HomeMy WebLinkAboutE2.1 - LEVEL 1 FLOOR PLAN - LIGHTINGOS
3
3
3
3
3
3
3
3
3
3
OS 3
3
3
3
3
3
O
S
OS
OS
03 03
05 05A
A
B
B
C
C
04 04
D
D
02 02
01 01
SE
A
L
/
C
O
L
O
R
R
O
O
M
12
1
LO
A
D
I
N
G
D
O
C
K
12
8
??
J1
12
'
-
0
"
J1
12
'
-
0
"
J1
15
'
-
0
"
J1
15
'
-
0
"
J1
15
'
-
0
"
J1
12
'
-
0
"
J1
12
'
-
0
"
J1
12
'
-
0
"
J1
12
'
-
0
"
(E
)
V8
E
D1
D1
G1
E
H1
E
H1
E
H1
E
H1
E
H1
E
H1
E
H1
E
H1
E
H1
E
H1
E
H1
E
H1
E
H
1
E
H
1
E
H1
E
H1
E
H1
E
H1
E
H1
E
H1
E
H1
E
H1
E
H1
E
H1
E
H1
E
H1
E
H1
E
H1
E
G1
E
G1
E
G1
E
G1
E
EX
I
S
T
I
N
G
B
U
I
L
D
I
N
G
X1
X1
X1
X1
HC HC
2
LC LC
2
LC
3
LB
2
LB
HB
HA
LA
LA
2
X1
X1
X1
(E)(E)
(E
)
(E
)
V8
E
D1
D1
1
1
G1
E
X1
H1
E
H1
E
X1
X1
G1
E
G1
E
11
V2
D1
V2
D1
V2
D1
(E
)
T N 0 MAN A N A L E N G I N E E R O I SSEFORPOOWhitlockNo. 60587PETanner T.D E S N E C IL BIM FILE PATH:SHEET NO.:TITLE:copyright 2018 SMA, P.C.REVISIONS:KEYMAP:HELENA 920 Front Street | Suite 101 Helena | MT | 59601 P| 406/442.4933 www.architects-sma.com ENGINEER SEAL:PROJECT:PROJECT LOCATION:PREPARED FOR:LOGO:CONSULTANT:PROJECT NUMBER:DRAWN BY:CHECKED BY:TEAM:PHASE:DATE:PROJECT NUMBER:
P
l
o
t
D
a
t
e
:
BOZEMAN 109 East Oak Street | Suite 2E Bozeman | MT | 59715 P| 406/219.2216 www.architects-sma.com E:\Documents\2007 GIBSON SHELL MEP CENTRAL MODEL 20_twhitlockA8DLY.rvt
1
2
/
8
/
2
0
2
0
5
:
3
7
:
1
8
P
M
E2.1162010/9/2020LEVEL 1 FLOOR PLAN -LIGHTINGTTWSTEGIBSON ACOUSTIC 1620 1894 ORVILLE WAY BOZEMAN, MT 59715 SITE AND SHELL PERMITGENERAL PLAN NOTES 1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INCLUDING EQUIPMENT S UPPLIERS TO COORDINATED WITH EACH OTHER AND TO VERIFY THAT THERE ARE NO CON FLICTS IN LOCATIONS OF DUCTS, CONDUITS, SPRINKLER HEADS, SPRINKLER PIPING , DIFFUSERS, ELECTRICAL BOXES AND OTHER ITEMS THROUGHOUT THIS PROJECT, BEFOR E FINAL PLACEMENT OF MATERIALS. 2.REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL INFORMATION: DET AILED EQUIPMENT REQUIREMENTS, INSTALLATION INSTRUCTIONS, PERFORMANCE REQUIREMENTS, CONTROL SEQUENCES AND ALL OTHER PROJECT DETAILS. 3.INSTALL ALL NEW WORK TO MEET CURRENT CODES AND INSTALLATION STA NDARDS.4.NEW CONDUCTORS SHALL BE COPPE R AND A MINIM UM OF #12 GAUGE.5.LIGHT FIXTURES SHOWN WITH A HEIGHT CALLOUT (XX") SHALL BE INSTA LLED AS DESCRIBED HERE. THE HEIGHT CALLOUT SHALL BE THE DISTANCE FROM F INISHED FLOOR/ GRADE TO THE BOTTOM OF THE RESPECTIVE LIGHT FIXTURE.6.THE CIRCUITRY SHOWN IN A SOLID LINETYPE SHALL BE NORMAL POWER. THE CIRCUITRYSHOWN IN A DASHED LINETYPE SHALL BE LOW -VOLTAGE CABLING FOR THE LIGHTING CONTROLS. PROVIDE AND INSTALL PER MANUFACTURER'S REQUI REMENTS.7.INSTALL EXTERIOR BUILDING MOUNTED LIGHT FIXTURES PER THE ARCHIT ECTURAL ELEVATIONS. COORDINATE PRIOR TO ROUGH -IN.8.0 -10V LOW -VOLTAGE DIMMING CABLE IS NOT SHOWN ON THE PLANS. PROVIDE CABLIN G BETWEEN 0 -10V DIMMER(S) AND THEIR RESPECTIVE DIMMING BALLAST(S) WHICH THE Y CONTROL PER THE DIMMER MANUFACTURER'S REQUIREMENTS.9.EMERGENCY BATTERY BALLAST(S), EMERGENCY EGRESS BUGEYES AND EXIT SIGNS SHALL BE PROVIDED WITH AN UN -SWITCHED HOT CONDUCTOR FROM THE SAME CIRCUIT AS THE RESPECTIVE SWITCH -LEG.CONSTRUCTION NOTES POWER LIGHTS WITHIN THE RESTROOMS FROM RECEPTACLE CIRCUIT WITHI N THE SPACE. CONTROL FROM LINE VOLTAGE OCCUPANCY SENSOR OR OCCUPANCY SWITCH AS SHOWN.1
1/
1
6
"
=
1
'
-
0
"
1
LE
V
E
L
1
F
L
O
O
R
P
L
A
N
-
L
I
G
H
T
I
N
G
NO. DATE REVISION DESCRIPTION