Loading...
HomeMy WebLinkAboutEDS1.1 - EXISTING SITE PLANTF W SD GIBSON GUITAR ARCHITECTURAL F.F. ELEVATION 5482'-6" = 100'0" = T.O. CONC. SLAB ORVILLE WAY SI M M E N T A L W A Y E;ISTING BUILDINGE;ISTING BUILDING E;ISTING BUILDING PROPERTY LINE PROPERTY LINE PROPERTY LINE PROPERTY LINE PROPERTY LINE PROPERTY LINE PROPERTY LINE PROPERTY LINE PROPERTY LINE BIM FILE PATH: SHEET NO.: TITLE: copyright 2018 SMA, P.C. REVISIONS: KEYMAP: HELENA 920 Front Street | Suite 101 Helena | MT | 59601 P| 406/442.4933 www.architects-sma.com ENGINEER SEAL: PROJECT: PROJECT LOCATION: PREPARED FOR: LOGO: CONSULTANT: PROJECT NUMBER: DRAWN BY: CHECKED BY: TEAM: PHASE: DATE: PROJECT NUMBER: 1620 10/9/2020 TTW, CVD STE, TTW GIBSON ACOUSTIC 1620 1894 ORVILLE WAY BO=EMAN, MT 59715 SITE AND SHELL PERMIT BO=EMAN 109 East Oak Street | Suite 2E Bozeman | MT | 59715 P| 406/219.2216 www.architects-sma.com NO.DATE REVISION DESCRIPTION EDS1.1 E;ISTING SITE PLAN SITE PLAN - ELECTRICAL DEMOLITION SCALE: 1" = 30' N