HomeMy WebLinkAboutEDS1.1 - EXISTING SITE PLANTF
W
SD
GIBSON GUITAR
ARCHITECTURAL F.F. ELEVATION
5482'-6" = 100'0" = T.O. CONC. SLAB
ORVILLE WAY
SI
M
M
E
N
T
A
L
W
A
Y
E;ISTING BUILDINGE;ISTING BUILDING
E;ISTING BUILDING
PROPERTY LINE PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
BIM FILE PATH:
SHEET NO.:
TITLE:
copyright 2018 SMA, P.C.
REVISIONS:
KEYMAP:
HELENA
920 Front Street | Suite 101
Helena | MT | 59601
P| 406/442.4933
www.architects-sma.com
ENGINEER SEAL:
PROJECT:
PROJECT LOCATION:
PREPARED FOR:
LOGO:
CONSULTANT:
PROJECT NUMBER:
DRAWN BY:
CHECKED BY:
TEAM:
PHASE:
DATE:
PROJECT NUMBER:
1620
10/9/2020
TTW, CVD
STE, TTW
GIBSON ACOUSTIC
1620
1894 ORVILLE WAY
BO=EMAN, MT 59715
SITE AND SHELL PERMIT
BO=EMAN
109 East Oak Street | Suite 2E
Bozeman | MT | 59715
P| 406/219.2216
www.architects-sma.com
NO.DATE REVISION DESCRIPTION
EDS1.1
E;ISTING SITE PLAN
SITE PLAN - ELECTRICAL DEMOLITION
SCALE: 1" = 30'
N