HomeMy WebLinkAbout1 MSP 1.01 COVER SHEET 12-4-2020REVISION DATECOVER SHEET
04 DECEMBER 2020
LANDSCAPE MIXED HIGH VISIBILITY CORNER MSP 1.01
NORTHWEST CROSSING
BOZEMAN, MONTANA ISSUE DATE: 12.04.2020
PROJECT TEAM PROJECT INFORMATION INDEX OF DRAWINGS VICINITY MAP
MASTER SITE PLAN
ARCHITECT
LOCATI ARCHITECTS
1007 E. MAIN ST. SUITE 202
BOZEMAN, MT 59715
CONTACT: LAURA DORNBERGER
(P) 406.587.1139
(C) 406.570.7496
(E) LDORNBERGER@LOCATIARCHITECTS.COM
PROPERTY OWNER
NWX, LLC
P.O. BOX 11890
BOZEMAN, MT 59719
CONTACT: BRYAN KLEIN
(P) 406.582.8100
(C) 406.581.3812
(E) BKLEIN@BLACKRIDGECO.COM
LEGAL DESCRIPTION
TRACT 5 OF COS 2552
SITE PLAN INFO
PHASED DEVELOPMENT MASTER SITE PLAN ENTITLEMENT
PERIOD TO BE FIVE YEARS.
FOLLOWING MASTER SITE PLAN APPROVAL, SEQUENTIAL
INDIVIDUAL SITE PLANS FOR SPECIFIC AREAS WITHIN
THE MASTER SITE PLAN SHALL BE SUBMITTED TO THE
PLANNING DEPARTMENT. EACH SITE PLAN SHALL BE
CONSISTENT WITH THE APPROVED MASTER SITE PLAN
AND/OR MODIFY THE MASTER SITE PLAN ACCORDINGLY
AND SUBJECT TO THE REVIEW CRITERIA OF BMC
38.19.100A.
OPEN SPACE
TO BE DETERMINED WITH SUBSEQUENT SUBDIVISION AND
SITE PLAN SUBMITTALS.
LOT AREA PERCENTAGES
TO BE DETERMINED WITH SUBSEQUENT SUBDIVISION AND
SITE PLAN SUBMITTALS.
FLOOR AREA RATIO
TO BE DETERMINED WITH SUBSEQUENT SUBDIVISION AND
SITE PLAN SUBMITTALS.
PARKING CALCULATIONS
TO BE DETERMINED WITH SUBSEQUENT SUBDIVISION AND
SITE PLAN SUBMITTALS.
SITE AREA
160.508 ACRES | 6,991,719
SQUARE FEET
CURRENT ZONING
B2M, REMU
CIVIL ENGINEER
MORRISON-MAIERLE
2880 TECHNOLOGY BOULEVARD WEST
BOZEMAN, MT 59718
CONTACT: MATT E. EKSTROM
(P) 406.922.6784
(C) 406.431.5819
(E) MEKSTROM@M-M.NET
PLANNER / LANDSCAPE ARCHITECTS
NORRIS DESIGN
244 NORTH COLLEGE AVENUE #130
FORT COLLINS, CO 80524
CONTACT: MITCH BLACK
(P) 303.892.1166
(C) 720.810.4828
(E) MBLACK@NORRIS-DESIGN.COM
MSP 1.01
MSP 1.02
MSP 1.03
MSP 1.04
MSP 1.05
MSP 1.06
MSP 1.07
MSP 1.08
MSP 1.09
MSP 1.10
MSP 1.11
MSP 1.12
MSP 1.13
MSP 1.14
MSP 1.15
MSP 1.16
MSP 1.17
MSP 1.18
MSP 1.19
MSP 1.20
C100
C110
C120
C130
C140
C300
C310
EX-1
SS-1
SS-2
SS-3
C400
EX-RDCL
EX-BSP
12/04/2020
08/03/2020
12/04/2020
12/04/2020
12/04/2020
08/03/2020
08/03/2020
08/03/2020
12/04/2020
08/03/2020
08/03/2020
10/13/2020
08/03/2020
08/03/2020
12/04/2020
12/04/2020
12/04/2020
12/04/2020
08/03/2020
08/03/2020
09/24/2019
03/11/2020
09/24/2019
03/11/2020
03/11/2020
03/11/2020
08/06/2020
07/13/2020
07/13/2020
07/13/2020
07/13/2020
03/11/2020
06/05/2020
06/05/2020
SHEET
CIVIL
DATECONTENT
COVER SHEET
AERIAL REGIONAL CONTEXT
FRAMEWORK PLAN AND ZONING
PARKS, OPEN SPACE & TRAILS FRAMEWORK
HOMESTEAD PARK VISION (P1,P2, P3)
POTENTIAL PARK AMENITIES
POTENTIAL PARK AMENITIES
PARK SIGN
TRANSPORTATION FRAMEWORK
STREET TYPICAL SECTIONS
STREET TYPICAL SECTIONS
STREET TYPICAL SECTIONS
STREET TYPICAL SECTIONS
STREET TYPICAL SECTIONS
PEDESTRIAN CONNECTIVITY FRAMEWORK
BICYCLE CONNECTIVITY FRAMEWORK
PHASING PLAN
LANDSCAPE FRAMEWORK
LANDSCAPE PALETTE
LANDSCAPE PALETTE
EXISTING TOPOGRAPHIC SURVEY
ZONING BOUNDARY ADJUSTMENT
SURFACE WATER AND WETLANDS
LOCATIONS
CONSTRUCTION MANAGEMENT PLAN -
INFRASTRUCTURE IMPROVEMENTS
CONSTRUCTION MANAGEMENT PLAN -
SITE IMPROVEMENTS
WATER UTILITY PLAN
SANITARY SEWER UTILITY PLAN
GRAVITY SEWER PLAN
GRAVITY SEWER PROFILES
GRAVITY SEWER PROFILES
GRAVITY SEWER PROFILES
PRELIMINARY STORM DRAINAGE PLAN
ROADWAY-CENTERLINE-DATA-EXHIBIT
SPORTS-PARK-COORDINATION-EXHIBIT
BAXTER LANE
W. OAK STREET
SITE
LA
U
R
A
L
S
T
R
E
T
C
O
T
T
O
N
W
O
O
D
R
O
A
D
REMU
B2M
BLOCK FRONTAGES
CITY LIMITS
PARK CALCULATIONS
FOR PARK LAND AREA DEDICATION REQUIREMENTS AND
PARK LAND AREA PROVIDED SEE SHEET MSP1.04