Loading...
HomeMy WebLinkAboutGIBSON GUITAR WATER ADEQUACY CILWR 9-28-20From:Brian Heaston <bheaston@BOZEMAN.NET> To:Cody Croskey <Cody.Croskey@tdhengineering.com> CC:Jake Steding <JakeS@architects-sma.com> Date:9/28/2020 11:49 AM Subject:RE: Gibson Guitar Domestic and Irrigation Water Adequacy Hi Cody – The calcs look good to me. 4.2 AF increase is acceptable given the info provided below. We’ll confirm the irrigation volume from the landscape sheets and add that to the 2.7 AF increased domestic use. Brian From: Cody Croskey <Cody.Croskey@tdhengineering.com> Sent: Monday, September 28, 2020 10:37 AM To: Brian Heaston <bheaston@BOZEMAN.NET> Cc: Jake Steding <JakeS@architects-sma.com> Subject: Gibson Guitar Domestic and Irrigation Water Adequacy Good Morning Brian, Per our discussion last week, DNRC is unable to find existing water right claims for the irrigation wells at the Gibson Guitar property. Given the well locations within the Bozeman Solvent Site CGWA it is assumed these wells will need to be disconnected until such time as the CGWA is absolved or existing water rights for these wells are discovered. Additionally, we are unable to identify process water or planned fixture upgrade reductions at this point in the design, so the domestic demand increase assumes a linear escalation to increase from 160 to 286 peak employees/day at the facility. Calculations for the estimated domestic water demand increase and connection of the new irrigation system to City water are provided below. Would you have a chance to review and offer any comments as it relates to water adequacy and CILWR payments for this project? Domestic Water Use: Current Average Domestic Water Use - Meter Data Jan 2015- Jun 2020: 3,067 GPD = 3.44 AC-FT/YR Current Peak Users: 160 employees/day Current Daily Use/Employee: 19.17 GPD Projected Peak Users: 286 employees/day Projected Daily Use/Employee: 19.17 GPD Projected Average Domestic Water Use: 5,483 GPD = 6.14 AC-FT/YR Projected Domestic Water Use Increase: +2,416 GPD = +2.7 AC-FT/YR Irrigation Water Use: Irrigated turf area: 30,252 SF = 0.69 acres Turf watering rate (May-Oct): 24 in/yr Annual turf irrigation volume: 1.38 AC-FT/YR Individual plant watering rate (24-weeks May-Oct): 1,922 gal/wk Annual plant irrigation volume: 0.14 AC-FT/YR Projected Irrigation Water Use: +1.5 AC-FT/YR Total Project Water Use Increase: +4.2 AC-FT/YR Let me know if you have any questions or require additional information. Thanks, Cody Croskey, P.E. l Civil Engineer TD&H Engineering 234 E. Babcock Street, Suite 3 l Bozeman, MT 59715 p: 406.586.0277 l c: 406.580.0685 l d: 406.602.4091 www.tdhengineering.com City of Bozeman emails are subject to the Right to Know provisions of Montana’s Constitution (Art. II, Sect. 9) and may be considered a “public record” pursuant to Title 2, Chpt. 6, Montana Code Annotated. As such, this email, its sender and receiver, and the contents may be available for public disclosure and will be retained pursuant to the City’s record retention policies. Emails that contain confidential information such as information related to individual privacy may be protected from disclosure under law.