Loading...
HomeMy WebLinkAboutBuffalo Run - RC Memo (20-112) 01_25_2021 28 January 2021 Buffalo Run Annexation & ZMA (20-112) The following information is submitted to supplement the Buffalo Run Annexation and Zone Map Amendment (ZMA) application materials currently under review. This memo contains details on the steps the project team has taken to date to demonstrate good faith in the development process and clarify the outreach efforts underway with the Meadow Creek neighborhood. This document also specifies which components of the application materials are most vital to the current applications under review and describes the future steps that will ultimately allow for construction at this site. The applicant has endeavored at each stage of the review process to provide additional clarity and specificity beyond what is required. This includes the submittal of a preliminary Traffic Impact Study and several preliminary engineering reports. These actions were intended to foster trust between the developer, the community, and the City by providing details that are not required for approval of the Annexation and ZMA submittals. It is the applicant’s intention that these preliminary documents will be updated to provide precise details on the development proposed during the future review procedures necessary to allow construction (i.e. Subdivision, Site Plan reviews, etc.), however they are beyond the scope of review for the current applications. Stakeholder Engagement Since the January 11, 2020 Zoning Commission review of the ZMA, the applicant team has met with the Meadow Creek HOA Board to discuss this project in more detail. It was determined during and in follow up to those discussions that two of the critical concerns of the Meadow Creek neighbors are related to density and traffic impacts (based on comments to date). Regarding density, the City’s adopted Future Land Use Map designates this parcel as Urban Neighborhood. This category is primarily intended to include urban density homes in a variety of types, shapes, sizes, and intensities, which is the intent of this project. Moreover, the requested zoning of R-5 is an allowed zoning district within the Urban Neighborhood land use category. It should be noted that only two and three story buildings would be constructed, and this project would additional require significant onsite open space and parkland. Turning to the issue of traffic, the applicant team has met with City Staff to come to an accord on the following expectations for transportation related public improvements: - The applicant team has contacted the County Road Department to discuss the project and paving Fowler Road to County Standards which will qualify as a second access point. The County has agreed to maintain this road. - The previously required street through the park in an existing easement can be eliminated with the paving of Fowler. This will allow for the neighborhood park to expand and be improved now, as well as with future adjacent developments. Essential Review Materials For this review it is essential that the City Commission pay special attention to the applicant’s Narrative that demonstrates how the project meets the review criteria for Annexation and ZMA approval. Commissioners are also advised to review the RC information with an eye to the future, as the assumptions included therein provide a snapshot of best available information from mid-2020. Development and design concepts continue to evolve, as they do with a project of this type at such an early stage in the development process, and therefore precise analysis and distillation of the subdivision and site plan design components is more suitable to occur under a subsequent review. The attached exhibit displays visually several the important components from this memo to provide additional evidence of the thoughtfulness of the current proposal before you (Exhibit A). The application materials, as demonstrated in the submittals and the analysis provided by City Planning Staff, show that this project has met the approval criteria for Annexation and initial zoning, and should therefore be approved by City Commission. Attachment - Exhibit A