HomeMy WebLinkAboutCIL of Water Rights 06-22-2020From: Jesse Sobrepena
Sent: Tuesday, September 15, 2020 12:01 PM
To: Reuben Travis
Subject: FW: Aspen Building - Request for CIL Water Right Amount (19446)
Reuben,
Please save this e-mail and pdf print it for the site plan response list for Aspen.
Thanks,
Jesse D. Sobrepena, AIA
JDS Architects, Inc.
719 West Mendenhall
Bozeman, MT 59715
p 406-556-8080
c 406-581-3939
e-mail: jesse@jdsarchitectsbozeman.com
web: http://jdsarchitectsbozeman.com
From: Brian Heaston < bheaston@BOZEMAN.NET >
Sent: Tuesday, September 15, 2020 11:04 AM
To: 'Clint Litle' < clitle@alpinesurveying.net >
Cc: Marcus Hawkes < marcus@jdsarchitectsbozeman.com >; Jesse Sobrepena
<jesse@jdsarchitectsbozeman.com >; Reuben Travis < reuben@jdsarchitectsbozeman.com >
Subject: RE: Aspen Building - Request for CIL Water Right Amount (19446)
Thanks Clint – For the June – Sept irrigation season, the total irrigation demand is 17,600 gal or 0.05
AF. Adding this volume to indoor domestic below totals 0.33 AF. Prelim CILWR produced for that
demand is $1,980.
Will confirm the final fee when the site plan is submitted.
Sincerely,
Brian
From: Clint Litle < clitle@alpinesurveying.net >
Sent: Monday, September 14, 2020 11:13 AM
To: Brian Heaston < bheaston@BOZEMAN.NET >
Cc: 'Marcus Hawkes' < marcus@jdsarchitectsbozeman.com >; 'Jesse Sobrepena'
<jesse@jdsarchitectsbozeman.com >; 'Reuben Travis' < reuben@jdsarchitectsbozeman.com >
Subject: RE: Aspen Building - Request for CIL Water Right Amount (19446)
Brian:
Attached is landscape plan for Aspen Building, see sheet I-1 for irrigation water use.
Total Gal / Week = 1099.65
With this information combined with your email below we should be able to finalize the CILWR amount.
Sincerely
Clint Litle, PE
Senior Civil Engineer
Alpine Surveying & Engineering, Inc.
2075 Charlotte Street, Suite 1
Bozeman, MT 59718
406.539.8429 Cell
406.586.5599 Office
clitle@alpinesurveying.net
From: Brian Heaston < bheaston@BOZEMAN.NET >
Sent: Wednesday, May 6, 2020 5:45 PM
To: 'Clint Litle' < clitle@alpinesurveying.net >
Cc: 'Marcus Hawkes' < marcus@jdsarchitectsbozeman.com >; 'Jesse Sobrepena'
<jesse@jdsarchitectsbozeman.com >
Subject: RE: Aspen Building - Request for CIL Water Right Amount (19446)
Marcus pointed out that the square footage number one plan sheet is for the general bldg pad. This
message corrects the domestic CILWR demand amount to reflect the gross square footage of the office
building itself.
9,189 sq ft * 10,000/gal/yr/1000 sq ft = 91,890 gal/yr or 0.28 AF/yr . Landscape irrigation annual
demand, if supplied from city system, will be added on top.
B
From: Brian Heaston
Sent: Wednesday, May 6, 2020 3:55 PM
To: 'Clint Litle' < clitle@alpinesurveying.net >
Cc: 'Marcus Hawkes' < marcus@jdsarchitectsbozeman.com >; Jesse Sobrepena
<jesse@jdsarchitectsbozeman.com >
Subject: RE: Aspen Building - Request for CIL Water Right Amount (19446)
Clint – Consider this message the preliminary CILWR fee determination for the project. Analysis of
metered water use for office buildings connected to city water system indicate that offices use water at
a rate of 10,000gal/yr/1000sqft of building space. Given that the building has a gross area of 10,852 sq
ft, the anticipated annual domestic demand is 108,520 gal/yr or 0.33 AF/yr. This is significantly less
volume than determined by Bill’s calculation (0.92 AF/yr). Not sure where he got his numbers from
since a reference wasn’t provided.
The final fee must include landscape irrigation demand if the irrigation supply source is the City water
supply. I’m not seeing a well on the overall site plan provided so am presuming city connection to be
the case. The landscape irrigation demand will be taken directly from the estimated water use shown
on the landscape plan sheets.
Can wrap this up if you provide the landscape plan sheet with estimated water use now, or can circle
back and get that once the application materials are submitted.
Sincerely,
Brian
From: Clint Litle < clitle@alpinesurveying.net >
Sent: Wednesday, May 6, 2020 9:51 AM
To: Brian Heaston < bheaston@BOZEMAN.NET >
Cc: 'Marcus Hawkes' < marcus@jdsarchitectsbozeman.com >; Jesse Sobrepena
<jesse@jdsarchitectsbozeman.com >
Subject: Aspen Building - Request for CIL Water Right Amount (19446)
Brian:
This email is request calculation of CILWR for the proposed Aspen Building at the intersection of West
Tamarack Street & North 5 th Avenue (See attached site plan).
The water use for the proposed building is detailed on the attached letter from Bill Edden, PE the
mechanical engineer on the project.
Any questions please feel free to call or email.
Sincerely
Clint Litle, PE
Senior Civil Engineer
Alpine Surveying & Engineering, Inc.
2075 Charlotte Street, Suite 1
Bozeman, MT 59718
406.539.8429 Cell
406.586.5599 Office
clitle@alpinesurveying.net
City of Bozeman emails are subject to the Right to Know provisions of Montana’s Constitution (Art. II,
Sect. 9) and may be considered a “public record” pursuant to Title 2, Chpt. 6, Montana Code Annotated.
As such, this email, its sender and receiver, and the contents may be available for public disclosure and
will be retained pursuant to the City’s record retention policies. Emails that contain confidential
information such as information related to individual privacy may be protected from disclosure under
law.
City of Bozeman emails are subject to the Right to Know provisions of Montana’s Constitution (Art. II,
Sect. 9) and may be considered a “public record” pursuant to Title 2, Chpt. 6, Montana Code Annotated.
As such, this email, its sender and receiver, and the contents may be available for public disclosure and
will be retained pursuant to the City’s record retention policies. Emails that contain confidential
information such as information related to individual privacy may be protected from disclosure under
law.