Loading...
HomeMy WebLinkAboutCORRECTIONS NARRATIVE BABCOCK HOUSE ADU 12-10-20 IAN MCNAIRY AIA | 340 Wiley St Ashland OR 97520 | p: (406) 599-3348 | www.ianmcnairy.com Date: 12/10/20 Project: Babcock House & ADU, Application 20-403 RE: Corrections narrative The following corrections have been made to the drawings in response to the corrections letter received. Document/Drawing Name Comment A1-1 Site plan Revised plan to show vision triangles at corners of Babcock & S. 6th, the house driveway and alley adjoining S. 6th, and the ADU driveway adjoining the alley. Revised parking space dimensions per corrections sheet Updated project summary including scope of work, unit count and lot areas per unit. The property will have 3-units total. (A 2-household dwelling and ADU) A2-3 & A2-4 House – Exterior elevations, A3-3 Combined elevations Per staff recommendations, construction of south façade dormer and north façade dormer cladding will match the existing half -timbering materials of stucco and trim work. The new roofing material will be asphalt shingles. Project Narrative Updated to reflect changes as noted above A-1 Application Updated to reflect changes as noted above