HomeMy WebLinkAboutTriangle Trail Project Update_TCC
Project Update and Comment Opportunities
January 21, 2021
The Triangle Trail Plan project has advanced and will be publishing the first draft plan by early
March 2021. The draft plan is informed by stakeholder focus groups, public engagement
through a virtual open house, steering committee input and national standards on trail design
and development. One of the focus groups focused on transportation infrastructure and
planning and included departments from Bozeman, Belgrade, Gallatin County and MDOT.
Through the focus groups and open house, the following themes were identified and are
guiding the plan framework.
Trail System
Connecting communities, neighborhoods and places
• Tiered approach of, and commuter pathways, connector trails and neighborhood trails
• Completing missing segments of trails corridors
• Provide for equity and diversity of users
• Design for low user conflicts
• Create a system that can have year-round use
Safety
• Create opportunities to have trails Separated from traffic
• Consider standards for road crossings, adequate sight distance and lighting
• Provisions for maintenance must include regular sweeping and snow removal
• Create trails that are safe and welcoming to all users, addressing the specific concerns of
women and people of color
Inclusivity
• Consistent wayfinding for unity across jurisdictions
• Education signs for the types of uses / customs
• Maps, distances and destinations
• Multiple languages – inclusion and welcoming
• Smart phone application integrated
• Benches, water, trash and recycling, interpretation and toilets
Standards
• Create standards for trail development and adopt these to ensure connectivity and
consistency across jurisdictions
• Standard details for different trail types, Intersections and street crossings
• Stream and ditch setback standards
• Provide consistent wayfinding
• Include standards for amenities such as, benches, water, trash and recycling, and toilets
• Include standards for landscaping, aesthetics, nature and gardens
Implementation
• Plan will establish priorities, recommended policies and regulations
• Trail construction should be integrated with subdivision development
• Commuter and connector trails will need to be funded from a variety of sources
• Construction and maintenance funding sources should be identified
There will be sneak peek presentations on the draft plan at the following meetings:
Planning Coordination Committee: February 9, 2021 3:30pm
Pedestrian and Traffic Safety Committee: February 10, 2021 12:00pm
Bozeman Bicycle Advisory Board: February 10, 2021 6:00pm
Bozeman Parks and Recreation Advisory Board: February 11, 2021 6:30pm
In early March, the draft plan will be published at www.triangletrailplan.com with opportunities
for public review and comment.