HomeMy WebLinkAbout01-28-21 Agenda RPAB - Subdivision Review CommitteeA. Call Special Meeting of the Subdivision Review Committee to order - 3:30 pm
This meeting will be held using Webex, an online videoconferencing system. You can join this
meeting:
Via Webex:
https://cityofbozeman.webex.com/cityofbozeman/onstage/g.php?MTID=e5ca4c6cca7e52b9c7d5743c8baf491a6
Click the Register link, enter the required information, and click submit.
Click Join Now to enter the meeting
Via Phone: This is for listening only if you cannot watch the stream or channel 190
United States Toll
+1-650-479-3208
Access code: 126 649 7587
B. Disclosures
C. Public Comment
Please state your name and address in an audible tone of voice for the record. This is the time for
individuals to comment on matters falling within the purview of the Committee. There will also be
an opportunity in conjunction with each action item for comments pertaining to that item. Please
limit your comments to three minutes.
D. Action Items
D.1 19230 and 19231 Bozeman East Mixed-Use Development Master Site Plan and Phase 1 & II
SP/CUP(Jadin)
D.2 20224 West Side Flats Master Site Plan – Park Proposal (Jadin)
E. FYI/Discussion
F. Adjournment
THE RECREATION AND PARKS ADVISORY BOARD OF BOZEMAN, MONTANA
RPAB AGENDA
Thursday, January 28, 2021
For more information please contact Addi Jadin, ajadin@bozeman.net, 406.582.2908.
Committee meetings are open to all members of the public. If you have a disability and require
assistance, please contact our ADA coordinator, Mike Gray at 582-3232 (TDD 582-2301).
Bozeman Recreation and Parks Advisory Board Meeting Agenda, January 28, 2021
1
Memorandum
REPORT TO: Recreation and Parks Advisory Board
FROM: Addi Jadin, Parks Planning and Development Manager
SUBJECT: 19230 and 19231 Bozeman East Mixed-Use Development Master Site Plan
and Phase 1 & II SP/CUP
MEETING DATE: January 28, 2021
AGENDA ITEM TYPE: Community Development - Legislative
RECOMMENDATION: Having reviewed and considered the application materials, public comment,
and all the information presented, I hereby adopt the findings presented in
the staff report for applications 19230 and 19231 and move to recommend
approval with conditions and subject to all applicable code provisions.
STRATEGIC PLAN: 3.4 Active Recreation: Facilitate and promote recreational opportunities and
active health programs and facilities.
BACKGROUND:
Summary of Parkland Proposal
The parkland proposal is summarized in application document “2.5_Boz East
Mixed-Use Development Review Narrative” on pages 4-6. The proposal
includes
1. Waiver of Required Park Dedication for 0.79 acres conservation
easement and 0.60 acres for and public access easement in Phase 1
(1.39 acres waived)
2. Improvements in Lieu of Parkland (IILP) in Phase 1 totaling
$160,644.00
3. Cash-in-lieu of Parkland (CILP) in Phase 2 totaling $129,304.16
Per net lot area of 9 acres, total park land required is 3.25 acres. Staff agrees
with and supports the waiver for 0.79-acre conservation easement. Staff
does not have precedent for allowing the waiver for additional 0.60-acre
public access easement; however, given that this area is predominantly
outside of the watercourse setback area and does not allow double counting
of required onsite open space with the easement, it has a value beyond the
more typical trail easement areas that are within watercourse zone 2. This
allowed the applicants to propose features that might not otherwise be
allowed within a trail easement corridor. Staff recommends either approval
of the waiver request or to require applicants to make slight adjustments to
allow the trail to be fully adopted as a Linear Park per 38.420.070 (ie. ensure
2
25-foot width throughout if overlapping with Conservation Easement is
permitted).
If both waivers are allowed or the trail easement is allowed as linear
parkland, the remaining parkland owed is 1.86 acres (amounts to
$139,357.15 as CILP based on current $1.72 psf appraisal value). The
applicant’s proposal for improvements makes up more than the required
balance and no additional Cash-in-lieu would be required.
If the waiver for 0.60-acre trail easement is not allowed and the area cannot
be reconfigured as linear park, the remaining parkland owed is 2.46 acres
(amounts to $184,311.07). After improvements-in-lieu, the balance owed as
Cash-in-lieu of Parkland would be $23,667.07.
Staff does agree with the applicant’s proposal to use IIL toward the
improvements proposed. The park shelter, community gardens and fenced-
in dog areas are improvements conducive to the linear park system and are
not being double counted toward on-site open space requirements.
Code Correction
1. 420.080. Standard park improvement costs (irrigation, street trees,
linear park trees @ 1 per 50’, sod, etc) and costs associated with other
standards (wetland setback plantings) may not be counted toward
improvements-in-lieu.
Advisory (needs additional review by Engineering)
2. Stormwater facilities are not allowed in Zone 1 watercourse per
38.410.100.A.2.e.(2)(a)
3. Snow storage may not be allowed within stormwater facility.
Conditions of Approval:
1. As recommended by the committee.
UNRESOLVED ISSUES: Approval of Waivers.
ALTERNATIVES: Redesign of easement to meet linear park standards.
FISCAL EFFECTS: Cash-in-lieu of Parkland may be offered as balance to land and
improvements provided.
Attachments:
PL1.05-PARKLAND PLAN_11-13-20.pdf
PL1.06-PARKLAND PLAN_11-13-20.pdf
3
PL1.07-PARKLAND DETAILS_11-13-20.pdf
00_T1.6-PARKLAND TITLE SHEET_11-13-20.pdf
PL1.00-COVER_NOTES_LEGEND_11-13-20.pdf
PL1.01-OVERALL PARKLAND PLAN_CALCULATIONS_11-13-
20.pdf
PL1.02-PARKLAND PLAN_11-13-20.pdf
PL1.03-PARKLAND PLAN_11-13-20.pdf
PL1.04-PARKLAND PLAN_11-13-20.pdf
EX-4-PARKLAND EXHIBIT_11-13-20.pdf
EX-6 MASTER SITE PLAN_11-13-20.pdf
2.5_Boz East Mixed-Use_Development Review-Narrative-
DONE.pdf
1.1_DevelopmentReviewApplication_SIGNED.pdf
1.1_DevelopmentReviewApplication_SIGNED.pdf
Report compiled on: January 22, 2021
4
5
6
7
REVIEW
SUBMITTAL
DEVELOPMENT
APARTMENT UNITS IN BOZEMAN, MONTANA
FARRAN REALTY PARTNERS
BOZEMAN EAST MIXED-USE
4202 BELTWAY DRIVE ADDISON, TX 75001
214.520.8878 hedk.com
Engineering
1800 RIVER DR. NO. • GREAT FALLS, MONTANA 59401
406.761.3010 • tdhengineering.com
LEGAL DESCRIPTION
BRIDGER PEAKS VILLAGE SUB, S01, T02 S, R05 E,
LOT 5, ACRES 11.85, PLAT J-368 PLUS INTEREST
IN COMMON AREA
SITE ADDRESS
TSCHACHE LANE, EAST OF N 19TH AVE
BOZEMAN, MT 59715
OWNERS
BRIDGER PEAK LAND DEVELOPMENT PARTNERS, LLC
101 E. FRONT STREET, SUITE 304
MISSOULA, MT 59802
PHONE: 406.541.9000
CONTACT: JIM MCLEOD
SACCOCCIA LANDS, LLC
1234 SPRINGHILL ROAD
BELGRADE, MT 59714
PHONE: 228.326.4447
CONTACT: PHILIP SACCOCCIA
OWNER REPRESENTATIVE
TD&H ENGINEERING
1800 RIVER DR N
GREAT FALLS, MT 59401
PHONE: 406.761.3010
CONTACT: JANA COOPER
ARCHITECT
BGO ARCHITECTS
4202 BELTWAY DR
ADDISON, TX 75001
PHONE: 214.520.8878x111
CONTACT: MIKE MCCARTHY
CITY OF BOZEMAN ADOPTED GOVERNINGBUILDING CODES
2012 IBC
2012 IRBC
2012 IEBC
2012 IMC
2012 IFGC
2012 ECC
2012 UPC
2014 NEC (NFPA 70)
2009 ICC A117.1
2012 IFC
ZONING: B-2
TYPE OF CONSTRUCTION: V-A
OCCUPANCY GROUP: A8-07 & A8-08
ENGINEER (STRUCTURAL)
AEGIS ENGINEERING INC.
128 W ALDER ST, SUITE A
MISSOULA, MT 59802
PHONE: 406.829.3300
9
10
11
12
13
14
E
E
E
E
E
E
SD
SD
SD SD SD
SD
SD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD
SD SD SD
SD
SD
SD
SD
SD
SD SD SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD SD
S2°21'23"W 493.32'
N87°39'57"W 152.02'
N88°30'36"W 189.83'
N43°30'20"W 355.88'
N1°29'24"E 551.27'
S87°55'12"E 799.23'
MONTANA | WASHINGTON | IDAHO | NORTH DAKOTA | PENNSYLVANIA
1800 River Drive North
Great Falls, MT 59401
406.761.3010
tdhengineering.com
November 13, 2020
Note: Underlined Items have been updated for 11/13/20 resubmittal.
BOZEMAN EAST MIXED-USE
PROJECT NARRATIVE
Bridger Peak Land Development Partners, LLC (BPLDP) is proposing a new mixed-use
development on an infill lot located south of Tschache Lane, east of North 19th Ave. and
legally described as BRIDGER PEAKS VILLAGE SUB, S01, T02 S, R05 E, Lot 5, ACRES
11.85, PLAT J-368 PLUS INTEREST IN COMMON AREA in Bozeman, MT. The developer
is requesting Master Site Plan Review, Site Plan Review and consideration for a Conditional
Use Permit (CUP) from the City of Bozeman (COB) on the project. See Sheet EX-1 –
Conceptual Site Plan.
PROJECT BACKGROUND
The project was initially submitted for conceptual review to the COB in November 2016.
Since that time, the developer and consultants have been working with various City
departments to develop a plan that is consistent with the intent of the City’s Unified
Development Code (UDC) and the Growth Policy.
The project was submitted for a second Concept Review on October 13, 2017 (City of
Bozeman Application No. 17499). Comments were received from the City of Bozeman on
November 7, 2017.
The project was submitted for Informal Review on October 30, 2018 (City of Bozeman
Application No 18-510). Comments were received from the City of Bozeman on December
3, 2018. Responses to these comments have been included in the submittal in Part 1.6.
The project was submitted for Development Review on May 29, 2019 (City of Bozeman
Application No 19230/19231). Comments were received from the City of Bozeman on
September 23, 2019. Responses to these comments have been included in this resubmittal.
A secondary round of comments were received from the City of Bozeman on April 10, 2020.
Responses to these comments have been included in this resubmittal.
A third round of comments were received from the City of Bozeman on September 4 & 22,
2020. Responses to these comments have been included in this resubmittal.
The proposed development will consist of approximately 304 residential apartment units
located in four buildings. The project site plan proposes two mixed-use buildings along
Tschache Lane; the first floor will have commercial uses and one residential apartment in
each building and the second and third floors will include residential apartments. The mixed-
use buildings will be designed in a commercial manner including strong pedestrian access
to entrances, storefront facades, etc. There are two four-story apartment buildings planned
for the southern portion of the site. In conjunction with the site plan approval the applicant
16
November 13, 2020 PAGE NO. 2
tdhengineering.com
is requesting Master Site Plan approval, see Master Site Plan Narrative and a CUP approval,
see CUP Narrative. The CUP request is to allow residential uses on the first floor of the
buildings.
As a part of the application the developers are requested concurrent construction to allow for
issuance of building permit prior to completion of the public infrastructure as identified under
Section 38.270.030 of the Bozeman City Code. Information on the concurrent construction
request can be found in Appendix K.
GENERAL PROJECT INFORMATION / IMPROVEMENTS
• Lot Size: ±11.85 acres
• Existing Site Conditions: Vacant, undeveloped land
• Zoning: B-2 Community Business District
• Community Plan Future Land Use Designation: Regional Commercial and Services
• Residential: 304 apartments in 4 buildings
• Commercial: 18,043 sq. ft. of first floor commercial along Tschache Lane.
• Overall Unit Breakdown:
o Efficiency/Studio: 60 Units
o One Bedroom: 138 Units
o Two Bedroom: 106 Units
• Access: Two primary access points from Tschache Lane; one fire access to the south
from the adjacent development and pedestrian access from Patrick Street & North
15th Street on the east.
• Amenities: Courtyard includes: Pool/Spa, BBQ Areas, Bocce Ball, Table Tennis, Fire
Pit and Passive Seating. Other amenities include Public Access Easement with
amenities including Shuffle Board, Life-size Chess, Seating, and Lighting; Entry Plaza
with Seating, a Fire Pit, Hammocks and Public Art space; Bike/Ski Tuning Shop
(interior); Dog Run; Community Gardens, Bird Watching Pavilion, and Walking Paths.
• Setbacks: Yard setbacks have been provided on the attached site plan. The proposed
development meets the B-2 zoning district building setback requirements including:
Buildings:
o Front yard: Based on block frontage - storefront - required at front property
line/back edge of sidewalk. Additional setbacks are allowed for widened
sidewalk or pedestrian-oriented space (38.520.060.d). Setback along
Tschache Lane includes a 20-foot existing stormwater utility easement.
o Rear yard: Ten feet
o Side yard: Five feet (except zero lot lines as allowed by section 38.21.060)
Parking & Loading Areas:
o Front yard: Front setback provisions are set forth in the block frontage standards
in division 38.510 and in 38.350.070.
o Rear yard: Ten feet
o Side yard: Eight feet
• Adjacent uses:
o North: Tschache Lane and vacant land.
o East: Walton’s Stream/Ditch, vacant undeveloped parcel.
o South: Portion of shopping center and an affordable multi-family housing
development.
o West: Shopping center including Smiths Grocery store. Lowes home
improvement store is located northwest of the site.
17
November 13, 2020 PAGE NO. 3
tdhengineering.com
• Adjacent Infrastructure:
o There are existing water mains located in Tschache Lane north of the subject
parcel.
o There is sanitary sewer in Tschache Lane up to the northwestern corner of the
subject property.
o There is a gravity storm main located on the northwest and northeast corners
of the subject property. There is also a detention easement that runs through
the southeast portion of the property.
See the following exhibits for additional information:
Sheet EX-1 Conceptual Site Plan
Sheet EX-2 Parking Layout & Calcs
Sheet EX-3 Block Frontage Plan & Section
Sheet EX-4 Parkland Exhibit
PARKING CALCULATIONS
The current design includes 522 proposed parking spaces for the development; 20 of the
spaces are provided on-street. Based on the Unified Development Code (UDC) standards
the project is required to provide 546 parking spaces. The project will utilize UDC Section
38.540.050 (1) (a) (1) to incorporate 20 on-street parking spaces. Additionally, the project
will utilize UDC Section 38.540.050 (1) (B) (2) for reductions to parking for building 1/A based
on the allowed reductions for mixed-use buildings. Including the available, on-street parking,
the development would require a 24-spot reduction in parking.
Parking Calculations are provided on Sheet EX-2 Parking Layout & Calcs.
BLOCK LENGTH
Per 38.410.040 of the UDC, blocks shall not be more than 400 feet in length or less than 300
feet in length. The developer has been working with City staff to develop a coordinated
solution to the block length requirement. To meet the intent of the UDC, the proposed
development includes a dedicated 30-foot wide right of way for pedestrians (pedestrian
easement) through the development that will connect Patrick Street on the east side of the
development to Sacco Drive on the north side of the development. This pedestrian right of
way will be dedicated to the City as an easement for public use. Extending Patrick Street
through the development is not appropriate for several reasons including:
1. Extending Patrick St. to the west would require crossing Walton Stream/Ditch,
which would create a more significant impact to the wetland then extending the
proposed pedestrian connection, which would be limited to a 10-foot wide shared
use crossing of Walton Stream/Ditch.
2. The proposed pedestrian right of way meets the intent of the code by providing a
public route through the site at the required block length. Additionally, the
proposed l pedestrian right of way connects to the larger pedestrian system in the
area, which is further described in the Parkland Dedication section below.
The developer will provide a public aces easement and submit a waiver for block length, if
necessary, to establish the pedestrian right of way.
The location of the proposed pathway can be seen on Sheet EX-1 Conceptual Site Plan
design and amenities of the pedestrian right of way can be found in the landscape sheets.
18
November 13, 2020 PAGE NO. 4
tdhengineering.com
PARKLAND DEDICATION
The developers are proposing a unique combination of solutions to meet the parkland
dedication requirements for the project. They are proposing a combination of (1) waiver of
park dedication for a conservation area, & (2) cash-in-lieu of parkland. See EX-4 Conceptual
Parkland Exhibit.
Required Parkland Calculation:
• Gross Property Area: 11.85 Acres
• Net Property Area:
o Tschache Lane Dedication Area: 0.55 Acres
o N 15th Ave Dedication Area: 0.1 Acres
o Common Open Space Reduction (per P/R Memo Dated 8/27/20): 2.2 Acres
• Net Property Area: 9.0 Acres
• Required Parkland: 12 du / acre X 9.0 Acres X 0.03 acre / du = 3.25 Acres of land
required to satisfy parkland requirement.
Proposal to Meet Parkland Dedication Requirements:
1. Request Waiver of Required Park Dedication, based on 38.420.100:
A. The review authority may waive the park dedication or cash donation in-lieu of land
dedication requirement if land equal to or exceeding the area of the dedication
otherwise required by this division 38.420 is set aside by one of the following
means:
1. 38.420.100 (A)(1) The proposed development provides long-term protection of
critical wildlife habitat; cultural, historical archeological or natural resources;
agricultural interests; or aesthetic values.
2. 38.27.100 (A)(2) The proposed development provides for a planned unit
development or other development with land permanently set aside for park
and recreational uses sufficient to meet the needs of the persons who will
ultimately reside in the development.
Request to reduce the amount of required parkland by 0.79 acres for the area within
Walton Stream/Ditch Conservation Area, Request to provide a public pedestrian
access easement and passive amenities to area adjacent to the Walton Stream/Ditch
Conservation Area which constitutes approximately 0.6.
The proposed open space and site amenities provided by the developer meet several
of the criteria listed in the waiver of required park dedication in the City’s UDC,
including:
• Walton’s Stream/Ditch runs through the eastern portion of the proposed
development. This stream is home to local wildlife, adds aesthetic value to the
community, and is utilized for agricultural uses downstream. The developer is
proposing to protect this 0.79-acre area of the development. It be left
undeveloped beyond planting enhancements to the watercourse setback as
required by code.
• The stream/ditch continues both north and south of the development. There
is an existing shared use pathway that extends southerly and an existing trail
located north of the site (See Figure 1: Bozeman PROST Trail Map). The
development will include a gravel trail connection along Walton’s Stream/Ditch
19
November 13, 2020 PAGE NO. 5
tdhengineering.com
to connect to the north and as previously described a shared use path through
the development from Patrick Street to Tschache Lane/Sacco Drive. This
would be a dedicated public access easement.
• Additionally, the developer is proposing to develop amenities along the trail for
the use of both the on-site residents and the community to be able to enjoy
local wildlife in the area. The developer will provide access to a community
garden, off leash, fenced dog run, a pavilion and covered and uncovered
seating areas along the trail for users. These amenities would be maintained
by the development but available to the community at large. The cost of these
amenities are part of the developers request to provide Improvements In-Lieu
of Parkland described below.
• The project also includes access to a community pool, fitness center, business
conference room, community room, and bike/ski tuning shop for residences of
the Bozeman Mixed-Use Development community. It should be noted that the
site plan is conceptual in nature and the developer’s intent is to integrate the
proposed amenities into the site to the extent feasible, so they are easily
accessible to residents, and public where possible, and create a sense of
community for the development.
2. Provide Improvements In-Lieu of Parkland.
The developer is proposing approximately $160,644 in improvements, within
the pedestrian easement area right of way. Although this area would not be
dedicated as parkland, it would benefit from amenities being added to increase
use, safety and functionality. The amenities as described above would include
community garden, off leash, fenced dog run, a pavilion and covered and
uncovered seating areas along the trail for users. or other public amenities the
departments determine are acceptable in the corridor. All amenities along the
corridor would be available for public use. Please see Parkland Improvement
Plans (PL1.00-PL1.08) for additional details.
3. Provide Cash In-Lieu of Parkland Dedication.
The remaining portion of the required parkland dedication would be fulfilled
through the developer paying cash-in-lieu to the City. The amount of cash-in
-lieu is to be determined per typical cash-in-lieu requirement standards.
Estimated remaining cash-in-lieu if Options 1 & 2 were approved by the City
would be $129,304.16. (Table 1: Park Valuation Calculations)
Parkland Request Summary:
Required Parkland: 3.25 Acres (per memo from park and rec dated 8/27/20)
Proposed Dedicated Conservation Area: 0.79 Acres
Proposed Dedicated Public Open Space Easement: 0.6 Acres
Improvements In-Lieu (located in the 0.6 Acre Public Open Space Easement): $160,644.00
Cash In-Lieu: $129,304.16
20
November 13, 2020 PAGE NO. 6
tdhengineering.com
The intent of the approach to meeting the parkland dedication requirements for the proposed
development is to provide as much on-site parkland/conservation area with amenities as
possible and supplement with cash-in-lieu where the development is deficient.
Figure 1: Bozeman PROST Trail Map
Table 1: Park Valuations Calculations (NOTE: Parklands calculations have been updated for the
11/13/20 resubmittal.)
Standard Park Improvements Example Park – 1 Acre Boz. East Mixed-Use – 1.86 Acres
Mobilization, site prep and seeding
@ 0.50/SF
$21.780.00 $40,510.80
Irrigation @ $25,000 per acre $25,000.00 $46,500.00
Boundary Survey and Corner Posts $2,000.00 $2,000.00
Street Trees: Street LF/50 = 16
Trees @ $425
$6,800.00 $12,733.00
Sidewalks: LF of 6-ft x 6-inch @
$6 SF
$30,024.00 $54,000.00
Total Cost of Basic
Improvements
$85,604.00 $155,783.80
Undeveloped (Unzoned, Vacant)
Land Cost 43560 sf x $1.50 / SF
$65,340.00 $224,652.160
Parking Space: Asphalt, Curb &
Gutter - $1,166 each
$32,648.00 $65,296.00
Total Park Cost including Land &
Min. Improvements
$183,592.00 $289,948.16
Proposed Improvements In-lieu $160,644.00
Proposed Cash In-lieu $129,304.16
21
November 13, 2020 PAGE NO. 7
tdhengineering.com
BLOCK FRONTAGE
There are three proposed block frontages that are required within the development.
1. Storefront Block Frontage: North side of Buildings 1/A & 4/D along Tschache Lane.
2. Special Residential Block Frontage: Buildings 2/B & 3/C.
3. Park/Trail Block Frontage: Adjacent to Walton Stream/Ditch
Below is a table defining how each block frontage is implemented.
Table 2: Storefront Block Frontage Standards (Applies to Buildings 1/A & 4/D)
Element Standards Project Information
Ground Floor Land
Use
Non-residential uses specified in
38.10.020, except for lobbies associated
with residential or hotel/motel uses on
upper floors.
Buildings A1 & D4 include non-residential uses.
One Accessible unit is provided on ground floor
of each of these buildings to meet accessibility
requirements.
Floor to ceiling
height
13' minimum (applies to new buildings
only).
Provided Buildings A1 & D4.
Retail space depth 20' minimum (applies to new buildings
only).
Provided, see floor plans for building A1 & D4.
Building
placement
Required at front property line/back edge
of sidewalk. Additional setbacks are
allowed for widened sidewalk or
pedestrian-oriented space
(38.520.060.D).
Buildings A1 & D4 are located approximately
18 feet off property line. There is an existing
20-foot stormwater easement along the
northside of the property adjacent to Tschache
Lane, no building encroachments are permitted
in the easement, therefore buildings are
setback accordingly.
Building entrances Must face the street. For corner
buildings, entrances may face the street
corner.
Building entrances will be provided along the
street, final location of building entrances will
be determined based on final layout of
commercial spaces in Buildings A1 & D4.
Façade
transparency
At least 60% of ground floor between 30"
and 10' above the sidewalk for primary
facades and 40% of ground floor
between 30" and 10' above the sidewalk
for secondary facades. Display windows
may count for up to 50% of the
transparency requirement provided they
are at least 30" in depth to allow for
changeable displays. Tack-on display
November 13, 2020 PAGE NO. 8
tdhengineering.com
Sidewalk width 12 feet minimum between curb edge and
storefront (area includes clear/buffer
zone with street trees). Setbacks and
utility easements must also be
considered and may result in a larger
minimum sidewalk width.
12-foot minimum sidewalk has been provided
between curb edge and storefront.
Special Residential Block Frontage Standards (Applies to Buildings 2/B & 3/C)
38.510.030.J. Requires: Special residential block frontage standards along sidewalks and
internal pathways. For residences with ground floor living spaces facing a sidewalk or
pedestrian path in a residential or mixed-use development, the building must feature at least
one of the public/private space transition elements described below. The objective of this
standard is to ensure privacy and security for residents, and an attractive and safe pathway that
complements the qualities of adjoining residences within a residential complex.
The applicant has chosen to implement:
Raised deck or porch option. Provide at least a 60 square foot porch or deck raised at least one
foot above grade. The porch or deck must be at least six feet deep, measured perpendicular to
the building face. (The deck may be recessed into the unit floor plan so that deck does not
extend from the building face a full six feet.) A low fence, rail or hedge, two feet to four feet high,
may be integrated between the sidewalk or internal pathway and deck or porch.
A director’s determination was made in the comments provided:
The six feet deep porch must extend at least three feet from the building face so that the
building face is no closer than six feet (three feet porch, three feet landscape) front the
internal pedestrian pathway. While the code states that the deck may be recessed into the
unit floor plan so that the deck does not extend from the building face a full six feet, the
Directors determination is that at least 50% of the porch or deck must extend past the building
face in order to meet the objectives of the special residential block frontage.
A review of this decision is being made as a part of this submittal, see Appendix P. The
owner’s believe they meet the intent of this code section and have provided additional
information to help illustrate how a variety of porch/deck recession and projection help define
and scale the building. In all cases there is a minimum of 3-foot of landscaping provided
between the sidewalk and the porch/deck.
Block Frontage Locations and Section are provided on Sheet EX-3 Block Frontage Plan &
Sections.
Trail/park Block Frontage Standards (Applies to Walton Stream Ditch)
38.510.030.I. Trail/park frontages. Where a property fronts onto a park or a public trail, such
frontages must comply with the mixed block frontage standards set forth in subsection D of this
section. For non-residential developments/uses where the review authority determines that an
orientation to the trail would not be appropriate based on the context of the site, the development
must be subject to the standards for "other block frontages" set forth in subsection G above,
with a minimum building setback of 20 feet from the applicable park/trail right-of-way, easement,
or property line.
23
November 13, 2020 PAGE NO. 9
tdhengineering.com
Based on comments provided from the City the Owners are requesting a deviation to not
place a building on the Trail/Park frontage and only place parking on that frontage. See
deviation request included in this submittal.
RESIDENTIAL OPEN SPACE
The UDC requires residential open space at the rate of 150 sq. ft. per dwelling unit for
dwellings with two or more bedrooms and 100 sq. ft. per dwelling unit for studio or one-
bedroom dwellings. The development is proposing:
• 198 Studio/One Bedroom Units
• 106 Two Bedroom Units
Based on these standards the development is required to provide 35,700 sq. ft. of residential
open space. The developers are proposing the following to meet the residential open space.
• Private Patios: ±20,504 minimum (no patios will be provided on buildings along
Tschache Lane due to commercial on first floor, the private patio area will be split
between the remaining 245 units on site)
• Other Amenity Areas: ±21,010 sq. ft.
• Total: 41,514 sq. ft.
• Amenities include:
o Pool/Spa Courtyard
o Fitness Center (Interior)
o Bike Tuning (Interior)
o Entry Plaza – including multi-purpose space with amenities such as a fire pit,
seating, hammocks, space for public art lawn area for informal recreation and
walkways and decorative landscape areas to enhance the seating for
residents.
See EX-1 Conceptual Site Plan for specific locations.
COMMERCIAL OPEN SPACE
The UDC requires new developments with non-residential uses on sites with a total site area
greater than one acre to provide open space equal to at least two percent of the development
envelope. The commercial development envelop is broken down by building.
Building 1/A: Approximately 59,958 sq. ft., based on that area approximately 1,139 sq. ft. of
commercial open space is required and 1,982 sq. ft. is provided. Seating is also required in
the commercial open space at a rate of 2 linear feet per 60 sq. ft. Based on 1,139 sq. ft. of
required commercial open space 38 linear feet of seating is required. The development is
providing 42 linear feet of seating. Amenities include sidewalk, landscaping & seating areas
beyond the 12-foot Storefront Block Frontage.
Building 4/D: Approximately 38,177 sq. ft., based on that area approximately 764 sq. ft. of
commercial open space is required and 1,205 sq. ft. is provided. Seating is also required in
the commercial open space at a rate of 2 linear feet per 60 sq. ft. Based on 764 sq. ft. of
required commercial open space 26 linear feet of seating is required. The development is
providing 30 linear feet of seating. Amenities include sidewalk, landscaping & seating areas
beyond the 12-foot Storefront Block Frontage.
See EX-1 Conceptual Site Plan for specific locations.
24
November 13, 2020 PAGE NO. 10
tdhengineering.com
PARKING LOT LANDSCAPING
The UDC requires 20 sq. ft. of landscaped area per parking space in the parking lot area.
There are 522 parking spaces proposed therefore 10,440 sq. ft. of parking lot landscaping is
required. The design includes ±10,565 sq. ft. of parking lot landscaping.
See EX-2 Parking Layout & Calcs.
BICYCLE PARKING
The UDC requires bike parking for 10% of the required vehicular parking. There are 522
vehicular parking spaces, which would require 52 bicycle parking spaces. Based on the
current site plan there are 80 bicycle parking spaces proposed on the site. All bike parking
will be provided on concrete pads.
See EX-2 Parking Layout & Calcs.
AFFORDABLE HOUSING
The UDC has a provision for Affordable Housing Section 38.380. This development is
exempt from the affordable housing provision based on Section 38.380.030.E, which states:
Exemptions. Developments comprised exclusively of rental housing units are exempt from this
article.
TRASH
The Owner’s are proposing to have internal trash chutes within the Buildings 2/B & 3/C.
These dumpsters would be rolled out to a laydown curb as shown on the site plan. Buildings
1/A and 4/D will utilize the associated trash enclosures.
WATER RIGHTS
The City has provided preliminary water rights cost information as shown in the following
table. The City also noted that the developers have the option to reduce the CILWR fee
amount by approximately 20% if the Owners agree to install certain high efficiency fixtures
within the residential units (high efficiency clothes washers, shower heads, and toilets. The
owners are still exploring the options at this time.
\
J:\2016\16-268 Farran Boz East Tschache Ln\DOCUMENTS\DEVELOPMENT REVIEW\04_RE
RESUBMITTAL-3\SITE PLAN\02_NARRATIVES_RESPONSES-PHOTOGRAPHS\2.5_Boz East Mixed-
Use_Development Review-Narrative-DONE.docx
25
A1
DEVELOPMENT REVIEW APPLICATION
PROJECT IMAGE
PROJECT INFORMATION
Project name:
Project type(s):
Description:
Street address:
Block frontage:
Number of buildings:
Type and Number of dwellings:
Non-residential building size(s):
(in stories)
Non-residential building height(s):
Number of parking spaces:
Affordable housing (Y/N):
Cash in lieu of parkland (Y/N):
VICINITY MAP
CITY USE ONLY
Submittal date:
Application file number:
Planner:
DRC required (Y/N): Revision Date:
Development Review Application A1 Page 1 of 3 Revision Date: 5.16.18
REQUIRED FORMS: Varies by project type, PLS
Bozeman East Mixed-Use
Mixed-Use: Commerical & Residential Apartments
Mixed-use project with ground floor commercial along Tschache
& 305 residential apartments
1400 N 19th Ave, Bozeman, MT
Zip code: 59718
Zoning: B-2
Gross lot area: 11.85 acres
Mixed Storefront Section / Special Residential
4
305 Residential Apartments
18,043 sq. ft. of Commercial
525
No
Yes, See Narrative
26
DEVELOPMENT REVIEW APPLICATION
1. PROPERTY OWNER
Name:
Full address (with zip code):
Phone:
Email:
2. APPLICANT
Name:
Full address (with zip code):
Phone:
Email:
3. REPRESENTATIVE
Name:
Full address (with zip code):
Phone:
Email:
4. SPECIAL DISTRICTS
Overlay District: Neighborhood Conservation None
Urban
Renewal District: Downtown North 7th Avenue Northeast North Park None
5. CERTIFICATIONS AND SIGNATURES
This application must be signed by both the applicant(s) and the property owner(s) (if different) for all application types before the
submittal will be accepted. The only exception to this is an informal review application that may be signed by the applicant(s) only.
As indicated by the signature(s) below, the applicant(s) and property owner(s) submit this application for review under the terms
and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development
approved by the City of Bozeman shall be in conformance with the requirements of the Bozeman Municipal Code and any special
conditions established by the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may
be assessed for my project. Further, I agree to grant City personnel and other review agency representative’s access to the subject
site during the course of the review process (Section 38.34.050, BMC). I (We) hereby certify that the above information is true
and correct to the best of my (our) knowledge.
Certification of Completion and Compliance – I understand that conditions of approval may be applied to the application and that
I will comply with any conditions of approval or make necessary corrections to the application materials in order to comply with
municipal code provisions.
Statement of Intent to Construct According to the Final Plan – I acknowledge that construction not in compliance with the approved
final plan may result in delays of occupancy or costs to correct noncompliance.
continued on next page
Development Review Application A1 Page 2 of 3 Revision Date: 5.16.18
REQUIRED FORMS: Varies by project type, PLS
Saccoccia Lands, LLC - Philip Saccoccia Jr Managing Member
1234 Springhill Road, Belgrade, MT 59714
(228) 326-4447
philsac@gmail.com
Bridger Peak Land Developmet Partners, LLC - Jim McLeod
101 East Front Street, Suite 304, Missoula, MT 59802
(406) 541-4653
jmcleod@farranco.com
TD&H Engineering - Jana Cooper, PLA
1800 River Dr N, Great Falls, MT 59401
(406) 761-3010
jana.cooper@tdhengineering.com
27
DEVELOPMENT REVIEW APPLICATION
Applicant Signature:
Printed Name:
Owner Signature:
Printed Name:
Owner Signature:
Printed Name:
If signing as a corporation or LLC, please provide the title and position of the individual signing on behalf of the corporation/LLC.
Attach separate sheets for additional owner signatures.
6. APPLICATION TYPES
Check all that apply, use noted forms.
1. Pre-application Consultation
2. Master Site Plan
3. Site Plan
4. Subdivision pre-application
5. Subdivision preliminary plan
6. Subdivision final plan
7. Subdivision exemption
8. Condominium Review
9. PUD concept plan
10. PUD preliminary plan
11. PUD final plan
12. Annexation and Initial Zoning
13. Administrative Interpretation Appeal
14. Administrative Project Decision Appeal
. Commercial Non-residential COA
16. Historic Neighborhood
Conservation Overlay COA
17. Informal Review
18. Zoning Deviation/Departure
. Zoning or Subdivision Variance
. Conditional Use Permit
21. Special Temporary Use Permit
22. Special Use Permit
23. Regulated Activities in Wetlands
24. Zone Map Amendment (non-Annexation)
25. UDC Text Amendment
26. Growth Policy Amendment
27. Modification/Plan Amendment
. Extension of Approved Plan
. Reasonable Accommodation
30. Comprehensive Sign Plan
31. Other:
CONTACT US
FORM FORM
None INF
MSP None
SP 19 Z/SVAR
PA 20 CUP
PP STUP
FP SUP
SE WR
CR ZMA
PUDC ZTA
PUDP GPA
PUDFP MOD
ANNX 28 EXT
AIA 29 RA
APA CSP
15 CCOA
A1
DEVELOPMENT REVIEW APPLICATION
PROJECT IMAGE
PROJECT INFORMATION
Project name:
Project type(s):
Description:
Street address:
Block frontage:
Number of buildings:
Type and Number of dwellings:
Non-residential building size(s):
(in stories)
Non-residential building height(s):
Number of parking spaces:
Affordable housing (Y/N):
Cash in lieu of parkland (Y/N):
VICINITY MAP
CITY USE ONLY
Submittal date:
Application file number:
Planner:
DRC required (Y/N): Revision Date:
Development Review Application A1 Page 1 of 3 Revision Date: 5.16.18
REQUIRED FORMS: Varies by project type, PLS
Bozeman East Mixed-Use
Mixed-Use: Commerical & Residential Apartments
Mixed-use project with ground floor commercial along Tschache
& 305 residential apartments
1400 N 19th Ave, Bozeman, MT
Zip code: 59718
Zoning: B-2
Gross lot area: 11.85 acres
Mixed Storefront Section / Special Residential
4
305 Residential Apartments
18,043 sq. ft. of Commercial
525
No
Yes, See Narrative
29
DEVELOPMENT REVIEW APPLICATION
1. PROPERTY OWNER
Name:
Full address (with zip code):
Phone:
Email:
2. APPLICANT
Name:
Full address (with zip code):
Phone:
Email:
3. REPRESENTATIVE
Name:
Full address (with zip code):
Phone:
Email:
4. SPECIAL DISTRICTS
Overlay District: Neighborhood Conservation None
Urban
Renewal District: Downtown North 7th Avenue Northeast North Park None
5. CERTIFICATIONS AND SIGNATURES
This application must be signed by both the applicant(s) and the property owner(s) (if different) for all application types before the
submittal will be accepted. The only exception to this is an informal review application that may be signed by the applicant(s) only.
As indicated by the signature(s) below, the applicant(s) and property owner(s) submit this application for review under the terms
and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development
approved by the City of Bozeman shall be in conformance with the requirements of the Bozeman Municipal Code and any special
conditions established by the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may
be assessed for my project. Further, I agree to grant City personnel and other review agency representative’s access to the subject
site during the course of the review process (Section 38.34.050, BMC). I (We) hereby certify that the above information is true
and correct to the best of my (our) knowledge.
Certification of Completion and Compliance – I understand that conditions of approval may be applied to the application and that
I will comply with any conditions of approval or make necessary corrections to the application materials in order to comply with
municipal code provisions.
Statement of Intent to Construct According to the Final Plan – I acknowledge that construction not in compliance with the approved
final plan may result in delays of occupancy or costs to correct noncompliance.
continued on next page
Development Review Application A1 Page 2 of 3 Revision Date: 5.16.18
REQUIRED FORMS: Varies by project type, PLS
Saccoccia Lands, LLC - Philip Saccoccia Jr Managing Member
1234 Springhill Road, Belgrade, MT 59714
(228) 326-4447
philsac@gmail.com
Bridger Peak Land Developmet Partners, LLC - Jim McLeod
101 East Front Street, Suite 304, Missoula, MT 59802
(406) 541-4653
jmcleod@farranco.com
TD&H Engineering - Jana Cooper, PLA
1800 River Dr N, Great Falls, MT 59401
(406) 761-3010
jana.cooper@tdhengineering.com
30
DEVELOPMENT REVIEW APPLICATION
Applicant Signature:
Printed Name:
Owner Signature:
Printed Name:
Owner Signature:
Printed Name:
If signing as a corporation or LLC, please provide the title and position of the individual signing on behalf of the corporation/LLC.
Attach separate sheets for additional owner signatures.
6. APPLICATION TYPES
Check all that apply, use noted forms.
1. Pre-application Consultation
2. Master Site Plan
3. Site Plan
4. Subdivision pre-application
5. Subdivision preliminary plan
6. Subdivision final plan
7. Subdivision exemption
8. Condominium Review
9. PUD concept plan
10. PUD preliminary plan
11. PUD final plan
12. Annexation and Initial Zoning
13. Administrative Interpretation Appeal
14. Administrative Project Decision Appeal
. Commercial Non-residential COA
16. Historic Neighborhood
Conservation Overlay COA
17. Informal Review
18. Zoning Deviation/Departure
. Zoning or Subdivision Variance
. Conditional Use Permit
21. Special Temporary Use Permit
22. Special Use Permit
23. Regulated Activities in Wetlands
24. Zone Map Amendment (non-Annexation)
25. UDC Text Amendment
26. Growth Policy Amendment
27. Modification/Plan Amendment
. Extension of Approved Plan
. Reasonable Accommodation
30. Comprehensive Sign Plan
31. Other:
CONTACT US
FORM FORM
None INF
MSP None
SP 19 Z/SVAR
PA 20 CUP
PP STUP
FP SUP
SE WR
CR ZMA
PUDC ZTA
PUDP GPA
PUDFP MOD
ANNX 28 EXT
AIA 29 RA
APA CSP
15 CCOA
Memorandum
REPORT TO: Recreation and Parks Advisory Board
FROM: Addi Jadin, Parks Planning and Development Manager
SUBJECT: 20224 West Side Flats Master Site Plan – Park Proposal
MEETING DATE: January 28, 2021
AGENDA ITEM TYPE: Community Development - Legislative
RECOMMENDATION: Having reviewed and considered the application materials, public comment,
and all the information presented, I hereby adopt the findings presented in
the staff report for application 20224 and move to recommend approval
with conditions and subject to all applicable code provisions.
STRATEGIC PLAN: 3.4 Active Recreation: Facilitate and promote recreational opportunities and
active health programs and facilities.
BACKGROUND:
Pursuant to section 38.420.030.A, BMC, the review authority may determine
whether the park dedication must be a land dedication, cash donation in-lieu
of land dedication or a combination of both. For the purposes of this section
construction of park improvements above the minimum improvements
required by ordinance may be allowed as a method of cash donation. All
proposed dedication of land and cash-in-lieu must meet standards of
38.420., BMC.
The Bozeman City Commission delegated authority to the Parks and
Recreation Director the authority to evaluate requests for authorization of
accepting cash-in-lieu and improvements-in-lieu of parkland dedication
through Resolution 4614. Further, Resolution #4784 establishes criteria for
evaluation of requests for use of cash-in-lieu and improvements-in-lieu of
parkland dedication pursuant to section 38.420.030. This delegation
includes approval of acceptance of improvements-in-lieu as a subset of cash-
in-lieu. Additional guidance is given in Resolution 4784, subsection 3, which
may preclude acceptance of cash/improvements-in-lieu even if other criteria
are favorable.
UNRESOLVED ISSUES: NA
32
ALTERNATIVES: As recommended by the committee
FISCAL EFFECTS: Cash-in-lieu of Parkland is proposed
Attachments:
2021-01-28.Westside Flats CILP Worksheet.docx
Public Access Easement-Trail (DRAFT) 10-28-2020.pdf
001 Cover 10-28-2020.pdf
003 C1.1 Phasing Plan 10-28-2020.pdf
016 L101 Master Landscape Plan 10-28-2020.pdf
018 L103 Enlarged Landscape Plan 10-28-2020.pdf
019 L104 Enlarged Landscape Plan 10-28-2020.pdf
020 L105 Enlarged Landscape Plan 10-28-2020.pdf
021 L201 Landscape Details 10-28-2020.pdf
017 L102 Enlarged Landscape Plan 10-28-2020.pdf
Report compiled on: January 22, 2021
33
MEMORANDUM
----------------------------------------------------------------------------------------------------------
TO: RECREATION AND PARKS ADVISORY BOARD – SUBDIVISION REVIEW COMMITTEE
FROM: ADDI JADIN, PARKS PLANNING AND DEVELOPMENT MANAGER
RE: 20224 West Side Flats Master Site Plan – Park Proposal
DATE: January 22, 2021
----------------------------------------------------------------------------------------------------------
Pursuant to section 38.420.030.A, BMC, the review authority may determine whether the park dedication must be a
land dedication, cash donation in-lieu of land dedication or a combination of both. For the purposes of this section
construction of park improvements above the minimum improvements required by ordinance may be allowed as a
method of cash donation. All proposed dedication of land and cash-in-lieu must meet standards of 38.420., BMC.
Project Info
Zoning Classification: R-O
Description: MIXED USE DEVELOPMENT WITH 31 RESIDENTIAL UNITS
Calculations
WITH DENSITY CAP
Parcel size 6.74 acres
Units 132
Density 19.6 units/acre
With Density Cap Yes: 12 DU per acre x 6.74 acres = Parkland owed for
80.88 units
Land area required 80.88 units x 0.03 acres/unit = 2.43 acres 105,850.8 sf
Value per sq/ft City established value $1.60
City approved cost appraisal NA
Total cash value $169,361.28
Improvements in lieu Proposed $10,067.40
Review Criteria
The Bozeman City Commission delegated authority to the Parks and Recreation Director the authority to evaluate
requests for authorization of accepting cash-in-lieu and improvements-in-lieu of parkland dedication through Resolution
4614. Further, Resolution #4784 establishes criteria for evaluation of requests for use of cash-in-lieu and
improvements-in-lieu of parkland dedication pursuant to section 38.420.030.
34
This delegation includes approval of acceptance of improvements-in-lieu as a subset of cash-in-lieu. Additional
guidance is given in Resolution 4784, subsection 3, which may preclude acceptance of cash/improvements-in-lieu
even if other criteria are favorable.
Findings
FINDINGS, CHECK ALL THAT APPLY
The City’s preference for acquisition of real property for parks.
The desirability and suitability of land within or proposed by the developer for parks and
playground based on size, topography, shape, water supply, location or other circumstance.
Proximity of the development to existing parks and recreation facilities.
Type, function of and facilities including within nearby park(s) (i.e. pocket parks, special use
park, neighborhood park, community park, etc.).
The level of service (as defined in the adopted city-wide park master plan) provided by nearby
parks(s).
Correspondence with the City’s adopted city-wide park master plan.
Whether the proposal provides an opportunity for partnerships, or whether grant funds are
currently available.
Whether the developer or future property owners are required to particulate in the costs of
maintenance of nearby park or recreational facilities.
Long term availability of city funds for maintenance of the proposed facilities.
The expressed preference of the developer.
WHEN CASH-IN-LIEU WILL ALWAYS BE ACCCEPTED
Development is located within the B-3 zoning district
Section 38.420.020.A requires payment of cash-in-lieu.
FACTORS FOR CONSIDERAION OF IMPROVEMENTS-IN-LIEU
are consistent with the master plan for the park where the improvements are proposed,
Are included in the city’s most recently adopted city-wide park master plan, or
Are included on the capital improvement program for the Parks and Recreation Department.
35
Must be consistent with the city’s approved specifications for park equipment and
improvement; and.
THE REQUEST DOES NOT MEET THE STANDARDS FOR CASH-IN-LIEU OF PARKLAND
DEDICATION.
DIRECTOR SIGNATURE
Mitchell J. Overton, MS, CPRP , Director, Parks & Recreation
CONDITIONS OF APPROVAL
1 Edit parkland tracking table on 001 Cover Sheet to remove the word “park” from area granted
and use easement instead
2
CODE CORRECTIONS
1
2
36
RETURN RECORDED DEED TO:
Bozeman City Clerk
PO Box 1231
Bozeman, MT 59771-1231
PUBLIC TRAIL ACCESS EASEMENT
Island, LLC., a Montana limited liability company, with a mailing address of P.O. Box 12037,
Bozeman, MT 59719, GRANTOR, in consideration of $ 1.00 and for other good and valuable
consideration, receipt of which is hereby acknowledged, grants to The City of Bozeman, a
Municipal Corporation of the State of Montana, with offices at 121 North Rouse Avenue,
Bozeman, Montana 59715, GRANTEE, a public trail access easement for the use of the public
in, over, through and across as strip of land 30 feet wide and 35 feet wide situated on the
following described property in Gallatin County, Montana:
Lot R-2, J&D Family Major Subdivision, Phase 2 [Plat J-610], located in the SE 1/4 of
Section 9, T. 2 S., R. 5 E. of P.M.M., City of Bozeman, Gallatin County, Montana.
The easement is more particularly shown and dimensioned on the attached Exhibit A, which by
this reference is made a part of this document.
The GRANTOR(S) agrees:
(1) To construct and maintain the trails in the easement as described in said Exhibit A at
their own expense in accordance with relevant City Ordinances, including, but not limited
to, snow removal and all major and minor repair work.
(2) To allow the City to make any and all inspections of the trails and land appurtenant
thereto as the City reasonably deems necessary.
The GRANTOR warrants that it is lawfully seized and possessed of the real property
described above, that it has a lawful right to convey the property, or any part of it, and that it will
forever defend the title to this property against the claims of all persons.
The GRANTOR further agrees that the GRANTEE may peaceably hold and enjoy the rights
and privileges herein granted without any interruption by the GRANTOR. The terms, covenants
and provisions of this easement shall extend to and be binding upon the heirs, executors,
administrators, personal representatives, successors and assigns of the parties hereto.
Islands, LLC, a Montana limited liability company
__________________________________
By: W. Mark Easton, Member
STATE OF ____________ )
) ss.
County of _____________ )
This instrument was signed or acknowledged before me on this ____ day of ________________,
2020, by W. Mark Easton as a member of Island, LLC., a Montana limited liability company.
_______________________________________ (SEAL)
Notary Public for the State of _______________
Printed Name: ______________________
Residing at: _______________, _________
My Commission Expires _____/ ______, 20 ____.
37
ACCEPTED: CITY OF BOZEMAN
____________________________________
By: Jeff Mihelich; City Manager
ATTEST:
Mike Maas, City Clerk
STATE OF MONTANA )
)ss.
County of Gallatin )
On this ________ day of ___________________, 2020, before me, a Notary Public for the State
of Montana, personally appeared DENNIS TAYLOR and MIKE MAAS, known to me to be the
City Manager and City Clerk, respectively, of the City of Bozeman, and the persons whose
names are subscribed to the within instrument, and acknowledged to me that they executed the
same for and on behalf of the City of Bozeman.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my Notarial Seal the day
and year first above written.
Notary Public for the State of Montana (SEAL)
Printed Name: ________________________
Residing at
My Commission Expires / /20
G:\C&H\18\180820\Site Plan\EASEMENTS\Public Access Easement-Trail.Doc
38
39
CT CERAMIC TILE OD OUTSIDE DIAMETER
POLYVINYL CHLORIDE
POUND PER SQ. FOOT
POUND PER SQ. INCH
SOLID CORE
ROUGH OPENING
REINFORCING
REFERENCE
OVERHANG
PAVEMENT
PARTICLE BOARD
PER LINEAR FOOT
STRUCTURE(AL)
WELDED WIRE FABRIC
WIDE, WIDTH
VINYL COMPOSITION TILE
UNIFORM BUILDING CODE
TONGUE AND GROOVE
WATERPROOF(ING)
WATER CLOSET
VINYL BASE
THICK(NESS)
ROUGH WOOD
FINISH WOOD
ACOUSTIC TILE
BATT INSULATION
RIGID INSULATION
SPECIFICATION
MASONRY
METAL
EARTH
GRAVEL
CONCRETE
ELEC
CONC
CONST
INSUL
INCL
HVAC
GYP BD
GC
LL
JT
LAM
INT
HM
HR
HC
FIN
FTG
GA
FBO
FP
FLR
FC
FF
EXP
EXT
EXG
DTL
10/29/20
41
SHEET L102 SHEET L102
SHEET L103 SHEET L103
SHEET L103
SHEET L104
SHEET L104 SHEET L104
SHEET L105 SHEET L105
SHEET L103
SHEET L104
BOZEMAN U.D.O. REQUIREMENTS
PARKING LOT LANDSCAPING
TOTAL PARKING STALLS: 262
LANDSCAPE AREA REQUIRED: 5240 SF; 8529 SF SHOWN
29 PARKING LOT TREES REQUIRED, 30 SHOWN
BOULEVARD TREES:
1 LARGE CANOPY TREE PROVIDED FOR EACH 50' OF STREET FRONTAGE
ON FALLON AND WEST BABCOCK STREET
RESIDENTIAL ADJACENCY:
1 LARGE CANOPY TREE OR NON-CANOPY TREE PROVIDED FOR EACH 50
LINEAR FT. OF RESIDENTIAL ADJACENCY. ALONG WEST PROPERTY LINE.
DROUGHT TOLERANT SPECIES:
75% OF TREES AND SHRUBS USED ARE DROUGHT TOLERANT SPECIES
(EXCLUDES WATERCOURSE SETBACK SPECIES)
WATERCOURSE SETBACK
TOTAL LF:1287 LF , 1 TREE PER 30 LF & 1 SHRUBS REQUIRED PER 10 LF
IN ZONE 1 OF WATERCOURSE SETBACK. 43 TREES AND 129 SHRUBS,
469 LF ON BOTH SIDES OF CREEK-ADDITIONAL 16 TRESS AND 47 SHRUBS
REQUIRED ON EAST SIDE OF BAXTER CREEK.
60 TREES AND 180 SHRUBS PROVIDED
IRRIGATION GENERAL NOTES
1.
THIS IRRIGATION PLAN IS CONCEPTUAL IN NATURE AND FINAL DESIGN SHALL
BE VERIFIED BY IRRIGATION CONTRACTOR. IRRIGATION SYSTEM TO BE
DESIGN/BUILD BY A PROFESSIONAL IRRIGATION CONTRACTOR PER THE
REQUIREMENTS BELOW.
2.
A BACKFLOW PREVENTER SHALL BE PROFESSIONALLY INSTALLED AS PER THE
CITY OF BOZEMAN REQUIREMENTS
3.
A PRESSURE RELEASE VALVE/REGULATOR MAY BE NEEDED DEPENDING ON
THE PSI AT POINT OF CONNECTION
4.
IRRIGATION POC WILL BE CONNECTED TO CITY SERVICE
5.
IRRIGATION DESIGN ASSUMES 25-28GPM FROM WATER SOURCE
6.
CARE SHALL BE TAKEN TO ENSURE IRRIGATION SYSTEM IS INSTALLED
PROPERLY TO MINIMIZE/ELIMINATE WATER WASTE DUE TO OVER SPRAY ONTO
WALKS AND PARKING LOTS.
7.
IRRIGATION CONTRACTOR SHALL INSTALL A RAINBIRD (OR SIMILAR) RAIN
SENSOR THAT WILL AUTOMATICALLY TURN OFF THE SYSTEM DURING RAIN
EVENTS
8.
POWER SOURCE TO BE PROVIDED FOR IRRIGATION CONTROLLER AND
COORDINATED WITH ELECTRICAL.
7.
ALL TURF AREAS ARE TO BE SPRAY OR ROTOR IRRIGATED. MPR NOZZLES OR
SIMILAR SHALL BE INSTALLED IN LAWN AREAS WHERE FEASIBLE TO MAXIMIZE
EFFICIENCY. IRRIGATION SYSTEM TO BE INSTALLED WITH HEAD TO HEAD
COVERAGE FOR ALL ROTOR AND SPRAY ZONES.
RETENTION
POND
RETENTION
POND
GRAVEL FINES TRAIL
IRRIGATED
TURF
IRRIGATED
TURF
BAXTER CREEK
SITE TRIANGLE
BLDG #3
18-PLEX
BLDG #2
18-PLEX
BLDG #4
12-PLEX
BLDG #6
18-PLEX
RETENTION
POND
NATIVE
SEED MIX
NATIVE
SEED MIX
RETENTION
POND
PHASE 1
PHASE 2
PHASE 1
PHASE 2
IRRIGATED
TURF
AM BANK
TOP OF STREAM BANK
STREAM
EDGE OF
EXISTING
WETLANDS
NATIVE
SEED MIX
SNOW
STORAGE
SNOW
SNOW
CONIFERS QTY BOTANICAL / COMMON NAME CONT CAL SIZE MATURE SIZE DROUGHT TOLERANT
14 Juniperus scopulorum `Medora` / Medora Juniper 10 gal 10-12` Yes
4 Picea pungens / Colorado Spruce B & B 8`-10` 50`-60` Yes
15 Pinus nigra / Austrian Black Pine B & B 8`-10` 40`-50` Yes
DECIDUOUS TREES QTY BOTANICAL / COMMON NAME CONT CAL SIZE MATURE SIZE DROUGHT TOLERANT
21 Acer platanoides `Emerald Queen` / Emerald Queen Maple B & B 1.5"-2.0" 50`-60` Yes
4 Acer rubrum `Northwood` / Northwood Maple B & B 1.5"-2.0" 40`-50` No
8 Celtis occidentalis / Common Hackberry B & B 1.5"-2.0" 30`-40` Yes
57 Populus tremuloides / Quaking Aspen B & B 1.5"Cal 35`-45` No
7 Quercus macrocarpa / Burr Oak B & B 1.5"-2.0" 50`-60` Yes
8 Syringa reticulata `Ivory Silk` / Ivory Silk Japanese Tree Lilac B & B 1.5 - 2" cal 20-30` Yes
14 Tilia americana `Boulevard` / Boulevard Linden B & B 1.5"-2.0" 40`-50` No
9 Tilia cordata / Littleleaf Linden B & B 1.5"-2.0" 35`-45` Yes
5 Ulmus davidiana japonica `Discovery` / Discovery Elm B & B 1.5"-2.0" 40`-50` Yes
SHRUBS QTY BOTANICAL / COMMON NAME SIZE MATURE SIZE DROUGHT TOLERANT
IRRIGATED
TURF?
SNOW
STORAGE
GRAVEL FINES TRAIL
OPEN SPACE
SNOW STORAGE
STORAGE
SNOW
SNOW
GRAVEL FINES TRAIL
IRRIGATED
TURF
IRRIGATED
TURF
IRRIGATED
TURF
IRRIGATED
TURF
BLDG #6
18-PLEX
BLDG #5
12-PLEX
BLDG #7
12-PLEX
BLDG #9
18-PLEX
BAXTER CREEK
RETENTION
POND
RETENTION
POND
NATIVE
SEED MIX
RETENTION
POND
PHASE 2
PHASE 3
PHASE 2
PHASE 3
TOP OF STREAM BANK
STREAM
EDGE OF
EXISTING
WETLANDS
EDGE OF
EXISTING
WETLANDS
50' WETLAND
SETBACK
50' WETLAND
SETBACK
SNOW
STORAGE
CONIFERS QTY BOTANICAL / COMMON NAME CONT CAL SIZE MATURE SIZE DROUGHT TOLERANT
14 Juniperus scopulorum `Medora` / Medora Juniper 10 gal 10-12` Yes
4 Picea pungens / Colorado Spruce B & B 8`-10` 50`-60` Yes
15 Pinus nigra / Austrian Black Pine B & B 8`-10` 40`-50` Yes
DECIDUOUS TREES QTY BOTANICAL / COMMON NAME CONT CAL SIZE MATURE SIZE DROUGHT TOLERANT
21 Acer platanoides `Emerald Queen` / Emerald Queen Maple B & B 1.5"-2.0" 50`-60` Yes
EXISTING
POND
RETENTION
POND
GRAVEL FINES TRAIL
OPEN SPACE
SNOW STORAGE
NATIVE
SEED MIX
IRRIGATED
TURF
SITE TRIANGLE
BLDG #9
18-PLEX
BLDG #8
12-PLEX
BAXTER CREEK
IRRIGATED TURF
IRRIGATED
TURF
NATIVE
SEED MIX
RETENTION
POND
RETENTION
POND
SNOW
STORAGE
SNOW
TOP OF STREAM BANK
STREAM
EDGE OF
EXISTING
WETLANDS
50' WETLAND
SETBACK
WETLANDS
20' x 20'
CONCRETE PAD
WITH WORKOUT
STAIONS
SEE SHEET L201
NATIVE SEED
MIX
CONIFERS QTY BOTANICAL / COMMON NAME CONT CAL SIZE MATURE SIZE DROUGHT TOLERANT
14 Juniperus scopulorum `Medora` / Medora Juniper 10 gal 10-12` Yes
4 Picea pungens / Colorado Spruce B & B 8`-10` 50`-60` Yes
15 Pinus nigra / Austrian Black Pine B & B 8`-10` 40`-50` Yes
DECIDUOUS TREES QTY BOTANICAL / COMMON NAME CONT CAL SIZE MATURE SIZE DROUGHT TOLERANT
21 Acer platanoides `Emerald Queen` / Emerald Queen Maple B & B 1.5"-2.0" 50`-60` Yes
4 Acer rubrum `Northwood` / Northwood Maple B & B 1.5"-2.0" 40`-50` No
8 Celtis occidentalis / Common Hackberry B & B 1.5"-2.0" 30`-40` Yes
57 Populus tremuloides / Quaking Aspen B & B 1.5"Cal 35`-45` No
7 Quercus macrocarpa / Burr Oak B & B 1.5"-2.0" 50`-60` Yes
8 Syringa reticulata `Ivory Silk` / Ivory Silk Japanese Tree Lilac B & B 1.5 - 2" cal 20-30` Yes
14 Tilia americana `Boulevard` / Boulevard Linden B & B 1.5"-2.0" 40`-50` No
9 Tilia cordata / Littleleaf Linden B & B 1.5"-2.0" 35`-45` Yes
5 Ulmus davidiana japonica `Discovery` / Discovery Elm B & B 1.5"-2.0" 40`-50` Yes
SHRUBS QTY BOTANICAL / COMMON NAME SIZE MATURE SIZE DROUGHT TOLERANT
3 Amelanchier alnifolia / Serviceberry 5 gal 6`-10` Yes
STAKE WITH 2" WOOD TREE
STAKES AND RUBBER STYLE TIES.
PROVIDE SLACK IN LINE TIES.
STAKES SHALL NOT PENETRATE
ROOT BALL.
MULCH AS SPECIFIED. PULL
MULCH AWAY FROM TRUNK.
TREE IS TO BE PLANTED SLIGHTLY HIGHER
THAN GRADE WITH THE TREE COLLAR
EXPOSED
1. CREATE A SAUCER AROUND TREES TO RETAIN IRRIGATION WATER.
NOTES:
USE PROPER PRUNING
TECHNIQUES TO REMOVE DEAD
OR BROKEN LIMBS, AND
COMPETING APICAL LEADERS
EXCAVATE HOLE:
WIDTH = 3 x DIA. OF ROOTBALL
DEPTH = HEIGHT OF ROOTBALL + 6" MIN.
1
L201 PLANTING DETAIL
TREE
NTS
FINISH GRADE
4'
EDGING
AMENDED TOPSOIL BACKFILL.
OVEREXCAVATE TREE WELL & PROVIDE 6"
MIN. COMPACTED PLANTING SOIL
UNDER TREE BALL AS SHOWN
1. SHRUBS TO BE PLANTED TO BEAR THE SAME RELATION TO FINISH GRADE AS
ORIGINALLY GROWN IN THE NURSERY.
NOTES:
EXCAVATED HOLE 2X DIAMETER
OF ROOTBALL
BACKFILL WITH AMENDED TOPSOIL
REMOVE ROOT
CONTAINMENT
MATERIALS IF
PRESENT
MULCH -PULL MULCH
AWAY FROM STEM. MULCH
3" MIN.
CREATE SAUCER
AROUND SHRUB
PRUNE SHRUB TO
REMOVE DEAD OR
DAMAGED BRANCHES.
2
L201
SHRUB PLANTING DETAIL
NTS
6" MIN.
PERENNIALS AS SHOWN ON PLAN
MULCH W/ 1" SOIL PEP OR
COMPOST
10" MIN. DEPTH OF PLANTING
SOIL MIX
UNDISTURBED SOIL
NOTE:
RETENTION
POND
GRAVEL FINES TRAIL
IRRIGATED
TURF
SITE TRIANGLE
SITE TRIANGLE
BLDG #1
12-PLEX
BLDG #3
18-PLEX
BLDG #2
18-PLEX
BAXTER CREEK
IRRIGATED TURF
IRRIGATED
TURF
OPEN SPACE
OPEN SPACE
IRRIGATED
TURF
NATIVE
EED MIX
NATIVE
SEED MIX
TOP OF STREAM BANK
STREAM
EDGE OF
EXISTING
WETLANDS
SNOW
SNOW
SNOW
SNOW
STORAGE FENCE
FENCE
SNOW
CONIFERS QTY BOTANICAL / COMMON NAME CONT CAL SIZE MATURE SIZE DROUGHT TOLERANT
14 Juniperus scopulorum `Medora` / Medora Juniper 10 gal 10-12` Yes
4 Picea pungens / Colorado Spruce B & B 8`-10` 50`-60` Yes
15 Pinus nigra / Austrian Black Pine B & B 8`-10` 40`-50` Yes
DECIDUOUS TREES QTY BOTANICAL / COMMON NAME CONT CAL SIZE MATURE SIZE DROUGHT TOLERANT
21 Acer platanoides `Emerald Queen` / Emerald Queen Maple B & B 1.5"-2.0" 50`-60` Yes
4 Acer rubrum `Northwood` / Northwood Maple B & B 1.5"-2.0" 40`-50` No
8 Celtis occidentalis / Common Hackberry B & B 1.5"-2.0" 30`-40` Yes
57 Populus tremuloides / Quaking Aspen B & B 1.5"Cal 35`-45` No
7 Quercus macrocarpa / Burr Oak B & B 1.5"-2.0" 50`-60` Yes
8 Syringa reticulata `Ivory Silk` / Ivory Silk Japanese Tree Lilac B & B 1.5 - 2" cal 20-30` Yes
14 Tilia americana `Boulevard` / Boulevard Linden B & B 1.5"-2.0" 40`-50` No
9 Tilia cordata / Littleleaf Linden B & B 1.5"-2.0" 35`-45` Yes
5 Ulmus davidiana japonica `Discovery` / Discovery Elm B & B 1.5"-2.0" 40`-50` Yes
SHRUBS QTY BOTANICAL / COMMON NAME SIZE MATURE SIZE DROUGHT TOLERANT
3 Amelanchier alnifolia / Serviceberry 5 gal 6`-10` Yes
45 Aronia melanocarpa elata / Glossy Black Chokeberry 5 gal 4-8` Yes
27 Cornus sericea `Isanti` / Isanti Redosier Dogwood 5 gal 5`-6` No
53 Cornus stolonifera `Arctic Fire` / Arctic Fire Dogwood 5 gal 4`-5` No
7 Juniperus horizontalis `Blue Chip` / Blue Chip Juniper 5 gal 6-12" Yes
76 Juniperus sabina `Buffalo` / Buffalo Juniper 5 gal 6-12" Yes
27 Physocarpus opulifolius `Seward` / Summer Wine Ninebark 5 gal 5`-6` Yes
9 Picea pungens `Globosa` / Dwarf Globe Blue Spruce 5 gal 4`-5` Yes
46 Pinus mugo `Pumilio` / Mugo Pine 5 gal 5`-6` Yes
52 Potentilla fruticosa `Abbotswood` / Abbotswood Potentilla 5 gal 2`-3` Yes
46 Rhus aromatica `Gro-Low` / Gro-Low Fragrant Sumac 5 gal 2`-3` Yes
21 Ribes alpinum `Green Mound` / Green Mound Alpine Currant 5 gal 2`-3` Yes
68 Rosa x `Morden Sunrise` / Adelaide Hoodless Rose 5 gal 2`-3` Yes
95 Rosa x `Nearly Wild` / Nearly Wild Rose 5 gal 2`-3` Yes
170 Spiraea japonica `Goldflame` / Spirea 5 gal 2`-3` Yes
37 Spiraea x bumalda `Little Princess` / Little Princess Spirea 5 gal 3`-4` Yes
30 Symphoricarpos albus / Common White Snowberry 5 gal 4`-5` Yes
50 Syringa meyeri `Palibin` / Dwarf Korean Lilac 5 gal 4`-5` No
GRASSES QTY BOTANICAL / COMMON NAME SIZE MATURE SIZE DROUGHT TOLERANT
69 Calamagrostis x acutiflora `Karl Foerster` / Feather Reed Grass 1 gal
122 Helictotrichon sempervirens `Blue Oats` / Blue Oat Grass 1 gal
GROUND COVERS QTY BOTANICAL / COMMON NAME CONT
65,013 sf Poa pratensis / Kentucky Bluegrass sod
PLANT SCHEDULE PHASE 1, 2 & 3
DECIDUOUS TREES QTY BOTANICAL / COMMON NAME CONT CAL SIZE MATURE SIZE DROUGHT TOLERANT
40 Populus tremuloides / Quaking Aspen B & B 1.5"Cal 35`-45` No
20 Salix alba vitellina / Golden Willow 15 gal Clump 30`-40` No
SHRUBS QTY BOTANICAL / COMMON NAME SIZE MATURE SIZE DROUGHT TOLERANT
30 Amelanchier alnifolia / Serviceberry 5 gal 6`-10` Yes
94 Cornus sericea `Isanti` / Isanti Redosier Dogwood 5 gal 5`-6` No
56 Symphoricarpos albus / Common White Snowberry 5 gal 4`-5` Yes
PLANT SCHEDULE WATERCOURSE & WETLAND
NOTE: ALL WATERCOURSE PLANTS ARE TO BE FENCED AND IRRIGATED. SMALLER CONTAINER SIZES MAY BE USED
FOR WATERCOURSE TREES AND SHRUBS. MINIMUM 1" CAL. OR 7 GAL. CONTAINER FOR TREES AND 2 GAL.
CONTAINER FOR SHRUBS.
NATIVE SEED MIX:
SMOOTH BROMEGRASS
40%
WESTERN WHEATGRASS
25%
IDAHO FESCUE 25%
CANBY BLUEGRASS
10%
SEEDING RATE: 25 LBS/ACRE
RIPARIAN SEED MIX (DETENTION/RETENTION BASIN):
SLENDER RUSH .5 LBS PER ACRE
WATER SEDGE
1.0 LBS PER ACRE
CREEPING SPIKE RUSH
2.0 LBS PER ACRE
NEBRASKA SEDGE
2.0 LBS PER ACRE
SMALLFRUITED BULL RUSH
.2 LBS PER ACRE
BLUE JOINTED REED GRASS
.5 LBS PER ACRE
N
Project For:
West Side Flats
Fallon St.,
Bozeman, MT
Enlarged
Landscape
Plan
SCALE: 1"=20'-0" L102
6/10/20 City Submittal
Date Issue
3084 Thorpe Road
Belgrade, Montana 59714
Ph 406.924.8038
chad@redbarnmontana.com
11/02/20 Revisions
47
1) SPREAD PLANTING SOIL TO 10" DEPTH, ADDING AMENDMENTS IN
RESPONSE TO SOIL ANALYSIS TO ACHIEVE SPECIFIED SOIL NUTRIENTS,
TEXTURE AND ORGANIC MATTER.
3
L201
PERENNIAL / ORNAMENTAL GRASS PLANTING
NTS
4
L201
LANDSCAPE EDGING
NTS
FINISH GRADE.
STEEL EDGING AS SHOWN. PRO-EDGE
STEEL/ALUMINUM
MULCH AS NOTED.
WEED BARRIER FABRIC. LAP 6" AT JOINTS.
8" STAPLES TO ANCHOR WEED BARRIER, TRIANGULAR
SPACING 3' O.C. AND 1' O.C. LINEAR SPACING AT JOINTS.
3" MIN.
WHERE STEEL EDGING INTERSECTS WITH OTHER STEEL
EDGING, SECURE (BOLT OR WELD) THE TWO PIECES OF
EDGING TOGETHER.
5
L201
BOULDER PLACEMENT
NTS
BURY BOULDERS 1
4 TO
1
3 OF THEIR
HEIGHT BELOW FINISHED GRADE
COMPACTED SUBGRADE
PLANT BED
NOTES:
1) BOULDERS ARE TO BE SET IN PLACE PRIOR TO PLANTING OR
IRRIGATION INSTALLATION.
2) BOULDER TYPE TO BE AS NOTED ON PLAN
3) BOULDERS TO BE IN NATURAL GROUPINGS WITH
VARYING HEIGHTS AND SIZES.
2" THICK CONCRETE PAVER
SLOPE NOT TO EXCEED 4:1
NATIVE TREE AND SHRUB PLANTINGS ON
UPPER EDGES OF GRADE
RIPARIAN SEED MIX IN BOTTOM AND
UP SIDES OF RETENTION POND
SEE PLANT LEGEND
NATIVE SEED MIX ON UPPER EDGES OF GRADE
SEE PLANT LEGEND
6
L201 SECTION
RETENTION POND
NTS
7
L201
FITNESS RACK DETAIL
NTS
NOTES:
1) MODEL #13189
2) MANUFACTURED BY GAME TIME (800) 235-2440
3) SURFACE MOUNT PER MANUFACTURER'S SPECIFICATIONS
8
L201
BENCH DIP STATION DETAIL
NTS
NOTES:
1) MODEL #13580
2) MANUFACTURED BY GAME TIME (800) 235-2440
3) SURFACE MOUNT PER MANUFACTURER'S SPECIFICATIONS
Landscape
Details
L201
06/10/20 City Submittal
Date Issue
3084 Thorpe Road
Belgrade, Montana 59714
Ph 406.924.8038
chad@redbarnmontana.com
Project For:
West Side Flats
Fallon St.,
Bozeman, MT
46
45 Aronia melanocarpa elata / Glossy Black Chokeberry 5 gal 4-8` Yes
27 Cornus sericea `Isanti` / Isanti Redosier Dogwood 5 gal 5`-6` No
53 Cornus stolonifera `Arctic Fire` / Arctic Fire Dogwood 5 gal 4`-5` No
7 Juniperus horizontalis `Blue Chip` / Blue Chip Juniper 5 gal 6-12" Yes
76 Juniperus sabina `Buffalo` / Buffalo Juniper 5 gal 6-12" Yes
27 Physocarpus opulifolius `Seward` / Summer Wine Ninebark 5 gal 5`-6` Yes
9 Picea pungens `Globosa` / Dwarf Globe Blue Spruce 5 gal 4`-5` Yes
46 Pinus mugo `Pumilio` / Mugo Pine 5 gal 5`-6` Yes
52 Potentilla fruticosa `Abbotswood` / Abbotswood Potentilla 5 gal 2`-3` Yes
46 Rhus aromatica `Gro-Low` / Gro-Low Fragrant Sumac 5 gal 2`-3` Yes
21 Ribes alpinum `Green Mound` / Green Mound Alpine Currant 5 gal 2`-3` Yes
68 Rosa x `Morden Sunrise` / Adelaide Hoodless Rose 5 gal 2`-3` Yes
95 Rosa x `Nearly Wild` / Nearly Wild Rose 5 gal 2`-3` Yes
170 Spiraea japonica `Goldflame` / Spirea 5 gal 2`-3` Yes
37 Spiraea x bumalda `Little Princess` / Little Princess Spirea 5 gal 3`-4` Yes
30 Symphoricarpos albus / Common White Snowberry 5 gal 4`-5` Yes
50 Syringa meyeri `Palibin` / Dwarf Korean Lilac 5 gal 4`-5` No
GRASSES QTY BOTANICAL / COMMON NAME SIZE MATURE SIZE DROUGHT TOLERANT
69 Calamagrostis x acutiflora `Karl Foerster` / Feather Reed Grass 1 gal
122 Helictotrichon sempervirens `Blue Oats` / Blue Oat Grass 1 gal
GROUND COVERS QTY BOTANICAL / COMMON NAME CONT
65,013 sf Poa pratensis / Kentucky Bluegrass sod
PLANT SCHEDULE PHASE 1, 2 & 3
DECIDUOUS TREES QTY BOTANICAL / COMMON NAME CONT CAL SIZE MATURE SIZE DROUGHT TOLERANT
40 Populus tremuloides / Quaking Aspen B & B 1.5"Cal 35`-45` No
20 Salix alba vitellina / Golden Willow 15 gal Clump 30`-40` No
SHRUBS QTY BOTANICAL / COMMON NAME SIZE MATURE SIZE DROUGHT TOLERANT
30 Amelanchier alnifolia / Serviceberry 5 gal 6`-10` Yes
94 Cornus sericea `Isanti` / Isanti Redosier Dogwood 5 gal 5`-6` No
56 Symphoricarpos albus / Common White Snowberry 5 gal 4`-5` Yes
PLANT SCHEDULE WATERCOURSE & WETLAND
NOTE: ALL WATERCOURSE PLANTS ARE TO BE FENCED AND IRRIGATED. SMALLER CONTAINER SIZES MAY BE USED
FOR WATERCOURSE TREES AND SHRUBS. MINIMUM 1" CAL. OR 7 GAL. CONTAINER FOR TREES AND 2 GAL.
CONTAINER FOR SHRUBS.
N
Project For:
West Side Flats
Fallon St.,
Bozeman, MT
Enlarged
Landscape
Plan
SCALE: 1"=20'-0" L105
6/10/20 City Submittal
Date Issue
3084 Thorpe Road
Belgrade, Montana 59714
Ph 406.924.8038
chad@redbarnmontana.com
11/02/20 Revisions
45
4 Acer rubrum `Northwood` / Northwood Maple B & B 1.5"-2.0" 40`-50` No
8 Celtis occidentalis / Common Hackberry B & B 1.5"-2.0" 30`-40` Yes
57 Populus tremuloides / Quaking Aspen B & B 1.5"Cal 35`-45` No
7 Quercus macrocarpa / Burr Oak B & B 1.5"-2.0" 50`-60` Yes
8 Syringa reticulata `Ivory Silk` / Ivory Silk Japanese Tree Lilac B & B 1.5 - 2" cal 20-30` Yes
14 Tilia americana `Boulevard` / Boulevard Linden B & B 1.5"-2.0" 40`-50` No
9 Tilia cordata / Littleleaf Linden B & B 1.5"-2.0" 35`-45` Yes
5 Ulmus davidiana japonica `Discovery` / Discovery Elm B & B 1.5"-2.0" 40`-50` Yes
SHRUBS QTY BOTANICAL / COMMON NAME SIZE MATURE SIZE DROUGHT TOLERANT
3 Amelanchier alnifolia / Serviceberry 5 gal 6`-10` Yes
45 Aronia melanocarpa elata / Glossy Black Chokeberry 5 gal 4-8` Yes
27 Cornus sericea `Isanti` / Isanti Redosier Dogwood 5 gal 5`-6` No
53 Cornus stolonifera `Arctic Fire` / Arctic Fire Dogwood 5 gal 4`-5` No
7 Juniperus horizontalis `Blue Chip` / Blue Chip Juniper 5 gal 6-12" Yes
76 Juniperus sabina `Buffalo` / Buffalo Juniper 5 gal 6-12" Yes
27 Physocarpus opulifolius `Seward` / Summer Wine Ninebark 5 gal 5`-6` Yes
9 Picea pungens `Globosa` / Dwarf Globe Blue Spruce 5 gal 4`-5` Yes
46 Pinus mugo `Pumilio` / Mugo Pine 5 gal 5`-6` Yes
52 Potentilla fruticosa `Abbotswood` / Abbotswood Potentilla 5 gal 2`-3` Yes
46 Rhus aromatica `Gro-Low` / Gro-Low Fragrant Sumac 5 gal 2`-3` Yes
21 Ribes alpinum `Green Mound` / Green Mound Alpine Currant 5 gal 2`-3` Yes
68 Rosa x `Morden Sunrise` / Adelaide Hoodless Rose 5 gal 2`-3` Yes
95 Rosa x `Nearly Wild` / Nearly Wild Rose 5 gal 2`-3` Yes
170 Spiraea japonica `Goldflame` / Spirea 5 gal 2`-3` Yes
37 Spiraea x bumalda `Little Princess` / Little Princess Spirea 5 gal 3`-4` Yes
30 Symphoricarpos albus / Common White Snowberry 5 gal 4`-5` Yes
50 Syringa meyeri `Palibin` / Dwarf Korean Lilac 5 gal 4`-5` No
GRASSES QTY BOTANICAL / COMMON NAME SIZE MATURE SIZE DROUGHT TOLERANT
69 Calamagrostis x acutiflora `Karl Foerster` / Feather Reed Grass 1 gal
122 Helictotrichon sempervirens `Blue Oats` / Blue Oat Grass 1 gal
GROUND COVERS QTY BOTANICAL / COMMON NAME CONT
65,013 sf Poa pratensis / Kentucky Bluegrass sod
PLANT SCHEDULE PHASE 1, 2 & 3
DECIDUOUS TREES QTY BOTANICAL / COMMON NAME CONT CAL SIZE MATURE SIZE DROUGHT TOLERANT
40 Populus tremuloides / Quaking Aspen B & B 1.5"Cal 35`-45` No
20 Salix alba vitellina / Golden Willow 15 gal Clump 30`-40` No
SHRUBS QTY BOTANICAL / COMMON NAME SIZE MATURE SIZE DROUGHT TOLERANT
30 Amelanchier alnifolia / Serviceberry 5 gal 6`-10` Yes
94 Cornus sericea `Isanti` / Isanti Redosier Dogwood 5 gal 5`-6` No
56 Symphoricarpos albus / Common White Snowberry 5 gal 4`-5` Yes
PLANT SCHEDULE WATERCOURSE & WETLAND
NOTE: ALL WATERCOURSE PLANTS ARE TO BE FENCED AND IRRIGATED. SMALLER CONTAINER SIZES MAY BE USED
FOR WATERCOURSE TREES AND SHRUBS. MINIMUM 1" CAL. OR 7 GAL. CONTAINER FOR TREES AND 2 GAL.
CONTAINER FOR SHRUBS.
N
Project For:
West Side Flats
Fallon St.,
Bozeman, MT
Enlarged
Landscape
Plan
SCALE: 1"=20'-0" L104
6/10/20 City Submittal
Date Issue
3084 Thorpe Road
Belgrade, Montana 59714
Ph 406.924.8038
chad@redbarnmontana.com
11/02/20 Revisions
44
3 Amelanchier alnifolia / Serviceberry 5 gal 6`-10` Yes
45 Aronia melanocarpa elata / Glossy Black Chokeberry 5 gal 4-8` Yes
27 Cornus sericea `Isanti` / Isanti Redosier Dogwood 5 gal 5`-6` No
53 Cornus stolonifera `Arctic Fire` / Arctic Fire Dogwood 5 gal 4`-5` No
7 Juniperus horizontalis `Blue Chip` / Blue Chip Juniper 5 gal 6-12" Yes
76 Juniperus sabina `Buffalo` / Buffalo Juniper 5 gal 6-12" Yes
27 Physocarpus opulifolius `Seward` / Summer Wine Ninebark 5 gal 5`-6` Yes
9 Picea pungens `Globosa` / Dwarf Globe Blue Spruce 5 gal 4`-5` Yes
46 Pinus mugo `Pumilio` / Mugo Pine 5 gal 5`-6` Yes
52 Potentilla fruticosa `Abbotswood` / Abbotswood Potentilla 5 gal 2`-3` Yes
46 Rhus aromatica `Gro-Low` / Gro-Low Fragrant Sumac 5 gal 2`-3` Yes
21 Ribes alpinum `Green Mound` / Green Mound Alpine Currant 5 gal 2`-3` Yes
68 Rosa x `Morden Sunrise` / Adelaide Hoodless Rose 5 gal 2`-3` Yes
95 Rosa x `Nearly Wild` / Nearly Wild Rose 5 gal 2`-3` Yes
170 Spiraea japonica `Goldflame` / Spirea 5 gal 2`-3` Yes
37 Spiraea x bumalda `Little Princess` / Little Princess Spirea 5 gal 3`-4` Yes
30 Symphoricarpos albus / Common White Snowberry 5 gal 4`-5` Yes
50 Syringa meyeri `Palibin` / Dwarf Korean Lilac 5 gal 4`-5` No
GRASSES QTY BOTANICAL / COMMON NAME SIZE MATURE SIZE DROUGHT TOLERANT
69 Calamagrostis x acutiflora `Karl Foerster` / Feather Reed Grass 1 gal
122 Helictotrichon sempervirens `Blue Oats` / Blue Oat Grass 1 gal
GROUND COVERS QTY BOTANICAL / COMMON NAME CONT
65,013 sf Poa pratensis / Kentucky Bluegrass sod
PLANT SCHEDULE PHASE 1, 2 & 3
DECIDUOUS TREES QTY BOTANICAL / COMMON NAME CONT CAL SIZE MATURE SIZE DROUGHT TOLERANT
40 Populus tremuloides / Quaking Aspen B & B 1.5"Cal 35`-45` No
20 Salix alba vitellina / Golden Willow 15 gal Clump 30`-40` No
SHRUBS QTY BOTANICAL / COMMON NAME SIZE MATURE SIZE DROUGHT TOLERANT
30 Amelanchier alnifolia / Serviceberry 5 gal 6`-10` Yes
94 Cornus sericea `Isanti` / Isanti Redosier Dogwood 5 gal 5`-6` No
56 Symphoricarpos albus / Common White Snowberry 5 gal 4`-5` Yes
PLANT SCHEDULE WATERCOURSE & WETLAND
NOTE: ALL WATERCOURSE PLANTS ARE TO BE FENCED AND IRRIGATED. SMALLER CONTAINER SIZES MAY BE USED
FOR WATERCOURSE TREES AND SHRUBS. MINIMUM 1" CAL. OR 7 GAL. CONTAINER FOR TREES AND 2 GAL.
CONTAINER FOR SHRUBS.
N
Project For:
West Side Flats
Fallon St.,
Bozeman, MT
Enlarged
Landscape
Plan
SCALE: 1"=20'-0" L103
6/10/20 City Submittal
Date Issue
3084 Thorpe Road
Belgrade, Montana 59714
Ph 406.924.8038
chad@redbarnmontana.com
11/02/20 Revisions
43
8.
ALL LANDSCAPE BEDS TO RECEIVE DRIP IRRIGATION. HIGH EFFICIENCY
IRRIGATION DRIP ZONES SHALL HAVE 5 GALLON/HR EMITTERS TO TREES, 2
GALLON/HR EMITTERS TO ALL SHRUBS, AND 1 GALLON/HR EMITTERS TO ALL
PERENNIALS AND GRASSES. ANY TREES OR SHRUBS OUTSIDE BEDS OR LAWN
AREAS (IN NATIVE GRASS) ARE TO RECEIVE DRIP IRRIGATION.
9.
ON THE NORTH SIDES OF STRUCTURES OR HEAVY CLAY SOILS, CARE SHALL
BE TAKEN TO MINIMIZE OVER WATERING DEPENDING ON SOIL CONDITIONS
AND THE SIZE OF EMITTER MAY BE REDUCED
IRRIGATION CALCULATIONS-PHASES 1, 2 & 3
~THIS ESTIMATE ASSUMES THE SPRINKLER CONTROLLER IS PROGRAMMED
CORRECTLY AND ASSUMES A 3 TIME A WEEK IRRIGATION SCHEDULE
~TOTAL ESTIMATED 156,250 GALLONS OF WATER PER MONTH (65,104 SF. TURF
AREA) USED FOR ALL SPRAY/LAWN ZONES.
~TOTAL ESTIMATED 11,892 GALLONS OF WATER PER MONTH USED IN THE DRIP
ZONES FOR THE TREES/SHRUBS PERENNIALS AND GRASSES.
TOTAL ESTIMATED WATER USAGE PER MONTH FOR LANDSCAPE:168,142 GALLONS
PLANTING NOTES
1.
ALL LANDSCAPED AREAS SHALL HAVE PERMANENT UNDERGROUND
IRRIGATION INSTALLED TO ENSURE A HEALTHY LANDSCAPE. SEE IRRIGATION
NOTES.
2.
ALL AREAS DISTURBED BY CONSTRUCTION TO BE SEEDED OR PLANTED AND
MAINTAINED.
3.
ALL EDGING SHALL BE METAL (PRO EDGE-STEEL/ALUMINUM)
4.
ALL SHRUB BEDS SHALL BE LINED WITH PROFESSIONAL GRADE TYPAR WEED
FABRIC, AND COVERED WITH 3-4" OF 1
1
2
" WASHED ROCK MATERIAL
5.
ALL TREES SHALL BE STAKED WITH WOOD STAKES (MIN OF 2 PER TREE) ANY
TREE OR SHRUB PLANTED THAT IS NOT IN A SHRUB BED SHALL HAVE A 3' DIA.
4" DEPTH ORGANIC MULCH RING AT THE BASE.
6.
CONTRACTOR TO VERIFY LOCATION OF ALL UTILITIES PRIOR TO INSTALLATION,
EXCAVATION, OR PLANTING.
7.
NO TREE SHALL BE PLANTED WITHIN 10' OF ANY FIRE HYDRANT, SEWER OR
WATER LINE.
8.
ALL STREET TREES SHALL BE APPROVED BY CITY FORESTER AND PLANTED
SLIGHTLY HIGHER THAN GRADE AND WITH THE TREE COLLAR EXPOSED. THE HOLE
EXCAVATED SHALL BE TWICE THE SIZE OF THE POT OR ROOTBALL OF THE TREE.
9.
ALL PLANTS SHALL BE GUARANTEED FOR ONE YEAR AFTER PROJECT
COMPLETION.
10.
ALL LAWN AREAS SHALL BE LOCALLY GROWN SOD
11.
ALL OTHER DISTURBED AREAS ON SITE SHALL BE RE-GRADED ROCK HOUNDED
AND SEEDED TO MATCH DISTURBED AREA EXISTING LANDSCAPE
12.
SEEDED GRASS AREAS ARE TO BE FINANCIALLY GUARANTEED FOR 2 YEARS BY
OWNER OR CONTRACTOR. TEMPORARY IRRIGATION FOR ESTABLISHMENT IS
RECOMMENDED.
13.
NO PLANT SUBSTITUTIONS WITHOUT WRITTEN APPROVAL FROM THE OWNER AND
LANDSCAPE DESIGNER
11.
CONTRACTOR TO VERIFY ALL PLANT QUANTITIES. IF THERE IS A DISCREPANCY
BETWEEN PLANT TABLE AND PLAN, THE PLAN SHALL DICTATE QUANTITY.
12.
ALL GROUND MOUNTED MECHANICAL NOT SHOWN ON PLAN SHALL BE HARD
SCREENED WITH FENCE OR SIDING MATERIAL
IRRIGATION GENERAL NOTES
OWNER
J&D FAMILY LIMITED PARTNERSHIP
270 AUTOMOTIVE AVE.
BOZEMAN, MT 59715
LEGAL DESCRIPTION
LOT R-2, J&D FAMILY MAJOR SUBDIVISION PHASE 2, SE
1
4, SEC. 9, T.2S., R5 E
CITY OF BOZEMAN, GALLATIN COUNTY, STATE OF MONTANA
N
Project For:
West Side Flats
Fallon St.,
Bozeman, MT
Master
Landscape
Plan
Ph. 1, 2 & 3
SCALE: 1"=50'-0" L101
6/10/20 City Submittal
Date Issue
3084 Thorpe Road
Belgrade, Montana 59714
Ph 406.924.8038
chad@redbarnmontana.com
FALLON STREET
BABCOCK STREET
AUTOMOTIVE AVENUE
PHASE 1
PHASE 2
PHASE 2
PHASE 3
BLDG #8
12 PLEX BLDG #7
12 PLEX
BLDG #5
12 PLEX
BLDG #1
12 PLEX
BLDG #4
12 PLEX BLDG #2
18 PLEX
BLDG #3
18 PLEX
BLDG #6
BLDG #9 18 PLEX
18 PLEX
MAY FLY ST.
BAXTER CREEK
BAXTER CREEK
BAXTER CREEK
PROPERTY LIINE
PROPERTY LIINE
PROPERTY LIINE
PROPERTY LIINE
DRAGONFLY ST.
PHASE 1
PHASE 2
PHASE 2
PHASE 3
11/02/20 Revisions
42
EQ
EF
DWG
EA
CMU
CLR
COL
GENERAL CONTRACTOR THK
SYMBOLS
LIVE LOAD
HOLLOW METAL
INCLUDE(ING)
HOLLOW CORE
GYPSUM BOARD
LAMINATE
INSULATE(ION)
HEATING/VENT./AIR COND.
JOINT
INTERIOR
-
-
-
-
-
-
-HOUR
-
-
-
-
-
WO WITHOUT
W
W/
WC
WWF
WP
VCT
VB
UBC
TYP
T&G
WITH
-
-
-
-
-
-
TYPICAL
-
-
-
-
-
-
EXPOSED
FIREPROOF
FINISH(ED)
FIRE CODE
EXTERIOR
FINISH FLOOR
FURNISHED BY OTHERS
GAGE, GAUGE
FOOTING
FLOOR
-
-
-
-
-
EXISTING
-
-
-
-
-
-
CONCRETE
CONSTRUCTION
EACH FACE
ELECTRIC(AL)
CONCRETE MASONRY UNIT
DETAIL
DRAWING
EQUAL
EACH
-
-
-
-
-
-
COLUMN
CLEAR
-
-
-
-
-
SPEC
SC
SQ
SYS
STR
SPK
SIM
RO
RE
RFG
REF
SPEAKER
SYSTEM
SQUARE
-
-
-
-
-
ROOFING
SIMILAR
-
-
-
-
-
-
PLWD
PVMT
PL
RAD
PSI
PSF
PVC
PBD
PLF
PNL
OH
PLATE
RADIUS
PLYWOOD
-
-
-
-
-
-
PANEL
-
-
-
-
-
NOT IN CONTRACT
NOISE REDUCTION
MILLIMETER
MANUFACTURER
MECHANICAL
ON CENTER
NOT TO SCALE
APPD
ARCH
BSMT
BRG
BLKG
BLDG
A/C
CLG
BD
ALT
AL
AC
ACT
ADJ
AFF
ABBREVIATIONS
AIR CONDITIONING
ARCHITECT(URAL)
APPROVED
BLOCKING
BASEMENT
ALTERNATIVE
BEARING
CEILING
BUILDING
BOARD
-
-
-
-
-
-
ALUMINUM
-
-
-
-
-
-
ADJACENT
ACOUSTICAL
ABOVE FINISHED FLOOR
-ACOUSTICAL CEILING TILE
-
-
-
MTL METAL
OPG
OC
NIC
NO
NTS
NAT
NOM
NR
MM
MIN
NUMBER
-OPENING
-
-
-
-
-
NATURAL
MINUMUM
NOMINAL
-
-
-
-
-
-
MECH
MAS
MAX
MFR
MASONRY
-MAXIMUM
-
-
-
VICINITY MAP
BOZEMAN, MONTANA 59715
719 WEST MENDENHALL PHONE 406-556-8080
JDSARCHITECTSBOZEMAN.COM
JESSE@JDSARCHITECTSBOZEMAN.COM
Buttonwood Ave.
Cypress Ave.
rth
Wilda Ln.
Fowler Rd.
W. Kagy Blvd.
Ice Pond Rd.
Spring Creek Dr.
Creek Dr.
Landoe
Ave.
Langohr
S. 19th
Medicine Wy.
Good
Trails End Ct.
S. 3rd Ave.
Goldenstein Rd.
Graf St.
Henderson
Staudaher St.
Concord Dr.
Fieldstone Dr.
Secor
Erwin
Arnold St.
St.
Healy
Graf St.
Heritage Dr.
Silverwood Dr.
Sundance Dr.
Wagonwheel
Rd.
Colter
Arnold St.
St.
Henderson
Spring Meadows
Billion Pl.
S. 19th
Remington Way
Lincoln Rd.
Way
Alder Ct.
Willow
Blvd. S.
23rd
Professional
Ponderosa Rd.
Dr.
W. College St.
Martin
S. 15th
Resea
W. Garfield St.
rch
Dr.
Koch St.
Chamber-
22nd
Tech.
Dr.
20th
19th
Julia
18th
17th
15th
Grant
lain Dr.
16th
14th
S. Black Ave.
Tracy Ave.
Montana Ave.
Bozeman Ave.
Rouse Ave.
Cutting St.
Morrow St.
Spring
Greek
State Lincoln St.
University
Fryslie St.
Westridge
Dr.
Grant St.
W. Kagy Blvd.
S. 7th
Westridge Dr.
Highland Ct.
Circle
Dr.
S. Willson
S. 3rd
Tracy Ave.
Wy.
Ave.
Fairway Dr.
Spring
Mason St.
Accola
Dr.
man
Creek Dr.
Hoff
Dr.
Arthur St
Garfield St.
Hayes St.
Cleveland St.
Olive St.
Curtiss St.
Koch St.
Montana
S. 11th
13th
12th
11th
10th
9th
5th
Dickerson St.
Alderson St.
College St.
Harrison St.
8th
Story St.
8th
7th
6th
3rd
4th
Grand Ave.
Willson Ave.
S. Black Ave.
Dell Pl.
Tracy Ave.
Bozeman Ave.
Lindley Pl.
Candy Ln.
Highland Blvd.
Hitching Post Rd.
Hitching Post Rd.
Sourdough
Creek Rd.
Annette
Park Dr.
Trail
Gardner Park Dr.
Bradley
Sourdough
Ridge
Erik St.
Donegal Ave.
North Dr.
S. Pinecrest
N. Cedarview
S. Cedarview
Cherry Dr.
N. Pinecrest
Sourdough Rd.
Lomas Dr.
Kenyon Dr.
O'Connell
Knaab
Lomas Dr.
Chambers
Baxter Dr.
Dr.
Dr.
N. Spruce
S. Spruce
Holly Dr.
Ash Dr.
Cherry Dr.
Maple Dr.
Ellis St.
Bogert Pl.
Curtiss St.
Olive St.
Story St.
E. Olive
E. Curtiss
Golf Wy.
Meadow
ls
Ay
wo
Blvd.
Haggerty
Highland
Lane
Meagher Ave.
W. Babcock St.
Valley Dr.
Davis Ln.
Birch
Lamme St.
Church Ave.
Juniper
Commercial Dr.
Bryant St.
Bond St.
Single Tree
W. Main St.
land Dr.
wood Ave.
N. 19th
Annie St.
Western
Dr.
N. 25th
Wood
W. Beall
N. 17th
Windsor
N. 22nd
N. 22nd
Brent
N. 19th
N. 21st
N. 20th
N. 18th
N. 17th
St.
Blackmore
Pl.
Stevens
St.
N. 16th
N. 15th
Terrace Ave.
Oak St.
Maplewood
Boothill Ct.
St.
Hemlock St.
Mendenhall St.
Aspen St.
Peach St.
Juniper St.
N. 10th
N. 9th
N. 11th
N. 8th
N. 7th
E. Babcock St.
N. 7th
N. 6th
N. 5th N. 5th
N. 4th
Tamarack St.
Villard St.
Short St.
Cottonwood St.
N. 3rd
N. Willson
N. Grand Ave.
Aspen St.
Beall St.
N. Tracy
N. Black
N. Montana
N. Bozeman
Perkins Pl.
N. Rouse
N. Rouse
St.
Meadow Wy.
N. 5th
9th
Birch St.
Wheat Dr.
Mandeville Ln.
Baxter Lane
Flora Ln.
Oak St.
Gilkerson
Lea Ave.
Dr.
Nickles Dr.
Griffin Dr.
St.
Industrial Dr.
N. Rouse
U.S. 10
Rawhide Ridge Ct.
Bannock Stage
Deadmans Gulch Ct.
Simmental Trail
Orville Way
Red Wing Dr.
Reeves Rd.
Manley Rd.
Bridger Dr.
Bogart Ln.
E. Main St.
Babcock St.
Fridley St.
Front St.
Davis St.
Brady
N. Wallace
E. Babcock
Meadow
Avocado St.
Cedar St.
Broadway
Orange
St.
Plum Ave.
N. Ida
Ave.
Pear St.
Ave
Gold
Oak St.
L St.
Hillside Ln.
Big Gulch Dr.
Bridger Center Dr.
McIllhattan Rd.
Story Mill Rd.
N. 14th
Huffine Lane
w. Main. St.
Fergusson Ave.
Fergusson Ave.
Flanders Mill Rd.
Baxter Lane
Baxter Lane
Fergusson Ave.
Gallatin Green Blvd.
Vaquero Pkwy
Calballo Ave.
Lasso Ave.
W. Babcock St. W. Babcock St.
Cottonwood Rd.
Durston Rd.
Resort Dr.
Auto Plaza Dr.
Stafford Ave.
Cascade St.
Alexander St.
Cliffden Dr.
Hanley Ave.
Cover St.
Monroe St.
Kimball Ave.
Ravalli St.
Hanley Ave.
Pa Isade Dr.
Stillwater
Creek dr.
Slough
Creek dr.
Cottonwood Rd.
Durston Rd.
Glenwood Dr.
Joni St.
Flanders Cr. Ave.
Annie St.
Sherwood Way
Twin Lakes Ave.
A Street
West Oak St.
FALLON STREET BOZEMAN, MONTANA
WEST SIDE FLATS MASTER SITE PLAN
N. 7th
PROJECT INFORMATION
SITE OVERVIEW
INDEX OF DRAWINGS
ENLARGED VICINITY/ZONING MAP
BUILDING INFORMATION
STREET ADDRESS
LEGAL DESCRIPTION PERMITS REQUIRED
CONSULTANTS
LOT R-2, J&D FAMILY MAJOR SUBDIVISION PHASE 2
SE 1/4, SEC. 9, T. 2 S., R 5 E OF P.M.M. CITY OF
BOZEMAN, GALLATIN COUNTY MONTANA
CIVIL ENGINEERING
GEOTECHNICAL ENG.
LANDSCAPE DESIGN
GENERAL CONTRACTOR
STRUCTURAL ENGINEERING
OWNER
J&D FAMILY LIMITED PARTNERSHIP
270 AUTOMOTIVE AVE.
BOZEMAN, MT 59715
PROJECT
LOCATION
PROJECT
LOCATION
FALLON STREET
BOZEMAN, MT 59718
OCCUPANCY GROUP: R-2
SPRINKLED: YES
#'S OF STORIES: 3
BUILDING HEIGHT: 41'-7 +/-
BUILDING PERMIT
Water Lilly
Fallon St.
PROJECT LOCATION
CHASE SKOGEN CONSTRUCTION
2246 BOOT HILL CT #1
BOZEMAN, MT 5978
(406)586-9126
C&H ENGINEERING
1091 STONERIDGE DR
BOZEMAN, MT 59718
(406)587-1115
C&H ENGINEERING
1091 STONERIDGE DR
BOZEMAN, MT 59718
(406)587-1115
C&H ENGINEERING
1091 STONERIDGE DR.
BOZEMAN, MT 59715
(406)587-1115
RED BARN MONTANA
3084 THORPE ROAD
BELGRADE, MT 59715
(406)924-8038
CONSTRUCTION
ROUTE
CONSTRUCTION
ROUTE
SITE INFORMATION
FIRE SPRINKLER DESIGN
FIRE SPRINKLER SHOP DRAWINGS WILL BE SUBMITTED TO THE
STATE OF MONTANA BUILDING DEPARTMENT AT A LATER DATE
PARKING CALCULATIONS
USE REQ'D PARKING
2 SPACE ( 2 BED UNITS)
REMARKS
132- 2 BEDROOM APARTMENTS 132 X2 BEDROOM UNITS=264
TOTAL PARKING 267 SPACE PROVIDED
ADA PARKING 9 SPACE PROVIDED
OPEN SPACE/ PLAY AREA CALCULATIONS
USE REQ'D OPEN SPACE
150 SQ. FT. PER UNIT
REMARKS
APARTMENTS 150 X 132 UNITS = 19,800 SQ. FT.
TOTAL OPEN SPACE PROVIDED 30,336 SQ. FT. PROVIDED
BICYCLE PARKING CALCULATIONS
USE REQ'D PARKING
10% OF AUTOMOBILE PARKING STALLS
REMARKS
264 AUTOMOBILE PARKING STALLS 10% OF 264 = 26.4
TOTAL PARKING PROVIDED 56 SPACES
BIKE PARKING REQUIRED 26 SPACES
PHASE 1
COST PER L.F.
ESTIMATE FOR IMPROVEMENTS IN-LIEU OF PARKLAND
546 6.30
(138) 2 BEDROOM RESIDENTIAL UNIT
DWELLING INFORMATION
7 SPACES REQUIRED
264 SPACES REQUIRED
NET RESIDENTAL DENSITY
(D) RESIDENTIAL DENSITY= (DU) TOTAL NUMBER OF DWELLING UNITS
A- (c + i + s + a + d)
D = 8.78 - 2.04 = 6.74 ACRES
D = 132 / 6.74 ACRES = 19 UNITS PER ACRE
F.A.R. = (BLDG.AREA) / (LOT AREA) TOTAL BLDG. FLOOR
AREA = 154,922 S.F. TOTAL LOT AREA =382,455 S.F.
F.A.R. = 154,922 / 382,455 .405 =
F.A.R.
CIVIL
C1.0 - CIVIL COVER SHEET
C1.1 - PHASING PLAN
C2.0 - SITE PLAN SOUTH
C2.1 - SITE PLAN CENTER
C2.2 - SITE PLAN NORTH
C3.0 - UTILITY PLAN SOUTH
C3.1 - UTILITY PLAN CENTER
C3.2 - UTILITY PLAN NORTH
C4.0 - GRADING & DRAINAGE PLAN SOUTH
C4.1 - GRADING & DRAINAGE PLAN CENTER
C4.2. - GRADING & DRAINAGE PLAN NORTH
C5.0 - CONSTRUCTION DETAILS
C5.1 - CONSTRUCTION DETAILS
C5.2 - CONSTRUCTION DETAILS
LANDSCAPE
L101 - MASTER LANDSCAPE PLAN
L102 - ENLARGED LANDSCAPE PLAN
L103 - ENLARGED LANDSCAPE PLAN
L104 - ENLARGED LANDSCAPE PLAN
L105 - ENLARGED LANDSCAPE PLAN
L201 - LANDSCAPE DETAILS
LIGHTING PLAN
AL - PHOTOMETRIC LIGHTING PLAN
AL.1 - LUMARK XTOR MAXX XTOR6B SPECS
ARCHITECTURAL
12-PLEX ARCHITECTURAL PLANS
A2 - FIRST & SECOND FLOOR PLAN 12-PLEX
A2.1 - THIRD FLOOR PLAN 12-PLEX
A3 - EXTERIOR ELEVATIONS 12-PLEX
A3.1 - EXTERIOR ELEVATIONS 12-PLEX
A3.2 - ROOF PLAN 12-PLEX
A3.3 - OVERHEAD VIEW
A3.4 - PERSPECTIVE VIEWS
18-PLEX ARCHITECTURAL PLANS
A2 - FIRST & SECOND FLOOR PLAN 18-PLEX
A2.1 - THIRD FLOOR PLAN 18-PLEX
A3 - EXTERIOR ELEVATIONS 18-PLEX
A3.1 - EXTERIOR ELEVATIONS 18-PLEX
A3.2 - ROOF PLAN 18-PLEX
A3.3 - OVERHEAD VIEW
A3.4 - PERSPECTIVE VIEWS
DRAGON FLY
STREET
1332.23' 002°08'35"
N2°08'35"E
ZONE 2 WETLAND
50'-0" SETBACK
ZONE 2 WETLAND
50'-0" SETBACK
45.00 180°44'25"
S0°44'25"W
89.27 145°23'12"
S34°36'48"E
63.88 175°22'07"
S4°37'53"E
238.06 090°20'37"
S89°39'23"E
301.30 181°50'19"
S01°50'19"W
345.63 270°20'37"
N89°39'23"W
385.54 188°15'55"
S8°15'55"W
174.58 172°59'40"
S07°00'20"E
160.79 207°26'08"
S27°26'08"W
210.08 90°20'16"
S89°39'44"E
432.89 90°20'16"
S89°39'44"E
222.81 90°20'16"
S89°39'44"E
TOP OF BANK
APPROX. WATER
COURSE CENTER
LINE
REINFORCED
CONCRETE PIPE (2X)
PROPERTY BOUNDARY
LOT 2-A
PROPERTY : 7
WEST BABCOCK STREET
FALLON STREET
AUTOMOTIVE AVENUE
14
22 28
7
20
20
19
TOP OF BANK
BAXTER CREEK
191.57 128°15'10"
[S51°44'50"E]
48.17 154°38'32"
[S25°21'28"E]
12 PLEX
18 PLEX
TOP OF BANK
BAXTER CREEK
BAXTER CREEK
BAXTER CREEK
phase 1
phase 2
(E) WETLANDS
NEW TRAIL
SYSTEM
(E) TRAIL
SYSTEM
PRIVATE
PATIO, TYP.
138.70 217°01'47"
[S37°01'47"W]
136.28 193°23'13"
[S13°23'13"W]
129.85 162°08'15"
[S17°51'45"E]
221.04 204°21'20"
[S24°21'20"W]
135.05 171°14'43"
[S8°45'17"E]
EXISTING 8" PVC SEWER MAIN
EXISTING 8" DIA WATER MAIN
18 PLEX
18 PLEX
12 PLEX
ZONE 1 WETLAND
30'-0" SETBACK
BENCH
4,090 S.F. SHARED
OPEN SPACE PHASE 3
phase 2
phase 3
7,517 S.F. SHARED
OPEN SPACE PHASE 2
18 PLEX
12 PLEX
12 PLEX
DETENTION
AREA
DETENTION
AREA
DETENTION
AREA
SNOW STORAGE
SNOW STORAGE
SNOW STORAGE
SNOW STORAGE
14
14
12 PLEX
12 PLEX
18
23
C
PHASE 3 #87 PARKING PHASE 2 #94 PARKING
PROPOSED 19,423 S.F.
PARK AREA
SNOW STORAGE
C
C
C
C
C
C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C C
C
C
C
C C C C
C
C C C C
C
C C C C
C
C C C
(8) BICYCLE PARKING
EXISTING SIDEWALK
BENCH
EXISTING TRAIL
NEW TRAIL
SYSTEM
ZONING: R-0
SITE RATIOS
LAND USE RATIOS
182,686
AREA (ACRES)
HARDSCAPE (INCLUDES BUILDINGS) 4.1939
SIDEWALK, CURB, ASPHALT 3.0631
BUILDINGS 49,258 1.1308
133,428
AREA (FT2
) % OF LOT
47.8%
34.9%
12.9%
EXISTING R.O.W. (FALLON&BABCOCK) 23,932 0.5494 6.3%
LANDSCAPE 175,837 4.0367 46.0%
TOTAL 382,455 8.780 100.0%
ACKNOWLEGEMENT OF ACCESS REQUIREMENTS UNDER FEDERAL AND STATE DISCRIMINATION LAWS (ARM 24.301.902)
THIS ACKNOWLEDGES THAT THE FOLLOWING PROJECT WAS DESIGNED WITH FULL KNOWLEDGE THAT THE CITY OF
BOZEMAN BUILDING DIVISION WILL NOT REVIEW FOR COMPLIANCE WITH, NOR IS RESPONSIBLE FOR ENFORCEMENT OF THE
FEDERAL AMERICANS WITH DISABILITIES ACT OF 1990, THE REHABILITATION ACT OF 1973, THE FAIR HOUSING AMENDMENTS
ACT OF 1988, TITLE 49, CHAPTER 2, COMMONLY KNOWN AS THE MONTANA HUMAN RIGHTS ACT, OR OTHER SIMILIAR
FEDERAL, STATE OR LOCAL LAWS THAT MANDATE ACCESSIBILITY TO COMMERCIAL CONSTRUCTION OR MULTI-FAMILY
HOUSING.
452
TOTAL
PHASE 2
PHASE 3 6.30
6.30
1,598
600
LENGTH OF 6'
CLASS II TRAIL
PERSPECTIVE VIEW LOOKING NORTH-EAST
TOTAL
$3,439.80
$3,780.00
$2,847.60
$10,067.40
PARKLAND DEDICATION REQUIREMENTS
DU
132 8.78 .55
AREA
1.49
PRO PARK 47,388 1.088
PARK W/IN ZONE 1
EX. ROW
(FALLON & BABCOCK
PRO. TRAIL
EASEMENTS
NET AREA
(ACRES)
PRO. UNIT
DENSITY
AC/DU REQ. DED.
(ACRES)
REQ. DED.
(SQ. FT.)
CIL
VALUE
CIL
AMOUNT
6.74 19.600 0.03 2.43 105,850.8 $1.60 $169,361.28
PRO. UNIT
DED.
81
SQ. FT. ACRES % OF TOTAL
PARK W/IN ZONE 2
723
2,833
1.53%
5.98%
TOTAL % 7.50%
1 2
40
NCOA
Alfred M. Stiff Professional Building
20 East Olive Street 59715 (FED EX and UPS Only)
PO Box 1230
Bozeman, MT 59771
phone 406.582.2260
fax 406.582.2263
planning@bozeman.net
www.bozeman.net
Development Review Application A1 Page 3 of 3 Revision Date: 5.16.18
REQUIRED FORMS: Varies by project type, PLS
Jim McLeod
Philip Saccoccia
31
NCOA
Alfred M. Stiff Professional Building
20 East Olive Street 59715 (FED EX and UPS Only)
PO Box 1230
Bozeman, MT 59771
phone 406.582.2260
fax 406.582.2263
planning@bozeman.net
www.bozeman.net
Development Review Application A1 Page 3 of 3 Revision Date: 5.16.18
REQUIRED FORMS: Varies by project type, PLS
Jim McLeod
Philip Saccoccia
28
cases do not qualify as transparent
window areas.
Building 1/A (see A8-01 for calcs):
Primary Façade (North): 69%
Secondary Façade 1 (East): 41%
Secondary Façade 2 (West): 47%
Secondary Façade (South) 3: 38%
Building 4/D (see A8-06 for calcs):
Primary Façade (North): 59%:
Secondary Façade 1 (South): 28%
Secondary Façade 2 (East): 42%
Secondary Façade 3 (West): 41%
Weather
protection
Weather protection with 8-15' vertical
clearance at least 5' in average depth
along at least 60% of
façade. Retractable awnings may be
used to meet these requirements.
Weather projection is provided along the north
sides of buildings A1 & D4, see building
elevations provided in submittal.
Parking location New surface and structured parking
areas (ground floor) must be placed to
the side or rear of structures and are
limited to 60' of street frontage. Provide
a 6' minimum buffer of landscaping
between the street and off-street parking
areas meeting the performance
standards of division 38.550.
All parking is proposed to be located on the
side or rear of Buildings A1 & D4.
22
E
E
E
E
E
E
//
//
/
/
//
//
//
//
//
//
//
//
/
/
/
//
//
P
SD
SD SD
SD SD SD
SD
SD
SD
SD SD
SD
SD
SD
SD
SD
W
W
W
W
W
W
SD
SD
W
SD
P
P
SD
SD
SD
SD
SD
SD SD SD
P
WV
WV
D
Y
H
WV
WV
P
P
D
Y
H
D
Y
H
P P
D
Y
H
WV
WV
WV
WV
WV
WV
WV
WV
WV
WV
WV
P
P
W
W W
W W
W
W
W W
W
W
W W
W
W
SS
SS
SS SS
SS
SS SS SS SS SS
SS
SS SS SS SS
SS
SS
SS
SS
SS SS
SS
SS
SS
SS
SS
NG
NG NG NG
NG
NG
BP
BP
BP
BP
BP
BP
BP
BF
BF
BF
BF
BT
BT
BT
BCTV
BCTV
BCTV
BCTV
BCTV
BCTV
BCTV BCTV BCTV
BCTV
BCTV
BCTV
BCTV
BCTV
BCTV
BCTV BCTV
BCTV BCTV
BCTV
BCTV
BCTV
BCTV
BCTV
BCTV
BCTV
BCTV
SD SD
BCTV
BCTV BCTV
BCTV BCTV BCTV BCTV
BP
BP
BP
BP
BP
BP
BP
BP
BP
BP
BP
BCTV
BT
BT
BT BT BT
BT
BT BT BT
BT
BT BT BT
BT BT
BP
BP BP
BP
BP
BP
BP
BP
BP
BP BP BP
BP
BP
BT
BT BT
BT BT BT BT BT
GAS
GAS
GAS
GAS
GAS GAS
GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS
BP
BP
BP
BP BP
BP
BP BP BP
BP
BP BP BP
BP
BP
BCTV
BCTV
BCTV BCTV BCTV
BCTV
BCTV BCTV BCTV
BCTV
BCTV
BCTV BCTV BCTV
BT
BT BT
BT
BT BCTV BCTV
BT
BT
BP
BP BP
BP
BP
BP
BP
GAS
GAS
GAS GAS
GAS
GAS GAS
GAS GAS
GAS GAS GAS
GAS
8W 8W 8W 8W 8W 8W 8W 8W
8W 8W 8W
H
Y
D
WS
H
Y
D
H
Y
D
H
Y
D
H
Y
D
H
Y
D
8W
8W
8W
8W 8W 8W
8W
8W
8W
8W
8W
8W
8W 8W 8W 8W
8W
8W
8W
8W
8W 8W 8W
8W
8W 8W 8W
8W 8W 8W 8W 8W 8W 8W
8W 8W
8W
8W
8W
8W 8W 8W
6FIRE
6WS
8S
8S 8S
8S
8S
8S 8S 8S
8S
8S
8S
8S
8S 8S
8S 8S
8S
TSCHACHE LANE
BUILDING 1/A
BUILDING 2/B
BUILDING 3/C
H
H
H
H
H
BUILDING 4/D
H
3
LEGEND
T
c COMPACT PARKING SPACE
5 PARKING COUNT
M MAINTENANCE BUILDING
PARKING FOR BUILDING 1/A - PHASE 2
PARKING LEGEND
PARKING FOR BUILDING 2/B - PHASE 2
PARKING FOR BUILDING 3/C - PHASE 1
PARKING FOR BUILDING 4/D - PHASE 1
H FIRE HYDRANT - PHASE 1
MASTER SITE PLAN DESCRIPTION
1. PROPOSED ENTITLEMENT PERIOD: 5 YEARS
2. DETAILED PHASING INFORMATION : REFER TO NARRATIVE.
a. PROPOSED PHASING LINES: SEE MASTER SITE PLAN THIS SHEET.
b. PROPOSED LIMITS OF CONSTRUCTION FOR EACH PHASE: SEE MASTER SITE PLAN THIS SHEET.
c. PROPOSED PLAN FOR STAGING AND PHASING OF CONSTRUCTION INCLUDING STORAGE OF TOPSOIL,
SPOILS AND CONSTRUCTIONS MATERIALS AND EQUIPMENT: SEE MASTER SITE PLAN THIS SHEET;
CONSTRUCTION STORAGE WILL BE GENERALLY LOCATED ON THE EAST SIDE OF THE SITE, FOR BOTH
PHASES I & II. CONSTRUCTION DEBRIS WILL BE STORED IN A/MULTIPLE LARGE TRASH CONTAINERS
ON THE WEST SIDE OF THE SITE.
d. ANY INFRASTRUCTURE OR SITE PLAN ELEMENTS PROPOSED FOR FINANCIAL GUARANTEE: NONE.
e. PHASING CONTINGENCIES: ONLY TWO PHASES DO NOT ANTICIPATE VARIATION IN PROPOSED
PHASING.
3. DESIGN GUIDELINES TO DIRECT DESIGN OF DEVELOPMENT OVER THE ENTITLEMENT PERIOD: N/A
BUILDINGS ARE FULLY DESIGNED AND WILL BE CONSISTENT WITH DEVELOPMENT REVIEW SUBMITTAL.
4. FOLLOWING THE APPROVAL OF A MASTER SITE PLAN THE APPLICANT SHALL SUBMIT TO THE
DEPARTMENT, SEQUENTIAL INDIVIDUAL SITE PLAN FOR SPECIFIC AREAS WITHIN THE MASTER SITE PLAN.
EACH SUBSEQUENT APPLICATION FOR A SITE PLAN SHALL BE CONSISTENT WITH THE APPROVED MASTER
SITE PLAN AND SUBJECT TO THE REVIEW CRITERIA OF SECTION 38.19.100.A BMC.
O
O
O
PHASE 1 BOUNDARY & CONSTRUCTION LIMITS
PHASE 1 INCLUDES ALL SANITARY SEWER MAINS
PHASE 1 INCLUDES ALL SANITARY WATER MAINS
PHASE 2 BOUNDARY & CONSTRUCTION LIMITS
CONSTRUCTION STAGING & STORAGE PHASE I & II
MIXED-USE BUILDING
PEDESTRIAN CORRIDOR
SNOW STORAGE AREAS
TRASH ENCLOSURE
PROPERTY LINE
BUILDING SETBACK
PARKING SETBACK
SITE INFORMATION
CODE REQUIREMENT PROVIDED/REQUESTED
ZONING B-2 COMMUNITY BUSINESS DISTRICT B-2 WITH CONDITIONAL USE PERMIT FOR
RESIDENTIAL ON FIRST FLOOR
COMMUNITY PLAN REGIONAL COMMERCIAL & SERVICES --
LOT AREA ±11.85 ACRES / ±516,186 SQ. FT.
RESIDENTIAL UNITS 305
EFFICIENCY/STUDIO UNITS 60
ONE BEDROOM 139
TWO BEDROOM 106
DENSITY 25.7 DU/AC
COMMERCIAL SPACE ±18,043 SQ. FT.
SETBACKS - BUILDING
FRONTYARD
BASED ON BLOCK FRONTAGE - STOREFRONT -
BUILDING REQUIRED AT FRONT PROPERTY
LINE/BACK EDGE OF SIDEWALK. ADDITIONAL
SETBACKS ARE ALLOWED FOR WIDENED SIDEWALK
OR PEDESTRIAN-ORIENTED SPACE (38.520.060.D).
BUILDING LOCATED APP 20 FEET FROM
PROPERTY LINE DUE TO EXISTING
STORM DRAIN EASEMENT - WIDENED
SIDEWALK / PEDESTRIAN ORIENTED
SPACE PROVIDED.
SIDEYARD 5-FEET (EXCEPT ZERO LOT LINES) 5-FEET PROVIDED, SEE PLAN
REARYARD 10-FEET 10-FEET PROVIDED, SEE PLAN
SETBACK - PARKING & LOADING
FRONTYARD
FRONT SETBACK PROVISIONS ARE SET FORTH IN
THE BLOCK FRONTAGE STANDARDS IN DIVISION
38.510 AND IN 38.350.070.
25-FEET PROVIDED, INCLUDING
LANDSCAPE SCREENING, SEE PLAN
SIDEYARD 8-FEET 8-FEET PROVIDED, SEE PLAN
REARYARD 10-FEET 10-FEET PROVIDED, SEE PLAN
SETBACK - PUBLIC ACCESS EASEMENT
PUBLIC ACCESS EASEMENT
SETBACK - SPECIAL RESIDENTIAL
1. SEE MASTER SITE PLAN FOR PHASING BOUNDARIES
2. SEWER MAIN TO BE CONSTRUCTED IN PHASE 1
3. WATER MAIN TO BE CONSTRUCTED IN PHASE 1
4. STORMWATER TO BE CONSTRUCTED IN TWO SEPARATE PHASES SEE MASTER SITE PLAN FOR DETAILS. PHASE 1 WILL
DISCHARGE TO THE EXISTING STORMWATER DITCH UNTIL PHASE 2 IS CONSTRUCTED. STORMWATER POND TO BE
EXPANDED IN PHASE 1.
5. MIDBLOCK CROSSING BETWEEN BUILDING 2 & 3 TO BE CONSTRUCTED IN PHASE 2.
PHASING NOTES:
O
O
O O
O
O
O
O
O
O
O
O
O
O
O
O
O
O O
O
O O
REVIEW
SUBMITTAL
DEVELOPMENT
APARTMENT UNITS IN BOZEMAN, MONTANA
FARRAN REALTY PARTNERS
BOZEMAN EAST MIXED-USE
4202 BELTWAY DRIVE ADDISON, TX 75001
214.520.8878 hedk.com
Engineering
1800 RIVER DR. NO. • GREAT FALLS, MONTANA 59401
406.761.3010 • tdhengineering.com
15
CONTACT: DAN HOGAN
ENGINEER (M/P/E)
MUSGROVE ENGINEERING
234 S WHISPERWOOD WAY
BOISE, ID 83709
PHONE: 208.384.0585
CONTACT: RICK GOERES
ENGINEER (CIVIL)
MORRISON MAIERLE
2880 TECHNOLOGY BOULEVARD W
BOZEMAN, MT 59718
PHONE: 406.587.0721
CONTACT: MATTHEW E. EKSTROM
LANDSCAPE ARCHITECT
TD&H ENGINEERING
1800 RIVER DR N
GREAT FALLS, MT 59401
PHONE: 406.761.3010
CONTACT: JANA COOPER
BOZEMAN EAST
MIXED-USE
& CONDITIONAL USE
BOZEMAN, MT
SITE INFORMATION
CODE REQUIREMENT PROVIDED/REQUESTED
ZONING B-2 COMMUNITY BUSINESS DISTRICT B-2 WITH CONDITIONAL USE PERMIT FOR
RESIDENTIAL ON FIRST FLOOR
COMMUNITY PLAN REGIONAL COMMERCIAL & SERVICES --
LOT AREA ±11.85 ACRES / ±516,186 SQ. FT.
RESIDENTIAL UNITS 304
EFFICIENCY/STUDIO UNITS 60
ONE BEDROOM 138
TWO BEDROOM 106
DENSITY 25.7 DU/AC
COMMERCIAL SPACE ±18,043 SQ. FT.
SETBACKS - BUILDING
FRONT SETBACK
BASED ON BLOCK FRONTAGE - STOREFRONT -
BUILDING REQUIRED AT FRONT PROPERTY
LINE/BACK EDGE OF SIDEWALK. ADDITIONAL
SETBACKS ARE ALLOWED FOR WIDENED SIDEWALK
OR PEDESTRIAN-ORIENTED SPACE (38.520.060.D).
BUILDING LOCATED APP 20 FEET FROM
PROPERTY LINE DUE TO EXISTING STORM
DRAIN EASEMENT - WIDENED SIDEWALK /
PEDESTRIAN ORIENTED SPACE PROVIDED.
SIDE SETBACK 5-FEET (EXCEPT ZERO LOT LINES) 5-FEET PROVIDED, SEE PLAN
REAR SETBACK 10-FEET 10-FEET PROVIDED, SEE PLAN
SETBACK - PARKING & LOADING
FRONT SETBACK
FRONT SETBACK PROVISIONS ARE SET FORTH IN
THE BLOCK FRONTAGE STANDARDS IN DIVISION
38.510 AND IN 38.350.070.
25-FEET PROVIDED, INCLUDING LANDSCAPE
SCREENING, SEE PLAN
SIDE SETBACK 8-FEET 8-FEET PROVIDED, SEE PLAN
REAR SETBACK 10-FEET 10-FEET PROVIDED, SEE PLAN
SETBACK - PUBLIC ACCESS EASEMENT
PUBLIC ACCESS EASEMENT 5-FEET EACH SIDE 5-FEET EACH SIDE
SETBACK - SPECIAL RESIDENTIAL
SPECIAL RESIDENTIAL BLOCK
FRONTAGE
3-FEET OF LANDSCAPING BETWEEN SIDEWALK AND
BUILDING - BASED ON DIRECTOR DECISION IN
COMMENTS PROVIDED
3-FEET OF LANDSCAPING
RESIDENTIAL OPEN SPACE
STUDIO/ONE BEDROOM (198 UNITS) 100 SQ. FT./DU = 19,800 SQ. FT. --
TWO BEDROOM (106 UNITS) 150 SQ. FT./DU = 15,900 SQ. FT. --
TOTAL REQUIRED 35,700 SQ. FT.
20,504 SQ. FT. PROVIDED IN PRIVATE
PATIOS; ±21,010 SQ. FT. AT POOL
COURTYARD AREA AND OTHER AREAS
NOTED - TOTAL: 41,514 SQ. FT.
COMMERCIAL OPEN SPACE
BUILDING 1/A: 2% OF COMMERCIAL
DEVELOPMENT ENVELOP 56,958 SQ FT OF DEV AREA X 2% = 1,139 SQ. FT 1,982 SQ FT PROVIDED
BUILDING 1/A COMMERCIAL OPEN
SPACE SEATING 2 LN FT PER 60 SQ FT 1,139 SQ FT / 60 SQ FT x 2 = 38 LN FT REQUIRED
42 LN FT PROVIDED
BUILDING 4/D: 2% OF COMMERCIAL
DEVELOPMENT ENVELOP 38,177 SQ FT OF DEV AREA X 2% = 764 SQ. FT 1,205 SQ FT PROVIDED
BUILDING 4/D COMMERCIAL OPEN
SPACE SEATING 2 LN FT PER 60 SQ FT 764 SQ FT / 60 SQ FT x 2 = 26 LN FT REQUIRED 30 LN FT PROVIDED
SITE CALCULATIONS
GROSS SQ FT BUILDING 1/A 41,022 SQ. FT. --
GROSS SQ FT BUILDING 2/B 79,059 SQ. FT. --
GROSS SQ FT BUILDING 3/C 216,767 SQ. FT. --
GROSS SQ FT BUILDING 4/D 21,934 SQ. FT. --
DRIVEWAY CIRCULATION & PARKING
AREAS 186,518 SQ. FT.
--
LANDSCAPE AREAS 68,134 SQ. FT. --
26,357 SQ. FT. --
34,829 SQ. FT. --
PARKING INFORMATION
CODE REQUIREMENT PROVIDED/REQUESTED
PARKING CALCULATIONS
BUILDING 1/A (EASTERLY MIXED-USE BUILDING; 3-STORY)
EFFICIENCY/STUDIO UNITS - 39 UNITS 1.25/DU = 49 SPACES
49 SPACES PROVIDED, INCLUDING 15 ON-STREET (38.540.050
(1) (a) (1)), SEE PARKING PLAN
COMMERCIAL - ±12,039 SQ. FT. (RENTABLE**)
1/250 SF OF FLOOR AREA = 49 SPACES - PERMITTED
50% REDUCTION FOR MIXED-USE BUILDINGS
(38.540.050 (1) (B) (2)), SEE PARKING PLAN = 24
SPACES REQUIRED
25 SPACES PROVIDED; REQUESTING 15 SPACE REDUCTION
TOTAL BUILDING 1/A 73 SPACES REQUIRED (WITH REDUCTION)
74 SPACES PROVIDED FOR BUILDING 1/A INCLUDES 15
ON-STREET SPACES AND 50% ALLOWED REDUCTION FOR
MIXED-USE BUILDING PER 38.540.050 (1) (b) (2)
BUILDING 2/B (NORTHEASTERLY RESIDENTIAL BUILDING; 4-STORY)
ONE BEDROOM - 48 UNITS 1.5/DU = 72 SPACES 72 SPACES PROVIDED, SEE PARKING PLAN
TWO BEDROOM - 24 UNITS 2/DU = 24 SPACES 24 SPACES PROVIDED, SEE PARKING PLAN
TOTAL BUILDING 2/B 96 SPACES 96 SPACES PROVIDED, SEE PARKING PLAN
BUILDING 3/C (SOUTHWESTERLY RESIDENTIAL BUILDING; 4-STORY)
ONE BEDROOM - 90 UNITS 1.5/DU = 135 SPACES 137 SPACES PROVIDED, SEE PARKING PLAN
TWO BEDROOM - 82 UNITS 2/DU = 164 SPACES 164 SPACES PROVIDED, SEE PARKING PLAN
TOTAL BUILDING 3/C 299 SPACES 301 SPACES PROVIDED, SEE PARKING PLAN
BUILDING 4/D (WESTERLY MIXED-USE BUILDING; 3 STORY)
EFFICIENCY/STUDIO UNITS - 21 UNITS 1.25/DU = 27 SPACES 27 SPACES PROVIDED, 5 ON-STREET (38.540.050 (1) (a) (1)),
SEE PARKING PLAN
COMMERCIAL - ±5,962 SQ. FT. (RENTABLE**) 1/250 SF OF FLOOR AREA = 24 SPACES 24 SPACES PROVIDED, SEE PARKING PLAN
TOTAL BUILDING 4/D 51 SPACES REQUIRED 51 SPACES PROVIDED, SEE PARKING PLAN
TOTAL 519 SPACES
522 SPACES (INCLUDES 20 ON-STREET SPACES) (15
SPACE TOTAL REDUCTION FOR MIXED-USE BUILDING
1/A)
COMPACTED PARKING 25% OF REQUIRED PARKING - MAX 130 SPACES 43 COMPACT SPACES PROVIDED
ACCESSIBLE 2% OF TOTAL 11 ADA SPACES PROVIDED
ON-STREET PARKING (38.540.050 (1) (a) (1))
ON-STREET PARKING REDUCTION ±480 LF / 24 LF PER SPACE 20 SPACE REDUCTION, SEE ABOVE
PARKING LOT LANDSCAPING
20 SQ. FT. PER PARKING SPACE 522 SPACES X 20 SQ. FT. = 10,440 SQ. FT. ±10,628 SQ. FT. PROVIDED
BICYCLE PARKING
10% OF VEHICULAR PARKING 521X10%=52 SPACES MINIMUM 80 SPACES PROVIDED - 24 COVERED SPACES
** NOTE: THE COMMERCIAL RENTABLE NUMBER IS EXTERIOR WALL TO WALL MINUS BUILDING STAIRS, WHICH
SERVE THE RESIDENTS ABOVE AND MINUS THE PATIO POP-OUTS. THERE WILL BE 1 ACCESSIBLE UNIT AT EACH
GROUND LEVEL MIXED USE BUILDING TO ENSURE COMPLIANCE WITH FAIR HOUSING REQUIREMENTS.
PUBLIC PARKLAND DEDICATION TRACKING TABLE
SUBDIVISION NAME BRIDGER PEAKS VILLAGE SUBDIVISION
PROJECT NAME BOZEMAN EAST MIXED-USE
TOTAL PHASE 1 PHASE 2
NO. OF RES. UNITS PER PHASE 304 UNITS 193 UNITS 111 UNITS
ACREAGE PARKLAND REQUIRED 12 DU/AC X 9.0 ACRES X 0.03
ACRE/DU = 3.25 ACRES
12 DU/AC X 5.0 ACRES X
0.03 ACRE/DU = 1.8
ACRES
12 DU/AC X 4.0 ACRES X
0.03 ACRE/DU = 1.45
ACRES
TOTAL SITE AREA: 11.85
TSCHACHE LANE AREA: 0.55
ACRES
N. 15TH AVE: 0.1 ACRES
COMMON OPEN SPACE
REDUCTION PER P/R MEMO
DATED 08/27/20: 2.2 ACRES
PROPOSAL TO MEET PARKLAND DEDICATION
PROPOSED DEDICATION OF WALTON
STREAM FOR CONSERVATION AREA
PARKLAND WAIVER (38.420.020 (E) (1))
0.79 ACRES 0.79 ACRES N/A
PUBLIC TRAIL EASEMENT 0.6 ACRES 0.6 ACRES
VALUE OF IMPROVEMENTS IN-LIEU
PROPOSED $160,644.00 $160,644.00
$0.00 - PROVIDED IN
PHASE 1
PROPOSED CASH IN-LIEU $129,304.16 N/A $129,304.16
REQUIRED BASIC PARK IMPROVEMENTS $289,948.16 SEE PARK
EVALUATION IN NARRATIVE
ACREAGE PARKLAND PREVIOULSY
DEEDED TO COB N/A
ACREAGE PARKLAND YET TO BE
CONVEYED
1.39 ACRES WALTON STREAM
CONSERVATION AREA & PUBLIC
TRAIL EASEMENT
PARK MASTER PLAN APPROVAL DATE N/A
3
3
3
3
T1.0 OVERALL TITLE SHEET
EXHIBITS:
T1.1 EXHIBIT TITLE SHEET 11-13-20
EX-1 CONCEPTUAL SITE PLAN 11-13-20
EX-2 PARKING LAYOUT & CLACS 11-13-20
EX-3 BLOCK FRONTAGE & SECTIONS 11-13-20
EX-4 PARKLAND EXHIBIT 11-13-20
EX-5 ADJACENT PROPERTY OWNER EXHIBIT 05-29-19
EX-6 MASTER SITE PLAN 11-13-20
EX-7 ARCHITECTURAL RENDERING-BUILDING A 05-29-19
EX-8 PHASE 1 - SITE PLAN 11-13-20
CIVIL SHEETS:
T1.2 CIVIL TITLE SHEET 11-13-20
C000 COVER SHEET 11-13-20
C010 GENERAL NOTES, LEGEND & ABBREVIATIONS 11-13-20
C015 CONSTRUCTION TRAFFIC ROUTE MAP 11-13-20
C020 EROSION & SEDIMENT CONTROL DETAILS 11-13-20
C030 WATER DETAILS 11-13-20
C040 SANITARY SEWER DETAILS 11-13-20
C050 CURB, PAVING, APPROACH & DECORATIVE CROSSWALK DETAILS 11-13-20
C052 SIGNAGE & PAVEMENT MARKING DETAILS 11-13-20
C100 EXISTING SITE FEATURES & TOPOGRAPHY 11-13-20
C200 EROSION & SEDIMENT CONTROL - PHASE 1 - PRECONSTRUCTION 11-13-20
C201 EROSION & SEDIMENT CONTROL - PHASE 2 - SITE PREPARATION 11-13-20
C202 EROSION & SEDIMENT CONTROL - PHASE 3 - CONSTRUCTION 11-13-20
C300 WET UTILITY PLAN 11-13-20
C301 DRY UTILITY PLAN 11-13-20
C500 OVERALL SITE PLAN & DIMENSIONS PLAN 11-13-20
C501 SITE SIGNAGE & PAVEMENT MARKINGS 11-13-20
C600 OVERALL GRADING & DRAINAGE PLAN 11-13-20
C601 GRADING PLAN 11-13-20
C602 GRADING PLAN 11-13-20
C603 GRADING PLAN 11-13-20
C604 GRADING PLAN 11-13-20
C605 GRADING PLAN 11-13-20
C606 GRADING PLAN 11-13-20
C607 GRADING PLAN 11-13-20
C608 GRADING PLAN 11-13-20
C609 GRADING PLAN 11-13-20
C610 GRADING PLAN 11-13-20
ARCHITECTURAL SHEETS:
T1.3 ARCHITECTURAL TITLE SHEET 11-13-20
A0-00 COVER 11-13-20
A8-00 SITE PLAN 11-13-20
A8-01 BUILDING 'A' ELEVATIONS 11-13-20
A8-02 BUILDING 'B' ELEVATIONS 11-13-20
A8-03 BUILDING 'C' ELEVATIONS 11-13-20
A8-04 BUILDING 'C' ELEVATIONS 11-13-20
A8-06 BUILDING 'D' ELEVATIONS 11-13-20
A8-07 BUILDING AREA ANALYSIS 11-13-20
A8-08 BUILDING AREA ANALYSIS 11-13-20
A8-11 BUILDING 'A' FIRST FLOOR PLAN 11-13-20
A8-12 BUILDING 'A' SECOND FLOOR PLAN 11-13-20
A8-13 BUILDING 'A' THIRD FLOOR PLAN 11-13-20
A8-14 BUILDING 'A' ROOF PLAN 11-13-20
A8-21 BUILDING 'B' FIRST FLOOR PLAN 11-13-20
A8-22 BUILDING 'B' SECOND FLOOR PLAN 11-13-20
A8-23 BUILDING 'B' THIRD FLOOR PLAN 11-13-20
A8-24 BUILDING 'B' FOURTH FLOOR PLAN 11-13-20
A8-25 BUILDING 'B' ROOF PLAN 11-13-20
A8-31 BUILDING 'C' FIRST FLOOR PLAN 11-13-20
A8-32 BUILDING 'C' SECOND FLOOR PLAN 11-13-20
A8-33 BUILDING 'C' THIRD FLOOR PLAN 11-13-20
A8-34 BUILDING 'C' FOURTH FLOOR PLAN 11-13-20
A8-35 BUILDING 'C' ROOF PLAN 11-13-20
A8-41 BUILDING 'D' FIRST FLOOR PLAN 11-13-20
A8-42 BUILDING 'D' SECOND FLOOR PLAN 11-13-20
A8-43 BUILDING 'D' THIRD FLOOR PLAN 11-13-20
A8-44 BUILDING 'D' ROOF PLAN 11-13-20
A8-45 S1 ANSI UNIT PLAN 11-13-20
A8-46 A1(a) UNIT PLAN 11-13-20
A8-47 A1(d) UNIT PLAN 11-13-20
A8-48 A1(e) UNIT PLAN 11-13-20
A8-49 A1(g) UNIT PLAN 11-13-20
A8-50 A2(a) UNIT PLAN 11-13-20
A8-51 B1(a) UNIT PLAN 11-13-20
A8-52 B1(d) UNIT PLAN 11-13-20
A8-53 B1(e) UNIT PLAN 11-13-20
A8-54 B2(a) UNIT PLAN 11-13-20
A8-55 LEASING & CLUBROOM FLOOR 1 11-13-20
A8-56 FITNESS CENTER 11-13-20
A8-57 BUSINESS CENTER 11-13-20
A8-59 SINGLE TRASH ENCLOSURE 11-13-20
A8-60 BUILDING 'A' SECTIONS 11-13-20
A8-61 BUILDING 'B' SECTIONS 11-13-20
A8-62 BUILDING 'C' SECTIONS 11-13-20
A8-63 BUILDING 'C' SECTIONS 11-13-20
A8-64 BUILDING 'D' SECTIONS 11-13-20
ELECTRICAL/PLUMBING SHEETS:
T1.4 MEP TITLE SHEET 11-13-20
MEP0-00 MEP NOTES & LEGEND 11-13-20
E1.00 ELECTRICAL SITE PLAN 11-13-20
E1.01 ELECTRICAL SITE PHOTOMETRIC PLAN 11-13-20
E1.02 LIGHT FIXTURE CUT SHEETS 11-13-20
E1.03 LIGHT FIXTURE CUT SHEETS 11-13-20
P1.00 PLUMBING SITE UTILITY PLAN 11-13-20
LANDSCAPE PLANS
T1.5 LANDSCAPE TITLE SHEET 11-13-20
L1.00 COVER NOTES & LEGEND 11-13-20
L1.01 LANDSCAPE PLAN 11-13-20
L1.02 LANDSCAPE PLAN 11-13-20
L1.03 LANDSCAPE PLAN 11-13-20
L1.04 LANDSCAPE PLAN 11-13-20
L1.05 LANDSCAPE PLAN 11-13-20
L1.06 LANDSCAPE PLAN 11-13-20
L1.07 LANDSCAPE PLAN 11-13-20
L1.08 LANDSCAPE PLAN 11-13-20
L1.09 LANDSCAPE PLAN 11-13-20
L1.10 LANDSCAPE PLAN 11-13-20
L1.11 LANDSCAPE PLAN 11-13-20
L1.12 LANDSCAPE PLAN 11-13-20
L1.13 LANDSCAPE PLAN 11-13-20
L1.14 LANDSCAPE PLAN 11-13-20
L1.15 LANDSCAPE DETAILS 11-13-20
L1.16 LANDSCAPE DETAILS 11-13-20
L1.17 LANDSCAPE DETAILS 11-13-20
L2.00 IRRIGATION NOTES & LEGEND 11-13-20
L2.01 OVERALL IRRIGATION PLAN 11-13-20
L2.02 IRRIGATION PLAN 11-13-20
L2.03 IRRIGATION PLAN 11-13-20
L2.04 IRRIGATION PLAN 11-13-20
L2.05 IRRIGATION PLAN 11-13-20
L2.06 IRRIGATION PLAN 11-13-20
L2.07 IRRIGATION PLAN 11-13-20
L2.08 IRRIGATION PLAN 11-13-20
L2.09 IRRIGATION PLAN 11-13-20
L2.10 IRRIGATION PLAN 11-13-20
L2.11 IRRIGATION PLAN 11-13-20
L2.12 IRRIGATION PLAN 11-13-20
L2.13 IRRIGATION PLAN 11-13-20
L2.14 IRRIGATION PLAN 11-13-20
L2.15 IRRIGATION PLAN 11-13-20
L2.16 IRRIGATION DETAILS 11-13-20
IMPROVEMENTS IN-LIEU PARKLAND PLANS
T1.6 PARKLAND TITLE SHEET 11-13-20
PL1.00 COVER NOTES & LEGEND 11-13-20
PL1.01 OVERALL PARKLAND PLAN &
CALCULATIONS 11-13-20
PL1.02 PARKLAND PLAN 11-13-20
PL1.03 PARKLAND PLAN 11-13-20
PL1.04 PARKLAND PLAN 11-13-20
PL1.05 PARKLAND PLAN 11-13-20
PL1.06 PARKLAND PLAN 11-13-20
PL1.07 PARKLAND DETAILS 11-13-20
8