Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
C 120 Surface Water and Wetlands Locations-Drain Tile 062920
DYH DYH DYH DYH DYH DYHDYH DYH I S GV I SSSSSSS S GV MW MW MW MW MW MW MW MW S S S S S S S S S S S S S TP TP TP TP TP TP TP TP TP TP TP TP TP TP T WV WV WV WV WV WVWVWVWVWVWVWVWV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WVWV WV WV WV WV WV WV WV S0 ° 5 9 ' 4 1 " W 2 6 2 7 . 4 9 ' S89°30'03"W 2649.87' N0 ° 2 5 ' 5 2 " E 2 6 2 5 . 1 7 ' N89°27'46"E 2675.75' MW MW MW MW MW MW MW MW CO CO CO CO COCO CO CO FIGURE NUMBER © PROJECT NO.DRAWN BY: DSGN. BY: APPR. BY: DATE: COPYRIGHT MORRISON-MAIERLE, INC.,2020 N:\5659\004 NW Crossing Master Site Plan\ACAD\Exhibits some MSP EX are in 005 Acad Survey Pre App\C 120 Surface Water and Wetlands Locations.dwg Plotted by matt e. ekstrom on Jul/13/2020 engineers surveyors planners scientists MorrisonMaierle 2880 Technology Blvd West Bozeman, MT 59718 406.587.0721 www.m-m.net 5659.004 C120 NORTHWEST CROSSING SUBDIVISION BOZEMAN MT SURFACE WATER AND WETLANDS LOCATIONS MEE MEE MEE 07/2020 200 4001002000 SCALE IN FEET 50' WETLAND SETBACK DELINEATED WETLAND BOUNDARY 50' WETLAND SETBACK DELINEATED WETLAND BOUNDARY BAXTER DITCH BAXTER CREEK GROUNDWATER MON. WELL - #1 GROUNDWATER MON. WELL - #3 GROUNDWATER MON. WELL - #4 GROUNDWATER MON. WELL - #14 GROUNDWATER MON. WELL - #13 GROUNDWATER MON. WELL - #7 GROUNDWATER MON. WELL - #8 GROUNDWATER MON. WELL - #10 DRAIN TILE CLEANOUT DRAIN TILE CLEANOUT DRAIN TILE CLEANOUT DRAIN TILE CLEANOUT EXISTING 4" PERFORATED DRAINTILE ASSUMED LOCATION OF EXISTING 4' DRAIN TILE THE DRAIN TILE LINE WAS LOCATED IN THE SPRING OF 2020 AND IS ILLUSTRATED BETWEEN THE CLEAN OUTS SHOWN ON THIS DRAWING. OUTSIDE THE CLEAN OUTS THE ILLUSTRATED IS AN ASSUMED LOCATION BASED ON CONVERSATIONS WITH THE CONTRACT FARMER WHO INSTALLED THE DRAIN TILE IN 2012 OR 2013. ASSUMED LOCATION OF EXISTING 4' DRAIN TILE LATERALS