HomeMy WebLinkAboutConcept Review Planning Response 06-22-2020 1 May 21, 2020 Sarah Rosenberg Associate Planner Department of Community Development 20 E Olive St. 1 st Floor PO Box 1230 Bozeman, MT 59715 Re: Aspen Professional Building, Application 19446 Dear Sarah: This letter in in response to your Memo dated November 15, 2019. See our responses to your questions and or comments in red italics. Project Narrative: We are proposing a new two-story office building located at the corner of North 5th and Tamarack streets. The building site is on the “Pad Building Site” of The Aspen Crossing Project located at 515 West Aspen. The structure provides 9,191 s.f. of office area, and 650 s.f. mechanical area in the basement. The proposed uses for the building include professional offices, a small massage room, and small community room. As stated, the project is proposed for the pad building site at the “Aspen Crossing Project” at 515 West Aspen. It is our understanding that the proposed office use has been designed into the overall site plan for Aspen Crossing. Parking for the offices building should have a minimal impact to the overall site, as the peak parking demand for residential, retail and office uses will all vary on site. Furthermore, there is currently no set required parking within the B2-M zoning. Our design intent is to create an attractive professional office building that enhances the appearance of the neighborhood. The proposed location of the building is situated where the mobile homes currently sit on site. The elimination of the mobile homes will greatly enhance the appearance of the Tamarack street scape. The building is sited to offer an attractive and dynamic building façade along north 5th and Tamarack Street. The building façade will also screen the parking lot from 5th Street. Another design goal is to introduce new services to the neighborhood that currently do not exist. We are proposing professional office space, and a small community space. The proposed “infill” location for the professional offices will lessen the impact of growth to the west of Bozeman. No phasing is proposed for the project. We would like to start construction of the project in the spring of 2020. Planning Division, Danielle Garber, dgarber@bozeman .net, 406-582-2272 1. The subject property is zoned B-2M. A Site Plan application is required for entitlement. 2. Provide copies of all applicable approved legal documentation granting shared parking, access, drainage and utilities such as recorded easements and condominium documents with the formal submittal. 3. The block frontage designation on North 5 th and Tamarack is Mixed. The formal submittal must include in the narrative and drawings how the site design and architecture meet the Mixed-Landscaped or Mixed-Storefront standards detailed in Section 38.510.030 including the following: a. Building placement Response: The building fits within the pad site as submitted in the “Midtown at Aspen” submittal. b. Building entrances Building entrances are directly accessible either from the street or the parking area. c. Parking location Response: Parking was addressed in the “Midtown at Aspen” submittal. d. Facade transparency Response: Transparency calculations are shown on the exterior elevation sheets. e. Weather protection Response: Weather protection for primary entrances is provided by awnings having a depth of either 4’-0” or 4’-6”. f. Landscaping Response: See landscaping plans. g. Sidewalk width Response: 7’-0” sidewalks are provided, see site plan. 4. 38.520.060- On site commercial open space. Provide in the narrative and drawings an area calculation and location(s) for commercial open space. If utilizing pedestrian oriented open space demonstrate that the standards in 38 .520.060.D are being addressed. Response: Open space requirements were addressed in the “Midtown at Aspen” submittal. 5. How is solid waste collected? A trash enclosure and the utility meters must meet screening standards in Section 38 .520.070.C. Response: The trash enclosure was included in the “Midtown at Aspen” submittal. The utility meters are screened by landscaping elements as shown in the landscape plan. 3 6. Demonstrate in your narrative and drawings that the building design is meeting the criteria in Section 38 .530 including: a. Massing and Articulation Response: The exterior meet or exceeds the requirements of 38.530.040 b. Building Details Response: The exterior meets the requirements of 38.530.050 c. Building Materials - a color material palette is required with formal submittal Response: Building materials are now shown on the exterior elevation sheets. d. Blank Wall Treatments Response: There are no blank wall areas of sufficient size. 7. 38.540- Parking. While there are no parking minimums in this area of B-2M, there are maximum parking requirements, and minimum bicycle parking requirements. Provide a parking calculation for review of these requirements. Response: 6 bicycle parking spaces have been provided. Automobile parking was included in the “Midtown at Aspen” submittal. 8. Landscaping performance standards in Section 38.550 require 23 landscape performance points for this phase . Response: Landscaping points are no longer required. 9. A photometric plan and lighting cutsheets are required to satisfy Section 38.570 . Response: Photometric plan and lighting cutsheets are now provided on AL1.0. Engineering Division, Lance Lehigh, lleh igh@bozeman .net , 406-582-2284 1. See attached memo dated November 12, 2019 Solid Waste Division, Russ Ward, rward@bozeman .net , 406-582-3235 1. Need to identify the location for refuse enclosure 2. Need detailed plan for refuse enclosure. 3. Refuse enclosure will need to be covered Thank you for your time in this matter. Jesse Sobrepena, AIA JDS Architects, Inc.