Loading...
HomeMy WebLinkAbout11 MSP 1.11 STREET TYPICAL SECTIONS 12-4-2020REVISION DATENORTHWEST CROSSING | STREET TYPICAL SECTIONS 3 AUGUST 2020 50 10 SCALE: 1” = 10’ 20 NORTH SECTION KEY CO T T O N W O O D R O A D BAXTER LANE ARTERIAL STREET 125’ ROW (OAK STREET) COLLECTOR ROAD 90’ ROW (LAUREL PARKWAY) 1’0.5’ 0.5’0.5’0.5’0.5’ 0.5’1’ STRIPE 1’ STRIPE 1’ 6’ SIDEWALK 6’ SIDEWALK 2’ EASEMENT 2’2’ 14’ BOULEVARD 14’ BOULEVARD10’ DRIVING LANE 10’ DRIVING LANE5’ BIKE LANE 5’ BIKE LANE 15’ DOUBLE LEFT TURNING LANE 90’ ROW 125’ ROW 60’65’ SO U T H R O W NO R T H R O W 1’ 1’10’ SIDEWALK 10’ SIDEWALK5’ BOULEVARD 8’ BOULEVARD 6’ BIKE LANE 6’ BIKE LANE11.5’ DRIVING LANE 11.5’ DRIVING LANE 28’ MEDIAN 11.5’ DRIVING LANE 11.5’ DRIVING LANE WEST OAK STREET LA U R E L P A R K W A Y MSP 1.11NOTE: BOULEVARDS, MEDIANS, AND ALLEYS SHOULD INCLUDE WATER-CONSCIOUS DESIGN, INTEGRATED STORMWATER MANAGEMENT, ETC. PER CITY OF BOZEMAN STANDARDS.