HomeMy WebLinkAboutGIBSON GUITAR COMMENT RESPONSES 01-06-2021SPR comments|
SPR submittal
GIBSON GUITAR DESIGN BUILD | 1894 ORVILLE WAY
GIBSON GUITTAR
377u
MEMORANDUM
----------------------------------------------------------------------------------------------------------
FROM: DANIELLE GARBER, ASSOCIATE PLANNER
DEVELOPMENT REVIEW COMMITTEE
RE: GIBSON GUITAR SITE PLAN, APPLICATION 20302
DATE: DECEMBER 23, 2020 ----------------------------------------------------------------------------------------------------------
Project Description: ͵ͺǡͲͲͲ
Ǥ ͳ͵ ǡ Ǥ
Project Location: ͳͺͻͶǡ ǣ
•
ǡ͵ͷǡͲͳǡͲͷǡʹǡ ʹǤͳǡ Ͷʹ
•
ǡ͵ͷǡͲͳǡͲͷǡͳǡ ʹǤͶʹʹǡʹǡ Ͷ
•
ǡ͵ͷǡͲͳǡͲͷǡ͵ǡ ʹǤͶʹʹǡ Ͷ
Recommendation: ͵ͺ ȋȌ inadequate ǤǦͳͻManager’s Executive Order EDǦͲͻǡ ȋȌʹǤͲͷǤ͵ͲͳͲ Ǥ ͵ͺǤʹ͵ͲǤͲͶͲǡ ͳ Ǥ Ǥ
Section 2 – Conditions of Approval Ǥ ǣͳǤ ǡ ǡǡǡ ǤʹǤ ʹprior to occupancyǤ
SPR comments|
SPR submittal
GIBSON GUITAR DESIGN BUILD | 1894 ORVILLE WAY
GIBSON GUITTAR
377u
͵Ǥ prior to Site Plan approvalǤ ǡ County Clerk and Recorder’s office executed Waivers of Right to vement Districts (SID’s) for the following:Ǥ ͳͻ ǡ ȀǡǡǤǤ ͳͻStreet/Deadman’s Gulch and SimmenǤ Ǥ
In process with owner representative.
Section 3 – Required Code Corrections
PLANNING COMMENTS: ͳǤ Other Block Frontage Standards –͵ͺǤͷͳͲǤͲ͵ͲǤ
Ǥ
a. – Ȁ Ǥ Ǥ Ǥavailable, the departure criteria state “Façade transparency. Ȁ wall area.” Partially Addressed – Provide a physical glass sample or photo of a glass sample demonstrating transparency for storefront window types detailed in Sheet A1.02 used to meet transparency requirements.
b. See newest material board for sample of Solarban 60 glazing.
2. Site Design – ͵ͺǤͷʹͲǤͲͶͲǤǤͶǦǤ Ǥ ʹͲͲǤ Ǥ ʹͲͲǦǤPartially Addressed – Provide details on crosswalk materials per 38.520.040.C.3. Preformed thermoplastic must be inlaid not overlaid. a. See Civil Site Plan Details 3. Site Design –͵ͺǤͷʹͲǤͲͲǤ– ǤChain link fencing is not permitted to
screen solid waste enclosures.
a. See Architectural Enlarged Site Plans and Site Details for new
solid waste enclosure screen.
SPR comments|
SPR submittal
GIBSON GUITAR DESIGN BUILD | 1894 ORVILLE WAY
GIBSON GUITTAR
377u
4. Parking –͵ͺǤͷͶͲǤͲʹͲǤǦ ǤThe additional
landscape screening provided for the south parking lot should be relocated to be west of the snow storage provided between the shrubs and trees. Basically, swap the locations of the shrubs along the west side of the parking lot with the snow storage area to protect the landscaping from future snow removal damage.
See updated Landscape Plans
Advisory Comments: ͳǤ ͵ͺǤͲͲǤͳͲǡ ͵ͺǤͲͲǤͲͶͲǤ ǤʹǤ ǡ ̷ǤǤ
ENGINEERING COMMENTS, Cody Flammond, cflammond@bozeman.net: ͳǤ
Future Impact Fees Ǧ ǡǡ Ǥ ȀǤǤǤ
Note: With this memo, Staff has found the application to be inadequate for continued review. During review of subsequent revisions, additional conditions of approval may be recommended based on comments and recommendations provided by other applicable review agencies involved with the review of the project.