Loading...
HomeMy WebLinkAboutPeak-hour-demand 06-22-2020Page | 1 SE Engineers PO Box 10776 Bozeman, MT 59718 03/11/20 Aspen Properties Building Peak Hour Demand · Peaking Factor (Qmax /Q ave) = (18 + P 1/2 ) / (4 + P ½) o P = Population in thousands o P = 92 people = 0.092 Thousand of People o Qmax /Q ave = (18 + 0.303) / (4 + 0.303) = 18.303 / 4.303 = 4.25 o Qmax /Q ave = 4.25 · Building Average Daily Demand (ADD) o Office = sq.ft. X 0.09 = 9,189 sq.ft. X 0.09 = 827 GPD · Maximum Daily Demand (MDD) o MDD = Average Daily Demand (ADD) x 2.0 o MDD = 827 GPD X 2.0 o MDD = 1,654 GPD · Peak Hourly Demand (PHD) o Peak Hourly Demand = (Peaking Factor (Qmax /Q ave ) X MDD) / 24 hours/ day o Peak Hourly Demand = 4.25 x 1654 GPD / 24 hr/day o Peak Hourly Demand = 292.9 GPH SE Engineers Bill Edden, PE Owner, Mechanical Engineer