Loading...
HomeMy WebLinkAbout020 A3.0 EXTERIOR ELEVATIONS 12-30-20A 3 . 0 J D S J D S 1 9 - 0 0 4 1 / 4 " = 1 ' - 0 " 8 1 5 N O R T H 5 T H D A I N T E R I O R S S T O R E F R O N T D O O R & F R A M E T H I N B R I C K V E N E E R ( W H I T E ) AWNING WINDOWS 1 2 " , 1 6 " , 1 8 " M E T A L S A L E S M I N I - B A T T E N 1 . 5 , 2 4 g a S T A N D I N G S E A M S I D I N G ( O L D Z I N C G R A Y ) , O R E Q U I V . 2 6 5 4 3 10'-0"T.O. FIRST 14'-2"T.O. SECOND13'-9 3/8"T.O.W.13'-9 3/8"5 3/8"13'-0" M E T A L A W N I N G S ( B L A C K ) METAL AWNINGS(BLACK)FLANGED WINDOW(DK. BRONZE) A L U M I N U M F L A N G E D W I N D O W S ( D K . B R O N Z E ) 30'-2 3/4"T.O. PARAPET M E T A L A W N I N G S ( B L A C K ) 103 1 0 4 C 1 0 5 R T S O O T E U U T E M P . T E M P . T E M P . T E M P . T E M P . T E M P . T E M P . M E T A L C O P I N G C A P ( B L A C K ) T H I N B R I C K V E N E E R ( W H I T E ) T E M P . D E 27'-2 3/4"T.O. LEDGER 3'-0" M E C H A N I C A L S C R E E N I N G 7 / 8 " C O R R U G A T E D M E T A L S I D I N G ( B L A C K ) B IA8.5 DA8.5 D A 8 . 5 F A 8 . 5 C A 8 . 6 D A 8 . 3 2 7 ' - 8 1 / 2 " T . O . P A R A P E T 2 4 ' - 8 3 / 4 " T . O . L E D G E R BRAKE METAL (BLACK) B R A K E M E T A L ( B L A C K ) B R A K E M E T A L ( B L A C K ) S T E E L F R A M E ( B L A C K ) 8 " S . S . L E T T E R S , 4 S Q U A R E F E E T , O F F S E T L E T T E R S F R O M M O U N T I N G S U R F A C E , B A S I C B L O C K F O N T 8 " S . S . L E T T E R S , 6 S Q U A R E F E E T , O F F S E T L E T T E R S F R O M M O U N T I N G S U R F A C E , B A S I C B L O C K F O N T 1 / 4 " = 1 ' - 0 " S O U T H E L E V A T I O N A A 3 1 / 4 " = 1 ' - 0 " W E S T E L E V A T I O N B A 3 TRANSPARENCY (UDO SEC. 38.510.30)NORTH FACADETOTAL AREA (BTWN 4' & 8')218 S.F.TRANSPARENT AREA (BTWN 4' & 8') 83 S.F.PERCENT TRANSPARENT 37%EAST FACADETOTAL AREA (BTWN 4' & 8')360 S.F.TRANSPARENT AREA (BTWN 4' & 8')203 S.F.PERCENT TRANSPARENT56%MAXIMUM HEIGHT ABOVE GRADE29'-11"MINIMUM HEIGHT ABOVE GRADE0'-6"SIGNAGE (UDO SEC. 38.560)TOTAL FRONTAGE (WITH SIGNS)235 S.F.1ST 25':3*25*3 = 225 S.F.> 25': 2(65*1.5)+(30*1.5) = 240TOTAL465 S.F. (EXCEEDS MAXIMUM)MAXIMUM ALLOWED PER LOT 400 S.F.TOTAL SIGNAGE PROVIDEDEAST ELEV.16.4 S.F.SOUTH ELEV.6.4 S.F.WEST ELEV.14.3 S.F.37.1 S.F.0'-0"T.O. FIRST 14'-2"T.O. SECOND13'-9 3/8"T.O.W. 3 0 ' - 2 1 / 2 " P A R A P E T 13'-9 3/8"4 5/8"10'-6 3/4"METAL AWNINGS(DK. BRONZE) 8 1 5 N O R T H 5 T H A E D C B A W N I N G W I N D O W S THIN BRICK VENEE R (WHITE) S T O R E F R O N T D O O R S & F R A M E S M E T A L A W N I N G S ( B L A C K ) M E T A L A W N I N G S ( B L A C K ) F L A N G E D W I N D O W S ( D K . B R O N Z E ) 1 1 4 G H F F V U V A D W T E M P . T E M P . T E M P . T E M P . T E M P . T E M P . M E T A L C O P I N G C A P ( B L A C K ) 2'-11 3/4"1x6 T&G CEDAR W/CLEAR UV FINISH 2 7 ' - 3 3 / 8 " T . O . L E D G E R M E C H A N I C A L S C R E E N I N G 7 / 8 " C O R R U G A T E D M E T A L S I D I N G ( B L A C K ) 1 2 " , 1 6 " , 1 8 " M E T A L S A L E S M I N I - B A T T E N 1 . 5 , 2 4 g a S T A N D I N G S E A M S I D I N G ( O L D Z I N C G R A Y ) , O R E Q U I V . C D A 8 . 3 C A 8 . 3 J A 8 . 5 C A 8 . 4 G A 8 . 5 24'-8 3/4"T.O. LEDGER 27'-8 1/2"T.O. PARAPETBRAKE METAL (BLA C K ) B R A K E M E T A L ( B L A C K ) 1 x 6 T & G C E D A R W / C L E A R U V F I N I S H 8" S.S. LETTERS, 4 S Q U A R E F E E T , OFFSET LETTERS F R O M M O U N T I N G SURFACE, BASIC B L O C K F O N T 8-31-201 THD.R.C. REVISIONS (DARK BRONZE)·FLANGED METAL WINDOW·STOREFRONT DOORS & FRAMES(WHITE)MUTUAL MATERIALSTHIN BRICK VENEER(CLEAR UV FINISH)1x6 T&G CEDAR (OLD ZINC GRAY)12", 16",18" METAL SALES MINI BATTEN1.5", 24 GA. STANDING SEAM SIDING (BLACK)·METAL COPING CAP·MECHANICAL SCREENING 7/8"CORRUGATED METAL·TUBE STEEL GUARDRAIL/ HANDRAILS·BRAKE METAL·METAL AWNINGS·STEEL FRAME(CLEAR COAT)10 GA. HOT ROLLED STEEL 8-31-201 (NATURAL)BOARD FORMED CONCRETENORTH & SOUTH 54'-6" STREET FRONTAGE GENERAL SIGNAGE NOTES:94.4 S.F.MAXIMUM SIGNAGE AREAWEST 84'-6" FRONTAGE EAST 90'-0" STREET FRONTAGE BUILDING FRONTAGETOTAL BUILDING SIGNAGE NOT TO EXCEED 400 S.F. PER B-2M ZONING SEECITY OF BOZEMAN UDO CHAPTER 38.560 147.5 S.F.94.4 S.F.12-1-202 2 D.R.C. REVISIONS 12-1-20 TH 1 2 - 1 - 2 0 2 1 2 - 1 - 2 0 2 1 2 - 1 - 2 0 2