** WARNING: EXTERNAL SENDER. NEVER click links or open attachments without positive sender verification of purpose. DO NOT provide your user ID or password on sites or forms linked from this email. ** Josh, Attached is the change order associated with the equipment to control string lights and to add the weather proof boxes to the top of the poles. Let me know if you have any questions and if I can go ahead and order material. Spencer Walsh Central Electric, Inc. Billings Electric Townsend Electric P: 406-538-3786 F: 406-538-6041 swalsh@ceinc.biz DocuSign Envelope ID:CCB6C98A-4492-43B5-9FE6-D4585DB29877 12/4/2020 Central �EBILLNGS LECITRIC Electric y � - �n c E1¢ctrlc P.O.Box 872 *805 Truck Bypass,Lewistown,MT 59457 •Fax 406-538-6041 •Phone 406-538-3786 Change Order# 01 Project: Aspen St & 5th Ave Change Request# Contractor Knife River-Belgrad Description: Provide and install time clock, contactor, and HOA to control string lights seperately. Material Quantity Price Total Time Clock Digital 1 $124.81 $124.81 Contactor 1 $72.16 $72.16 HOA 1 $94.85 $94.85 WP Handi Box 8 $9.96 $79.68 WP Black Cover 8 $5.40 $43.20 Cord Grips 8 $6.60 $52.80 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 Sub-Total = $467.50 Labor Electrician Rate w/Burden 8.0 $83.51 $668.07 Skid Stee/Trencher 0.0 $95.00 $0.00 Project Manager 0.00 $65.00 $0.00 Hotel 0.00 $75.00 $0.00 Mileage 0.00 $1.00 $0.00 Sub-Total = $668.07 Total $1,135.57 Overhead 15% $170.34 Profit 5% $65.30 Bond 0.0% $0.00 Tax 0% $0.00 Grand Total $1,371.20 +5% KR Markup = $1,439.76